Ready project Auto Body Repair with an area of 300 m2.

CODE - PRS-035

Ready project Auto Body Repair with an area of 300 m2.

CODE - PRS-035


Project ready with:

Industry with the following sections:
Services
Workshop
Painting Room
Storage
Bathroom
Dressing Room
Pantry
Administration

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Auto Body Repair

How to start Auto Body Repair with an area of 300 m2. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Auto Body Repair

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

| Where to Buy Raw Material for Making Bar Soap | Layout of a Construction Materials Company | Oil Change Project | Agricultural Store Floor Plans | Fruits Vegetables And Legumes Layout | Open a Lighting Company | Floor Plan Of A Lingerie Store | Ingredients for Making Chewing Gum | How to Open a Cleaning Supplies Distributor | Daycare Project Templates | How to Set Up an Anaerobic WWTP | Meat Warehouse Projects | How to Set Up a Fish Refrigerator | Projects to Set Up a Hospital | How to Open a Medical Waste Company | Incinerator Budget | Motel Construction Budget | Internet Cafe Project Budget | Marmitex Supply | Example of a Ready-Made Gas Station Business Plan | Building Model for a Snack Bar | Massage Clinic Floor Plan | Syringe Factory | Gelcoating Machine Manufacturers | Raw Material Used to Make Jeans | Where to Buy Plaster Molds for Construction | How to Register the Manufacture of Plastic Cups | Sandblasting Booth Design | Set Up Squeegee Factory | Surfboard Flowchart | Which Professional Can Sign Concrete Post | Wet Wipes Company | Factory Floor Plan Example | Gas Cylinder Factory | How Much Does It Cost to Open a Clinical Analysis Laboratory? | Project Financing Template | I Want to Open an Epi Company | Automotive Painting Material List | Pickled Chicken Eggs | Hospital Standard Operating Procedures | Legislation Allows Painting of Cooking Gas Cylinders | Hydroponics Company Flowchart | Engineering Office Floor Plan | Molding Workshop Machines | Open a Cleaning Business | Bnds Eo Soda | Flowchart of a Bakery | Ready Construction Budget | Pulp Industry Floor Plan | Decree Technology | How to Create a Juice Schedule | How to Open a Dog Boarding Business in Your Backyard |

 

Other projects ready:

How to start Factory to Produce Fish Flour and Fish Oil with capacity for 5.000 Kg/day.
Project Industry to Produce Aerosol Products (Deodorant, Hairspray) with capacity for 5.000 Kg/day.
PDF Factory to Produce Sour Starch (produced with Manioc Starch) with capacity for 1.000 Kg per day.
Plant and layout Slaughterhouse for Bovines and Swines and Cold Meat Production (salsage, hams, Cold Meat and cured food) and Charque Processing - 200 animals/day - area of 3.100 m² (3.707,6 sq.yd).
Project Factory to Produce Fruit Sweets and Fruit Pulp with capacity for 300 Kg/day.
Project Factory Improvement of Coconut Water (Normal Pasteurization) with capacity for 5.000 liters/day.
FeasibilityFactory to Produce Mattress with capacity for 100 mattress per day.
Business plant Factory to Produce Sausages (with Carcass Reception) with capacity for 5.000 Kg/day.
Project Factory to Produce Corn Juice with capacity for 1.000 liters per day.
How to start Factory to Produce Banana Purée with capacity for 60.000 Kg/day.

Project - how to start Auto Body Repair with an area of 300 m2.