Ready project Confectionery with capacity for 1.000 Kg/day.

CODE - TRG-117

Ready project Confectionery with capacity for 1.000 Kg/day.

CODE - TRG-117


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking de Raw Material
Storage for Additives and Ingredients
Storage for Packages
Production
Storage for Finished Products
Cold Chamber
Offices
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Confectionery

How to start Confectionery with capacity for 1.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Confectionery

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Confectionery Business Plan | How to Create a Bakery Floor Plan | Investment Confectionery | Structure for Setting Up a Quail Egg Farm | Chocolate Production Process | Cleaning Products With Layout | How to Start a Musical Instrument Business | How to Open an Oil Change Company | How Much Does It Cost to Set Up a Tobacco Shop? | Churros Supplier | Home Appliances Store Layout | Supply List for Hardware Store | Jelly Manufacturing Flowchart | Examples Of Beverage Trade Sjc | Industry Recycling Rubble | How to Acquire a Nursing Technical School Project | Work Eotina Of A Butcher Shop | How is sanitation carried out in a beef slaughterhouse? | Outpatient clinic.dwg | Radiology Clinic Organizational Chart Template | Dental Clinic Business Plan Template | Italian Restaurant Business Plan | Set Up a Movie Theater with 3D Display | How to Make a Campsite Floor Plan | Step by Step Guide to Opening a Gas Station | Name Suggestions for Nursing Homes | Floor Plan Of A Beauty Center | Toothpaste Production | How to Start a Candle Making Business | Guero Making Berbudas | What Machine Makes Underwear? | Physical Arrangement of a Footwear Company | Artificial Flower Industry In The State Of Sp | Tooth Factories | Shopping Dwg Project | How to Set Up a Precast Slab Factory | Ready Made Electronics Cad Projects | Brick Factory Project | How to Set Up a Small Foundry Factory Give Examples | How to Set Up a Clinical Analysis Clinic | I want to set up a yogurt factory | Industrial Laundry Business Plan | Drawings for Motorcycle Workshops | How Much Does It Take to Build a Wooden Skate Park? | Standard Operating Procedure Examples | Wood for the vaquejada track | Materials for a Sewing Studio | Bndes Financing Fish Breeding | Setting Up a Company's Logistics | Set Up Bicycle Repair Shop | Computer Networking Business Plan | Composting Industry Project | Vibrating Table Design for Bricks | Economic and Financial Feasibility Project Resource | Coffee Processing Project | Raw Material Supplier for Paprika Factory | How to Make Pine Nut Flour | Veterinary Clinic Model |

 

Other projects ready:

How to start Factory to Produce Popsicles with capacity for 1.000 Kg/day.
Project Farm Quail Breeding with capacity for 10.000 Birds per day.
PDF Factory Extraction of Chestnut Shell Liquid (LCC) with capacity for 1.000 liters/day.
Plant and layout Factory to Produce Grated Coconut, Coconut Water and Coconut Milk with capacity for 1.000 Kg per day.
Project Factory to Produce Sweet Milk produced with Milk Powder with capacity for 100 Kg/day.
Project Medicine Deliverer with an area of 2.500 m².
FeasibilityFactory Milk Powder Packing (with Mixture) with capacity for 13.000 Kg/day.
Business plant Industrial Kitchen with Restaurant with capacity for 400 meals per day.
Project Factory to Produce in natura Garlic with capacity for 5.000 Kg per day.
How to start Chinese Kitchen with capacity for 100 meals per day.

Project - how to start Confectionery with capacity for 1.000 Kg/day.