Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Cabinetmaking with capacity for 10 tons/day.
CODE - IND-M-083
Ready project Cabinetmaking with capacity for 10 tons/day.
CODE - IND-M-083
Project ready with:
Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Production Room
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Cabinetmaking
OPTIONAL SERVICES:
Financial Feasibility Study of Cabinetmaking with capacity for 10 tons/day.
Business plan for Cabinetmaking with capacity for 10 tons/day.
3D project of Cabinetmaking with capacity for 10 tons/day.
Projects with other capacities
Cabinetmaking
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Invest in Carpentry
|
Open a Carpentry Company
|
How to Invest in a Carpentry Shop
|
Carpentry Assembly Process
|
Financing to Start a Carpentry Shop
|
Carpentry Business Plan
|
How to Start a Macenary Business
|
Financing for Carpentry Repairs
|
How to Set Up an Ethanol Plant
|
Broiler Farm Financing
|
Floor Plan for Raising Rabbits
|
Setting Up a Perfume Cellar
|
I want to set up an electrical and plumbing supplies store
|
Oil Change Assembly Rj
|
How to Set Up a Pet Shop
|
Open Retail Fruits and Vegetables
|
Toy Rental Business Plan
|
Jewelry Floor Plan
|
Example of a Flowchart for Banana Candy Production
|
Food Distributor How to Set Up One
|
Tire Recycling Plant Floor Plan
|
Gastronomy School Flowchart
|
Charque Flowchart
|
Construction of pigsties Bnds
|
Birthing Center Project Model
|
X-Ray Plant Room
|
Organizational Chart of a Hospital in Vertical Direction
|
How Much Motel Budget
|
Setting Up a Water and Swimming Gym
|
How to Open a Lunch Box Business
|
Gas Station Plant Situation Cad
|
Fast Food Projects
|
Aesthetic Clinic Blueprints
|
Control in Diaper Manufacturing
|
Jewelry Factory Capacity Layout
|
Cloth Covering Template
|
Pillow Suppliers
|
Open a Plastic Injection Company
|
Making Piranha At Home Factory
|
Work From Home Assembling Clothespins
|
Learn How to Make Skates
|
Costs and Raw Materials for Making Concrete Posts
|
Steel Casting Factories
|
Assembling a Concrete L-Shaped Staircase
|
Floor Plan for Clinical Analysis Laboratories
|
Cost of Setting Up a Cheese Factory
|
How Much Does It Cost to Set Up a PPE Distributor?
|
How to Create a Mechanical Organization Chart
|
Standard Operating Procedures for Cleaning Medication Distribution
|
How to Put a Beauty Center Project on Paper
|
How to Set Up a Warehouse
|
Setting Up a Document Typing Company
|
Setting Up a Visual Communication Company
|
How Much Does It Cost to Set Up a Cell Phone Repair Lab
|
Winch Making Project
|
How to Start a Soft Drink Company
|
Ecological Brick Business
|
Snack Factory For 10000
|
Academic Works Opening a Cosmetics Factory
|
How to Make Natural Juice
|
How to Set Up a Kennel
|
Other projects ready:
How to start Industry Mineral Water Bottling with capacity for 30.000 liters/hour, in flagons of 10 and 20 liters and bottles of 1 and 2 liters.
Project Hostel with capacity for 300 Alojamentos.
PDF Factory to Produce Pasteurized Liquid Egg (1.000 liters/day), Freeze-Dried and Freeze-Dried Powder Egg (300 Kg/day).
Plant and layout Slaughterhouse Ovines with capacity to slaughter 50 animals/day.
Project Pastry Shop with an area of 70 m2.
Project Factory to Produce Powder Egg with capacity for 300 Kg/day.
FeasibilityFactory to Produce Condensed Soy Milk with capacity for 10.000 liters/day.
Business plant Factory to Produce Toothpaste with capacity for 50 Kg/day.
Project Factory to Produce Organic Cheese for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela) with an area of 122 m2 and capacity for 3.000 liters/day.
How to start Factory to Produce Sweet Milk produced with Milk Powder with capacity for 5.000 Kg/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US