Ready project Factory Fruit Improvement with capacity for 15.000 Kg per day.

CODE - VEG-F-013

Ready project Factory Fruit Improvement with capacity for 15.000 Kg per day.

CODE - VEG-F-013


Project ready with:


Industry with the following sections:

Reception
Cleaning and Selection
Area para Washing
Cold Chamber for Stocking (02 units)
Processing Room
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory Fruit Improvement

How to start Factory Fruit Improvement with capacity for 15.000 Kg per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory Fruit Improvement

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Fruit Processing Project Model | Chicken Shed Cleaning Machine | Cosmetic Factory Project Template | Complete Goat Farm Installation Plan | Digital Development Equipment Set Up Store | How to Set Up a Remoud Tire Factory | Set up Financial Rotisserie | Step by Step Acrylic Box Assembly | Equipment Needed to Set Up a Fabric Store | Layout of a Pharmaceutical Company | How to Open a Grocery Store | Children's School Business Plan | Floor Plan of Cattle Slaughterhouse | Hamburger Factory Names | Sports Gym Floor Plan | Medical Clinic Enterprise | Family Health Program How to Set Up | How to Set Up a Basic Health Care Room | Work on Business Plan of a Buffet | Examples of Guest House Floor Plans | Making a concrete kitchen | How to Open a Swing House in Df | Car Wash Business Plan | Children's Buffet Facade With Lists | Pharmaceutical Industry Organization Chart | Setting up a foam factory | Clothing Manufacturing Flowchart Template | How to Assemble Uniform Projects | Non-woven Bag Manufacturing Course | Styrofoam Tray Factory | School Desks - Main Raw Material | Dwg Wooden Frames | M3 Concrete Enterprises Ltd. | I want to make kites | Aluminum Squadron How to Assemble | Hot Galvanizing Want to Assemble | Materials Needed to Set Up a Prosthesis Laboratory | Ranking of Liquid Chocolate Drinks in Brazil | Good Practices Manual Template for Clinical Analysis Laboratory3e | Economic Feasibility Study Flowchart | Pop Recall How to Do It for the Food Industry | Guide to Operational Procedures for a Restaurant | Plant of a Flower Shop | To Set Up a Service Provision Company | Car Rental Company Viability | Accounting Office Decoration Projects | How Much Does It Cost to Set Up a Fire Extinguisher Refilling Company | How to Set Up a Pig Farm | What You Need to Set Up a Bakery | Cream Cracker Biscuit Processing | Bean Processing Flowchart | Fruit Processing Machines | Pepper Sauce Factory Rj | Pet Shop Flowchart Template |

 

Other projects ready:

How to start Factory to Produce Banana Sweet with capacity for 100.000 Kg/day.
Project Supermarket with an area of 300 m2.
PDF Cachaça (Liquor) and Brandy Bi-Distillary, with capacity of production for 10.000 liters/day.
Plant and layout Factory to Produce Coconut Water with Ultraviolet Sterilization with capacity for 10.000 liters/day.
Project Frog Meat Processing with capacity for 300 frogs per day.
Project Factory to Produce Crystallized Candies with capacity for 3.000 kg/day.
FeasibilityFactory Glass Recycling with capacity for 3.000 Kg/day.
Business plant Self Service Restaurant with capacity for 300 meals per day.
Project Milk and Dairy Industry to Produce Ultrafiltration Fresh Cheese with capacity for 70.000 liters of Milk per day.
How to start Pastry Shop with an area of 50 m2.

Project - how to start Factory Fruit Improvement with capacity for 15.000 Kg per day.