Ready project Factory Milk Powder Packing with capacity for 13.000 Kg/day.

CODE - LTC-094-E

Ready project Factory Milk Powder Packing with capacity for 13.000 Kg/day.

CODE - LTC-094-E


Project ready with:


Industry with the following sections:

Reception Platform of Milk Powder
Physical and Chemical Laboratory
Microbiological Laboratory
Production Room
Packing Room
Cold Chamber
Expedition
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory Milk Powder Packing

How to start Factory Milk Powder Packing with capacity for 13.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory Milk Powder Packing

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

| Motorcycle Shop Layout | What Is Needed To Assemble A Motorcycle Part | Roast Chicken Sale Business | Fishmonger Projects | How to Set Up a Blinds Resale and Installation Store | Plan to Set Up Children's Clothing Store | Basic Food Basket Start a Business | DWG Model Of Elderly Flow | Flowchart of Cattle Slaughtering Plant | Filling for coxinha | Physical Structure for Construction of Pig Slaughterhouse | Material and Sterilization Center Cleaning Room | PSF Situation Room | Ambulance Design Template | Assemble Gym Floor Plan | Building Plan for a Guest House | Lealt of an Industrial Kitchen and Its Flowchart | Organizational Charts of a Nightclub | Open Greek Barbecue | Residential Building Project .dwg | How to Make Tablet | How Does A Tire Retread Count? | Set up a Lamgerie Factory | I Want to Open a String Factory | How to Open a Mini Plastic Bag and Bag Factory | Step by Step Styrofoam Parts | How to Start a Macenary Business | How to Set Up a Toothpick Industry | Legislation for Setting Up a Mortar Factory | Medicine Blister Printing Company | Anodizing Factory In -bh | How Much Does It Cost to Set Up a Small Machining Workshop | Dental Prosthesis Laboratory Price List | How Milk Powder is Made | Production Manual Template Related to Food Company | Rubber Factory Flowchart | Quail Eggs Project | Pop Standard Procedures | Catalog of Names for Cleaning Companies | How to Set Up a Manicure Business | Open a Vehicle Agency | Business Plan Template for Accounting Office | Fire Extinguisher Refill Business | List of Material for Hot Dog Sales | Pig Shed Plant | How to Make Cereal Bars | Bread Factory How to Prepare | Dureino Pepper Grinding Factory | How to Build a Metal Grain Silo | Bone Factory |

 

Other projects ready:

How to start Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cheese with Blue mould (Roquefort, Gorgonzola), Cheese with White mould (Camembert, Brie), with capacity of 5000 liters/day.
Project Factory for Manioc (Cassava) Starch with capacity for 10.000 kg de polvilho per day.
PDF Factory to Produce Banana Sweet with capacity for 1.000 Kg per day.
Plant and layout Factory to Produce Pequi Paste and Canned Pequi with capacity for 2.000 Kg per day
Project Slaughterhouse for Bovines and Swines and Cold Meat Processing (salsage, hams, Cold Meat and cured food) and Charque Processing - 100 animals/day - area of 1300 m² (1.554,8 sq.yd).
Project Public Medical Clinic with an area of 700 m2.
FeasibilityFactory to Produce Frozen Pre-Fried Potato with capacity for 20.000 Kg per day.
Business plant Factory to Produce Garlic Paste, Ready Seasoning, in natura Garlic and Garlic Dehydrated with capacity for 5.000 Kg per day.
Project Factory to Produce Meat Spread (Pâté) with capacity for 10.000 Kg/day.
How to start Factory to Produce Disposable Syringe with capacity for 20.000 Syringes per day.

Project - how to start Factory Milk Powder Packing with capacity for 13.000 Kg/day.