Ready project Drink Deliverer with capacity for 15.000 liters/day.

CODE - DT-024

Ready project Drink Deliverer with capacity for 15.000 liters/day.

CODE - DT-024


Project ready with:

Deliverer with the following sections:
Reception for Raw Material
Storage for Raw Material
Bottling
Storage for Finished Products
Expedition
Office
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Drink Deliverer

How to start Drink Deliverer with capacity for 15.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Drink Deliverer

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Beverage Investment Project | Opening of Beverage Distributor | Project Model Within a Beverage Distributor | Beverage Deposit Example | Opening a Beverage Distribution Company | Beverage Distributor Investment | Beverage Distributor Names | Beverage Distributor Project Investment Structure | Chicken Farm Equipment Layout | How to Set Up a Cleaning Products Factory | How to Set Up a Homemade Soap Factory | Building Material Store Model Project | How Much Does It Cost To Open An Oil Change Shop? | How to Produce Food for Celiacs | Fruit Retail. How to Set Up One | What to Sell Pool Shop | Country Store Facade | Coconut Candy Making Machines | How to Set Up a Cold Cuts Distribution Company | What do I need to set up a nursery, with | Mini Treatment Units for Marble Works | Machines for making greaves | How to Make a Fish Refrigerator Flowchart | How to Set Up a Psychopedagogical Room | Garbage Incinerator Machine | Hospital Incinerator | Lan House Design | Assemble Kitchen Sell Marmitex | Gas Station Business Plan | Model Cafe Floor Plan | To Open A Massage Parlor What Is Needed | How to Set Up an Ethylene Oxide Sterilization Plant | What Are the Procedures for Building a Marble Factory? | Parts Used to Assemble Ironing | Start Plaster Factory | Equipment for setting up a glass factory | Manufactures Granulated Polystyrene | Briquettes Business Plan | Cost of Wood to Assemble Pallets | Academic Work Plaster | Wet Wipe Production | Price to Set Up an Aluminum Recycling Plant | Cylinder Manufacturing | How to Set Up a Soil Laboratory | Cheese Production Project | GMP in Industries | Automotive Painting Quote Template | Freeze-drying Financing | Hospital Pharmacy Pop Template | Project for Gas Distributor | Wooden Shed Drawings | How to Open an Exchange Agency | Law Office Facade Template | Open a Washing Machine Repair Company | How to Set Up a Notary Office | Energy Factory in Brazil | Pre-baked bread | English Cake How to Assemble a Plant | Palm Heart Factory Equipment | Coffee Manufacturing Layout | Passion Fruit Juice Factory Cost | Hotel Viability |

 

Other projects ready:

How to start Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Candy Milk, Whey Cheese, Butter, Yogurt, Milk Beverages, Packed Milk types B and C, with capacity of 2000 liters/day.
Project Factory to Produce Ice Lolly Stick with capacity for 100 Kg/day.
PDF Factory to Produce Sour Starch (produced with Manioc Starch) with capacity for 500 Kg per day.
Plant and layout Nursery and Day Care with capacity for 10 children.
Project Shed for Quails to Produce de Commercial Eggs with capacity for 3.000 Eggs/day.
Project Factory to Produce Vinegar made from Honey with capacity for 10.000 liters/day.
FeasibilityFactory to ProProduce Fruit Sweet in Syrup with capacity for 10.000 Kg/day.
Business plant Milk and Dairy Industry for Organic Goat Milk Packing, with an area of 95 m2 and capacity for 3.000 liters/day.
Project Cold Storage Room to Process Stunned Shrimps (from Marine Fisheries) with capacity to Produce 60.000 Kg/day.
How to start Clothing Industry to Produce Coarse Linen Shorts (cotton and flax) with capacity for 200 garments/day.

Project - how to start Drink Deliverer with capacity for 15.000 liters/day.