Ready project Factory Milk Powder Packing with capacity for 15.000 Kg/day.

CODE - LTC-094-F

Ready project Factory Milk Powder Packing with capacity for 15.000 Kg/day.

CODE - LTC-094-F


Project ready with:


Industry with the following sections:

Reception Platform of Milk Powder
Physical and Chemical Laboratory
Microbiological Laboratory
Production Room
Packing Room
Cold Chamber
Expedition
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory Milk Powder Packing

How to start Factory Milk Powder Packing with capacity for 15.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory Milk Powder Packing

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

| Vinegar Production Layout | Free-Range Chicken Raising Flowchart | How to Open a Cosmetics Manufacturing Business | Motorcycle Shop Facade Template | Oil Change Business Plans | Earnings from Selling Roasted Chicken | What Should I Do to Open a Fish Shop? | How to Set Up an Air Conditioning Company | Project Administration Women's Clothing Enterprise | Documents Required to Sell Water for Tanker Trucks | How to Open a Senior Living Center | Ppra Models for Cattle Cold Storage | Ready Shredded Chicken | Kanikama Production | Central Sterilization Material Plant | How to Create a Family Health Strategy | Setting Up A Business With Ambulance | How to Set Up a Gym Pool | Credit to Set Up a Guest House | School Kitchen | Bar Nightclub Enterprise | Greek Barbecue Restaurant Consultancy | Physical and Financial Schedule Models for a Residential Project | Setting Up a Concrete Lab | Ready-made Business Plan for Selling Paints | How to Organize a Lingerie Manufacturing Production | Fabric Factory In Peca | Bottle Production Plan | Making Eps Blocks | I Wanted to Set Up a Squeegee Factory | Phosphorus Manufacturing Process | Mortar and Grout Factory Projects | Bingo Card Manufacturer | I want a list of materials for a locksmith | How to Start a Business in the Machining Area | Asphalt Laboratory Project | Condensed Milk Factory In Brazil | Good Practices for the Distribution of Cleaning Materials | How to Set Up a Tire Shop | Quail Egg Industry | Standard Operating Procedure in Healthcare | LPG Gas Cylinder Factory | Barber Shop Project | What You Need to Open a Representation Office | Accounting Office Facade Model | Powder Fire Extinguisher Layout | Road Transport Organization Chart | Model of a shed for a farm | Wholesale Pizza Dough | Garlic Bread Making Machine | Rice Industry Construction Project | Wheat Mill Under Construction | Sugar Flowchart.dwg | Dog Hotel Construction Project |

 

Other projects ready:

How to start Improvement Unit of Seeds used to Feed Livestock with capacity for 10.000 Kg/day.
Project Factory to Produce Fodder from Sisal Fibers with capacity for 1.000 Kg/day.
PDF Fishing Vessels to Produce and Process Shrimps with capacity for 5.000 Kg/day.
Plant and layout Slaughterhouse for bovines slaughter and Charque - 50 animals/day - area of 700 m² (837,2 sq.yd).
Project Factory to Produce Leather Scrap Bones (for Dogs) with capacity for 1.000 Kg/day.
Project Factory to Produce Soymilk Yogurt with capacity for 3.000 liters per day.
FeasibilityPoultry House with capacity for 300 Broiler Breeders and Built area of 88 m².
Business plant Factory to Produce Chicken and Meat Stock Tablet with capacity for 3.000 Kg/day.
Project Clothing Industry to Produce Caps with capacity for 500 garments/day.
How to start Party Room for Decoration and Liveliness of Children's Party with an area of 1.000 m2.

Project - how to start Factory Milk Powder Packing with capacity for 15.000 Kg/day.