Ready project Comercial Laundry with capacity for 50 kg of Clothes per day.

CODE - LV-011

Ready project Comercial Laundry with capacity for 50 kg of Clothes per day.

CODE - LV-011


Project ready with:

Laundry with the following sections:

Reception
Packaging
Weighing
Classification
Washing
Sanitary Barrier
Drying
Ironing
Separation
Folding
Sewing
Distribution
Storage
Storage for Cleaning Material
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Comercial Laundry

How to start Comercial Laundry with capacity for 50 kg of Clothes per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Comercial Laundry

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Commercial Laundry Project Template | How to Acquire Resources to Set Up a Laundromat | Laundry Financing | Project Plan for Commercial | With 50 thousand I set up a laundry | How to Make a Laundry Commercial | Laundry Financing | DWG Project of a 50 kg Laundry | Names of cleaning products factories | How to Set Up a Micro Detergent Factory | Set Up Small Screw Factory | How to Set Up an Oil Sales Store | Trade Names for Chicken | How to Draw a Bakery Uam Layout | How to Assemble a Tempered Glass Factory | Resources for Building a Clothing Store | List of materials to start making chocolates | Beverage Distributor Flowchart | Equipment for a Nursery | Organic Composting Project | Pururuca Supplier | Fish Cold Storage Business Plan | Central Sterilization Areas | Assemble Trash Incinerator | Equipment Needed to Set Up a Vaccination Room | Project One Motel | Investment to Open a Pastry Shop | Kitchen Utensils To Make Marmitex For Sale | Cost to set up a sauna.. | Cafeteria Assembly Project | Template With Photo Of A Blood Collection Room | Glass Factory Floor Plan | Cost of Setting Up a Linferie Industry | How to Set Up a Raffia Bag Factory | PVC Lining Factory Model | Block Machine Design | Ready Briquette Project | Pallet Feasibility Project | How to make a slab | Egg Box Factory | DWG Projects for Metalworking | How to Build a Zinc Plating Business | Soil Laboratory Assembly Project | Cheese Factory Business Plan | Cachaça Manufacturing Company and Its Financial Plan | Boat Assembly Schedule Template | Food Smoker Projects | Hospital Pop | Gas Dist Project | Model of plans for warehouses | I Want to Set Up a Monitoring Company | Ready Projects Law Office | How to Set Up an Automation Workshop | Set updexeroxstore | Pig Farm Facilities Floor Plan | Machinery for Setting Up a Cheese Bread Factory | What do I need to open a pancake shop? | Mayonnaise Flowchart | Seed Processing Unit Layout | Powdered Soft Drink Manufacturing Process | Dog Hotel Project |

 

Other projects ready:

How to start Industry to Produce Body Soap and Soap in Bars with an area of 180 m² and capacity for 1.000 kg/day.
Project Factory to Produce Chocolate Powder with capacity for 5.000 Kg/day.
PDF Swine Farm (with Overlapping Bed) with capacity to Produce 784 Matrix.
Plant and layout Slaughterhouse Ovines with capacity to slaughter 200 animals/day.
Project Factory to Produce Macaroni Rice with capacity for 10.000 Kg/day.
Project Slaughterhouse for Bovines and Swines and Cold Meat Production (salsage, hams, Cold Meat and cured food) and Charque Processing - 150 animals/day - area of 1.800 m² (2.152,8 sq.yd).
FeasibilityFootwear Industry to Produce Boots with capacity for 100 pairs/day.
Business plant Factory to Recycle Plastic with capacity for 3.000 Kg/day.
Project Factory to Produce in Natura Pepper with capacity for 1.000 Kg/day.
How to start Bonded Warehouse for Poultry Meat with capacity for 1.000 Kg/day.

Project - how to start Comercial Laundry with capacity for 50 kg of Clothes per day.