Ready project Factory Malt Roasting with capacity to produce 1.000 Kg per day.
CODE - VEG-154
Ready project Factory Malt Roasting with capacity to produce 1.000 Kg per day.
CODE - VEG-154Project ready with:
Industry with the following sections:
Reception Platform
Storage of Raw Material
Toasting
Employees Entrance
Storage for Packages
Storage for Packed Product
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory Malt Roasting
OPTIONAL SERVICES:
- Financial Feasibility Study of Factory Malt Roasting with capacity to produce 1.000 Kg per day.
- Business plan for Factory Malt Roasting with capacity to produce 1.000 Kg per day.
- 3D project of Factory Malt Roasting with capacity to produce 1.000 Kg per day.
Projects with other capacities
Factory Malt Roasting
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Malt Enterprise | Roasting Company2c Set Up | Roasting Models | Ready-made Perfume Flowcharts | want to build a house with electrical materials | Assemble Oil Change | How to Set Up an Agricultural Products Store | Vegetables and Legumes Business | Toy Rental Business Plan | Equipment for Setting Up a Jewelry Store | Banana Candy Factory Address | Cost of Food Distribution | Investments in Tire Recycling | I want to set up a culinary school | Mechanized Meat | How to Set Up a Pigsty | Normal Birthing Center Equipment | Requirements to Open a Dental Radiology Clinic | Simple Org Chart Templates2c Pharmaceutical Flowchart and Layout | How Much Does It Cost to Build a Motel? | Swimming Project Templates With Payment Schedule | How to Open a C2B4 Location to Serve Marmitex | Gas Station Plants | Project I Want to Set Up a Fast Food | Aesthetic Plant | How to Start a Diaper Business | Jewelry Enterprise | Company That Manufactures Machines For Cloth Strainers | Pillow Factory2fmantas | What is the cost of setting up a plastics industry? | Make Hair Clips at Home | Work From Home With Assembly2f Clothespins | Skateboard Business Plan | How to Assemble a Concrete Mixer | Mattress Production Plant | I want to set up a foundry that I do | Domestic Cachaça Production | Clinical Analysis Laboratory Floor Plan | Cost of Cheese Factory Equipment | Business Plan - Epi | As an Academic Mechanical Workshop | Standard Operating Procedure Traceability | Beauty Center Is A Good Business | What You Need to Set Up an Optician's Shop | Loan to Start a Typing and Printing Business | How Much Does It Cost to Start a Visual Communication Company? | What Tools Do I Need to Set Up a Cell Phone Repair Shop? | Plants Towing Company | How to Set Up a Soda Factory | Ecological Brick Viability | Sweet and Savory Business Tips | Machinery for Preparing Tomato Extract | How to Set Up a Natural Juice Factory | Kennel for Floor Plan |
Other projects ready:
How to start Factory to Produce Banana Sweet with capacity for 120.000 Kg/day.
Project Factory to Produce Vinegar made from Banana with capacity for 100 liters/day.
PDF Sterilization Unit (by Hydrogen Peroxide Plasma) with capacity for 100.000 Units per day.
Plant and layout Factory to Produce Milk Powder with capacity for 3.000 liters/day.
Project Factory to Produce Ketchup with capacity for 30.000 Kg per day.
Project Factory Bean Improvement with capacity to produce 3.000 Kg per day.
FeasibilityFactory to Produce Crackling (Torresmo), Crisps Baked Pork Meat (Pururuca), Skin Ready to Fry and Pig Lard with capacity to produce 1.000 Kg/day.
Business plant Factory to Produce Raisins Cashew Nuts, Cashew Syrup, Crystallized Cashew, Cashew Jelly and Toasted Cashew Nut with capacity for 3.000 Kg per day.
Project Factory to Produce Soap Powder with capacity for 3.000 Kg/day.
How to start Factory to Produce Ice Cream and Fruit Pulp (Ice Cream + Pulp) with capacity for 500 Kg/day.



