Ready project Factory Malt Roasting with capacity to produce 5.000 Kg per day.
CODE - VEG-156
Ready project Factory Malt Roasting with capacity to produce 5.000 Kg per day.
CODE - VEG-156Project ready with:
Industry with the following sections:
Reception Platform
Storage of Raw Material
Toasting
Employees Entrance
Storage for Packages
Storage for Packed Product
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory Malt Roasting
OPTIONAL SERVICES:
- Financial Feasibility Study of Factory Malt Roasting with capacity to produce 5.000 Kg per day.
- Business plan for Factory Malt Roasting with capacity to produce 5.000 Kg per day.
- 3D project of Factory Malt Roasting with capacity to produce 5.000 Kg per day.
Projects with other capacities
Factory Malt Roasting
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Roasting Factory | Cattle Fattening Shed | Business Plan3a Cell Phone Store | How to Start a Battery Store | Basics for Setting Up a Stationery Store | How to Set Up a Food Supplement Distributor | How to Open a Mattress Store | Set Up Clothing Store Bndes | Machine for manufacturing Pop Candies and Lollipops | Business Project for Opening a Pharmacy | Layout for Recycling Plant | Tutoring Materials List Template | Municipal Bovine Slaughterer | Assemble Skewers | I want to build a society | Acupuncture Project | Physiotherapy Clinic Layout Study | How to Build a Hostel | Holiday Camp Floor Plan | Pay-to-FishingModels | Plan of a Cachacaria | Car Wash Building Floor Plan | Artisanal Cigarette Manufacturing Health | T-Shirt Production Feasibility Project | Plastic Packaging Industry Project | Office Supply List Template | Assemble Block Factory | Mattress Factory - Flowchart | How to Set Up a Bag Factory | Legislation for the Manufacture of Parmesan Cheese | Motorhome Assembly Project | Bedroom House Projects DWG | Examples of Pop from a Drugstore | Pop Drugstore Pest Control and Rodent Control | How to Set Up Your Locksmith Workshop | What to Do to Open an Ecotourism Business | Business Plan Template for Opening a Construction Company | Stage Assembly Model | Construction Materials Budget for Rãnario | Ice Cream Making | Technology for Confectionery | Ready Model Irrigation Project | How to Make Piqui Preserve | How to Start a Pamonha Factory | Cost to Set Up a Beauty Clinic Salon |
Other projects ready:
How to start Animals Hotel with capacity for 10 animals.
Project Honey Warehouse with Reception of Honey in Plastic Tanks with capacity to Produce 10.000 liters/day.
PDF Factory to Process Canned Mushroom and Mushroom Cultivation with capacity for 1.000 kg per day.
Plant and layout Factory to Produce Chocolate Powder with capacity for 1.000 Kg/day.
Project Farm to Produce and Slaughter Country Chicken (Frango Caipira) with: Farm and Slaughterhouse, and capacity for 3.000 Chickens per day.
Project Factory to Produce Pepper Paste with capacity for 5.000 Kg per day.
FeasibilityFactory to Produce Fruit Juice with capacity for 500 liters/day.
Business plant Factory to Produce Ready Frozen Raw Savory Pastries (Salgadinhos) Assados e Fritos (Coxinha, Pasty, Esfiha, Kibe, Hamburger) with capacity for 1.000 Kg/day.
Project Industry to Produce Body Soap and Soap in Bars with an area of 180 m² and capacity for 1.000 kg/day.
How to start Industry to Produce Shampoo and Body Soap with capacity for 20.000 kg/day.



