Ready project Confectionery with capacity for 5.000 Kg/day.

CODE - TRG-119

Ready project Confectionery with capacity for 5.000 Kg/day.

CODE - TRG-119


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking de Raw Material
Storage for Additives and Ingredients
Storage for Packages
Production
Storage for Finished Products
Cold Chamber
Offices
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Confectionery

How to start Confectionery with capacity for 5.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Confectionery

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Confectionery Business | Confectionery Plant Template | I Want to See a Model of Facilities for Raising Rabbits | Liquid Soap Production Machine | Construction Materials Store Layout Project | What Do I Need to Set Up an Oil Change? | Cost of Setting Up an Agricultural Store | Fruit Business Plan Template | Names for Setting Up a Gas Company | Lingerie Store Facilities | Chewing Gum Processing | Layout of a Distributor | Daycare Schedule Template | Virtual Project Office | How to Create a Sausage Making Plan | Complete Low Plnata Pig Farm Project | Documents for Setting Up a Day Hospital | Investment in Dental Radiology Clinic | How to Assemble an Audimetry Equipment | Drive Motel Project | Viability for Swimming Academy | How to Set Up a Lunchbox Store | Gas Station Project .dwg | How to Set Up a Snack Bar | Beauty Clinic Poços De Caldas | Injectable Manufacturing | Resin for Making Synthetic Marble | Jeans Lay Out Manufacturing Project | Stockings Factory | Opening a Plastic Injection Company | How to Make a Homemade Sandblasting Machine | Clothespin Assemblies At Home | Skateboard Manufacturing Business | How to Make a Concrete Post | Sewing Workshop for Strainers | WHAT IS NEEDED TO Assemble A Zinc Plating Plant | Gas Cylinder Factory | Clinical Analysis Laboratory Project | Cheese factory | I Want to Open an Epis Store | Mechanical Repair Shop Business Plan Template | Artistic Gymnastics Project Template | How to Set Up Standard Operating Procedures | Design of a Beauty Center | Open Cartridge Recycling Company | Condominium Administrator Organization Chart | How Much to Invest in an Office | Computer Maintenance Workshop Template | Project to Set Up a Towing Service | Soft Drink Manufacturing Equipment | Instant Noodles Equipment | Banana Jam Making Machines | How to Open a Juice Factory | View Kennel Model |

 

Other projects ready:

How to start Factory to Produce Fruit Sweets and Fruit Pulp with capacity for 3.000 Kg/day.
Project Slaughterhouse Quail with capacity for 10.000 animals per day.
PDF Factory to Produce Frozen Pre-Fried Cassava and Stick Cassava (Manioc) with capacity for 2.000 Kg/day.
Plant and layout Factory to Produce Furniture with an area of 3.000 m2.
Project Honey Warehouse with Reception of Honey in Plastic Tanks with capacity to Produce 300 liters/day.
Project Factory to Produce Cold Meat, Charque Dried Salted Meat and Jerked Beef (with Deboned Meat Reception) with capacity for 3.000 Kg/day.
FeasibilitySlaughterhouse Bovines and Swines with capacity to Slaughter 700 animals/day.
Business plant Factory of Vegetables in Conserve (Corn in conserve, Peas in conserve, Potato in Conserve , Carrot in Conserve, Selected Legumes in Conserve) with 180m² (215,28 sq.yd.) and capacity of 2.000 kg/day.
Project Factory to Produce Ready Frozen Raw Savory Pastries (Salgadinhos) (Coxinha, Pasty, Esfiha, Kibe, Hamburger) with capacity for 500 Kg/day.
How to start Factory to Produce Yam Flour with capacity for 1.000 Kg per day.

Project - how to start Confectionery with capacity for 5.000 Kg/day.