Ready project Confectionery with capacity for 5.000 Kg/day.

CODE - TRG-119

Ready project Confectionery with capacity for 5.000 Kg/day.

CODE - TRG-119


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking de Raw Material
Storage for Additives and Ingredients
Storage for Packages
Production
Storage for Finished Products
Cold Chamber
Offices
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Confectionery

How to start Confectionery with capacity for 5.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Confectionery

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Confectionery Plant Template | Confectionery Business | I Want to See a Model of Facilities for Raising Rabbits | Liquid Soap Production Machine | Construction Materials Store Layout Project | What Do I Need to Set Up an Oil Change? | Cost of Setting Up an Agricultural Store | Fruit Business Plan Template | Names for Setting Up a Gas Company | Lingerie Store Facilities | Chewing Gum Processing | Layout of a Distributor | Daycare Schedule Template | Virtual Project Office | How to Create a Sausage Making Plan | Complete Low Plnata Pig Farm Project | Documents for Setting Up a Day Hospital | Investment in Dental Radiology Clinic | How to Assemble an Audimetry Equipment | Drive Motel Project | Viability for Swimming Academy | How to Set Up a Lunchbox Store | Gas Station Project .dwg | How to Set Up a Snack Bar | Beauty Clinic Poços De Caldas | Injectable Manufacturing | Resin for Making Synthetic Marble | Jeans Lay Out Manufacturing Project | Stockings Factory | Opening a Plastic Injection Company | How to Make a Homemade Sandblasting Machine | Clothespin Assemblies At Home | Skateboard Manufacturing Business | How to Make a Concrete Post | Sewing Workshop for Strainers | WHAT IS NEEDED TO Assemble A Zinc Plating Plant | Gas Cylinder Factory | Clinical Analysis Laboratory Project | Cheese factory | I Want to Open an Epis Store | Mechanical Repair Shop Business Plan Template | Artistic Gymnastics Project Template | How to Set Up Standard Operating Procedures | Design of a Beauty Center | Open Cartridge Recycling Company | Condominium Administrator Organization Chart | How Much to Invest in an Office | Computer Maintenance Workshop Template | Project to Set Up a Towing Service | Soft Drink Manufacturing Equipment | Instant Noodles Equipment | Banana Jam Making Machines | How to Open a Juice Factory | View Kennel Model |

 

Other projects ready:

How to start Slaughterhouse Swines, Caprines, Ovines with capacity for 5 animals per day.
Project Factory for Matutinal Cereal production with 250m² (299 sq.yd.) area and capacity of 1.500 kg/day.
PDF Factory to ProProduce Fruit Sweet in Syrup with capacity for 3.000 Kg/day.
Plant and layout Factory Improvement of Vegetables (lettuce, acelga (swiss chard), borecole, cabbage, carrot, beetroot, cucumber, beans-string bean, cauliflower and broccoli) with capacity to produce 1.000 Kg per day.
Project Peanut Candy Factory (Pé-de-Moleque, Paçoca,CrocCandy, Gibi), with capacity for 1.000 Kg/day.
Project Slaughterhouse Turkey with capacity for 100 animals per day.
FeasibilitySterilization Unit (by Ethylene Oxide) with capacity for 20.000 Units per day.
Business plant Cowshed for Milk Cattles with capacity for 60 Cows, with Automatic Milking and Built area of 550 m², for Type B Milk.
Project Factory to Produce Gauze Compresses and Cotton Yarn Bandage (with Sterilization in Autoclbird) and capacity for 100.000 compresses (200 packages with 500 compresses) per day.
How to start Marble and Granite Factories to Produce Cutted and Polished Stones and to Cut Marble and Granite Floors with capacity for 8 Blocks per Week.

Project - how to start Confectionery with capacity for 5.000 Kg/day.