Ready project Café with capacity for 30 people.

CODE - HT-045

Ready project Café with capacity for 30 people.

CODE - HT-045


Project ready with:

Enterprise with the following sections:
Main Lounge
Pantry
Kitchen
Bathrooms
Administration
Café
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Café

How to start Café with capacity for 30 people. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Café

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Company That Sets Up Coffee Shops | Feasibility Study for Coffee Shop | Cafeteria Consulting | Cafeteria Feasibility Study | Coffee Shop Design Template | What It Takes to Start a Waxing Business | How Much Does It Cost to Open an Electrical Hardware Store? | Layout for Perfume Store | Project to Set Up a Business for BNDES | Ready for Teens Project | How to Start a Gardening Business | Surf Shop Business Plan Template | Gingerbread Making Equipment | Pharmacy Compounding Plant | Budget Models for Tire Manufacturing | Culinary Flowchart | Cost of Slaughtering Cattle Deboning | Football Field Business Plan | Equipment I Need for a Radiology Clinic | How to Design a Medical Clinic | Industrial Kitchen Plant Designs | Feasibility of a Lottery | Bndes Finances Hotel Flats | Designing a Pizzeria | Flowchart of a House Construction | Horse Stall Design | Phytotherapy Business Plan | Marble Works Budget Template | Papercraft Project | How to Set Up a Bikini Sewing Factory | How to Set Up a Shoe Factory | Party Balloon Production | How to Make Charcoal for a Barbecue | P2F Products Open a Lumberyard | How to Set Up a SKATEBOARD Factory - Financing | Floor Plan of an Industry | Project for the production of a plastic cart | How to Make Expanded Clay | Wood for Making Cages | How to Set Up a Quality Program in the Workplace | Equipment for Manufacturing Standard Mines | How to Set Up a Hospital Laundry - ANVISA RDC-50 Standard | How Much Does It Cost to Set Up a Painting Shop | Ready-made Pop Templates | Ppho For Meat Industry | Optical Store Laboratory Floor Plan | Ready Inbound Tourism Business Plan | What You Need to Set Up a Construction Company | How to Set Up a Machinery and Equipment Assistance Workshop | How to Open a Cleaning Agency | Micro Animal Feed Factory | Tile Factory Ovens | Bakery Floor Plan Design | Making Wheat Snacks | Mushroom Processing | How to Make Banana Chips | Making Dog Biscuits |

 

Other projects ready:

How to start Shed to Cut Glass with capacity to Produce 100 m2/day.
Project Industry Mineral Water Bottling with capacity for 3.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups.
PDF Factory to Produce Disposable Syringe with capacity for 3.000 Syringes per day.
Plant and layout Factory to Recycle Paper with capacity for 10.000 Kg/day.
Project Factory to Produce Jelly Fruit with capacity for 1.000 Kg/day.
Project Factory Extration and Drying of Brazil Nut (Castanha-do-Pará) with capacity to produce 3.000 Kg per day.
FeasibilityFactory Improvement of Coconut Water (Normal Pasteurization) with capacity for 5.000 liters/day.
Business plant Factory to Produce Macaroni Rice with capacity for 3.000 Kg/day.
Project Factory to Produce Ice Ice Cream made from Fruit Pulp with capacity for 15.000 Kg/day.
How to start Clothing Industry to Produce Shorts with Laundry Sector (Stone Wash) with capacity for 200 garments/day.

Project - how to start Café with capacity for 30 people.