Ready project Factory Malt Roasting with capacity to produce 5.000 Kg per day.

CODE - VEG-156

Ready project Factory Malt Roasting with capacity to produce 5.000 Kg per day.

CODE - VEG-156


Project ready with:


Industry with the following sections:

Reception Platform
Storage of Raw Material
Toasting
Employees Entrance
Storage for Packages
Storage for Packed Product
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory Malt Roasting

How to start Factory Malt Roasting with capacity to produce 5.000 Kg per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory Malt Roasting

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Roasting Factory | Cattle Fattening Shed | Business Plan3a Cell Phone Store | How to Start a Battery Store | Basics for Setting Up a Stationery Store | How to Set Up a Food Supplement Distributor | How to Open a Mattress Store | Set Up Clothing Store Bndes | Machine for manufacturing Pop Candies and Lollipops | Business Project for Opening a Pharmacy | Layout for Recycling Plant | Tutoring Materials List Template | Municipal Bovine Slaughterer | Assemble Skewers | I want to build a society | Acupuncture Project | Physiotherapy Clinic Layout Study | How to Build a Hostel | Holiday Camp Floor Plan | Pay-to-FishingModels | Plan of a Cachacaria | Car Wash Building Floor Plan | Artisanal Cigarette Manufacturing Health | T-Shirt Production Feasibility Project | Plastic Packaging Industry Project | Office Supply List Template | Assemble Block Factory | Mattress Factory - Flowchart | How to Set Up a Bag Factory | Legislation for the Manufacture of Parmesan Cheese | Motorhome Assembly Project | Bedroom House Projects DWG | Examples of Pop from a Drugstore | Pop Drugstore Pest Control and Rodent Control | How to Set Up Your Locksmith Workshop | What to Do to Open an Ecotourism Business | Business Plan Template for Opening a Construction Company | Stage Assembly Model | Construction Materials Budget for Rãnario | Ice Cream Making | Technology for Confectionery | Ready Model Irrigation Project | How to Make Piqui Preserve | How to Start a Pamonha Factory | Cost to Set Up a Beauty Clinic Salon |

 

Other projects ready:

How to start Marble and Granite Factories to Produce Cutted and Polished Stones and to Cut Marble and Granite Floors with capacity for 10 Blocks per Week.
Project Factory to Produce Disposable Syringe with capacity for 10.000 Syringes per day.
PDF Self Service Restaurant with capacity for 50 meals per day.
Plant and layout Factory to Produce Sealing for Plates with capacity for 500 Kg/day.
Project Factory to Produce Vegetal Coal with capacity for 3.000 Kg/day.
Project Lottery Agency with an area of 15 m2.
FeasibilityFactory to Produce Pickles with capacity for 10.000 Kg per day.
Business plant Tattersall (for Rodeo) with capacity for 1.000 people.
Project Laboratory to Produce Parental Controls with capacity for 1.000 kg/day.
How to start Factory to Produce Corn Flour, Corn Flakes and Corn for Canjica with capacity for 1.000 Kg per day.

Project - how to start Factory Malt Roasting with capacity to produce 5.000 Kg per day.