Ready project Comercial Laundry with capacity for 2.000 kg of Clothes per day.

CODE - LV-016

Ready project Comercial Laundry with capacity for 2.000 kg of Clothes per day.

CODE - LV-016


Project ready with:

Laundry with the following sections:

Reception
Packaging
Weighing
Classification
Washing
Sanitary Barrier
Drying
Ironing
Separation
Folding
Sewing
Distribution
Storage
Storage for Cleaning Material
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Comercial Laundry

How to start Comercial Laundry with capacity for 2.000 kg of Clothes per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Comercial Laundry

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Laundry Physical Arrangement | Laundry Opening | Commercial Laundry Project Layout | Value of Brown Sugar Factory Equipment | Quail Egg Farm In Santa Catarina Sc | Candy Flowchart | Ready Made Soap Machine Business Plan | Open an Electrical Material File | How to Set Up an Oil Change for Cars | Shed Plans | Cafeteria Project - Hot Cup | How to Open a Frame Shop | Clothing Alteration Store Models | Mocoto Manufacturing Process | Cad Beverage Deposit Plant | Ecological Asphalt Manufacturing Minas Gerais | Requirements for Opening a Technical School | Butcher Shop Design In Cad | Swine Partnership Business Plan | Setting Up an Outpatient Clinic | Set up a Radiology Clinic | Flowchart of a Dental Clinic | I want to set up a 3D cinema | How to Set Up Hotel Rooms | Financing at Gas Station | Beer Bar Liters Per Day | Project for a Beauty Clinic | Hydrophilic Cotton Making Machine | Paper Manufacturing Flowchart | Project to Build a Rag Doll Factory | Machinery for Making Nonwoven Fabric | Flip Flop Company Financial Plan | How to Set Up a Pet Bottle Factory | How to Assemble a Clothespin | END Miniature Factory | How to Make a Vibrating Table for a Slab | Speaker Factory | Scheme for Manufacturing Ecological Bricks | Setting Up a Signage Company | Clinical Analysis Laboratory Model | Cost of Setting Up a Yogurt Dairy | Laundry Project for Hotel | Mechanical Workshop Construction Plan | DWG Dry Port | Agricultural Exhibition Park Project Model | Sewing Studio Equipment List | Pest Control Quote Template | Insurance Broker Flowchart | How to Start a Bike Shop | Organizational Chart of a Promotions and Events Company | How to Set Up a Gardening Business | Setting up a Cement Tile Industry | Churros Enterprise | How to Set Up a Tapioca Biscuit Factory | How to Vacuum Pack Peeled Garlic | Equipment for Setting Up a Veterinary Clinic#q=equipment for setting up a veterinary clinic |

 

Other projects ready:

How to start Milk and Dairy Industry Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheeses (Provolon and Cured Ricota), with capacity of 3000 liters/day.
Project Factory to Produce Pamonha with capacity for 1.000 Kg per day.
PDF Factory to Produce Grated Coconut, Coconut Water and Coconut Milk with capacity for 5.000 Kg per day.
Plant and layout Milk and Dairy Industry for Fresh Cheeses (Minas Frescal, Ricota, Muzzarela) with area of 122 m² (145,91 sq.yd.) and capacity for 3.000 liters/day.
Project Slaughterhouse Bovines, Swines and Ostrich with capacity for 10 animals per day.
Project Industry Mineral Water Bottling with capacity for 3.000 liters/hour, in flagons of 20 liters.
FeasibilitySterilization Unit (by Low Temperature Steam and Formaldehyde) with capacity for 200.000 Units per day.
Business plant Factory to Produce Pepper Powder with capacity for 100 Kg/day.
Project Factory to Produce Fried Garlic and Grinded Garlic with capacity for 3.000 kg/day.
How to start Factory to Produce Chocolate Powder with capacity for 1.000 Kg/day.

Project - how to start Comercial Laundry with capacity for 2.000 kg of Clothes per day.