Ready project Café with capacity for 15 people.

CODE - HT-044

Ready project Café with capacity for 15 people.

CODE - HT-044


Project ready with:

Enterprise with the following sections:
Main Lounge
Pantry
Kitchen
Bathrooms
Administration
Café
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Café

How to start Café with capacity for 15 people. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Café

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Coffee Shop Plant | Cafeteria Assembly Project | Coffee Shop Business Plan | Cafeteria Flowchart Template | Coffee Shop Layout Floor Plan | Coffee Shop Design Template | Cafeteria Project Floor Plan | How to Set Up Coffee Shops | Opening a Coffee Shop | Technology in Cafeterias | Cafeteria Floor Plan Equipam2centos | Coffee Shop Flowchart | Budget for setting up a coffee shop | Ht-044 | Cafeteria Design and Floor Plan | Coffee Shop Layout Template | Cafeteria Project Template | Cafeteria Project | How to Set Up a Coffee Shop Project | List of materials for coffee shops | Cafeteria Projects | Cafeteria Facade Models | Cafeteria Assembly | Cafeteria Model | Coffee Shop Model | Coffee Shop Design Templates | Cafeteria Legislation | Ready-Made Coffee Shop Business Plan | Business Plan for Cafeteria2c Ready | Coffee Shop Flowchart Template | Financial Viability of a Coffee Shop | Ready-made project for a coffee shop | Ready Projects Cafeteria | Companies Assembly Cafeterias | Cafeteria Floor Plan | Coffee Shop Projects | Organizational Chart of a Coffee Shop | Coffee Shop Business Plan | Environmental Legislation in Cafeterias | Stages of Development of a Cafeteria Project | Cafeteria Model | Coffee Shop Projects Plans | 3D Design of a Bookstore and Cafe | Coffee Shop Project Template | Financial Cafeteria | Coffee Shop Floor Plan | Cafeteria Legislation | Coffee Shop Project Timeline Template | Ready-made Cafe Layouts | 3d Cafe Facades | Production of Spray Deodorants | Computer Store Assembly | Description Project Company Safety Equipment | Gas station.dwg | Juice House Equipment | How to Start a Small Disposable Plastic Materials Business | Shirt Printing Machine Design | Price of crystallized sweets | How to Open a Beverage Resale Business | Scrap Yard Project | Computer Course Business Plan Template | Materials for a 500-Chicken Slaughterhouse | Society Field Plan | Dental Radiology Clinic Project | Floor Plan for a Dental Office | Restaurant Kitchen Model | Business Plan for an Urban Spa | Pizzeria Business Plan | What Is Needed to Set Up a Retirement Home | Setting Up a Massage Clinic | How to Set Up a Physiological Serum Industry | Decanter Project for Marble Works | T-Shirt Making Machines | How to Set Up a Sweater Manufacturing Business | Sandal Soles Factory | I Want to See Glass Vibrating Pool Models | How to Set Up a Barbecue Business with Sticks and Skewers | Requirements for Opening a Lumber Mill | Block Factory Assembly Site | Stove Production Flowchart | Physical Arrangement of Brick Factory | Equipment for Manufacturing Crop Sieves | What is needed to set up a cytopathology laboratory? | How to Start a Yogurt Manufacturing Business | Commercial Laundry Plants | Motorcycle Workshop Equipment | DWG Track Plan | Pops Pharmacy Cleaning Establishment | How to Create a Restaurant Hygiene Procedures Manual | I Want to Set Up a Podiatry Shop | Private Security Projects | How to Open an LPG Distribution | Ready Craft Project | How to Open a Taxi Company | Pop Feed Manufacturing | Technologies for Brick Manufacturing | Bread Factory Layout | Orange Juice Extraction Machine Drawing | How to Set Up a Shitake Greenhouse | Starch Extraction Machine | Financing Project for Opening Companies |

 

Other projects ready:

How to start Factory to Produce Fried Garlic and Grinded Garlic with capacity for 5.000 kg/day.
Project Factory for Manioc Fecula with capacity of 100.000 kg of Raw Material/day.
PDF Factory to Produce Cachaça (Liquor) made from Manioc with capacity for 1.000 liters/day.
Plant and layout Drink Deliverer with capacity for 3.000 liters/day.
Project Slaughterhouse Caprines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 10 animals/day.
Project Industry Mineral Water Bottling with capacity for 40.000 liters/hour, in flagons of 20 liters.
FeasibilitySlaughterhouse Wild Boar with capacity for 10 animals per day.
Business plant Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Whey Cheese, Butter, with capacity of 6000 liters/day.
Project Bonded Warehouse for Poultry Meat with capacity for 3.000 Kg/day.
How to start Factory to Recycle Paper with capacity for 1.000 Kg/day.

Project - how to start Café with capacity for 15 people.