Ready project Factory Milk Powder Packing with capacity for 5.000 Kg/day.

CODE - LTC-094-C

Ready project Factory Milk Powder Packing with capacity for 5.000 Kg/day.

CODE - LTC-094-C


Project ready with:


Industry with the following sections:

Reception Platform of Milk Powder
Physical and Chemical Laboratory
Microbiological Laboratory
Production Room
Packing Room
Cold Chamber
Expedition
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory Milk Powder Packing

How to start Factory Milk Powder Packing with capacity for 5.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory Milk Powder Packing

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Milk Powder Factory Layout | I Want A Ready Project For Creating A Company | Flowchart of Medicinal Herb Production | Goat Milking Parlor | Bookstore Flowchart | Opening a Medical Equipment Store | How to Set Up a Dairy Store | Ice Cream Shop Project | Glassworks Budget Template | How to Set Up a Shoe Store Course | Distributor Financial Model | Provision of meals for companies | Machines for Driving School | How to Set Up a Mini Cold Storage Slaughterhouse | Pig Conveyor Belt | Gymnasium Floor Plan Design | Bndes Medical Clinic Financing Line | UBS Facade | Purchase Material to Assemble Uti | How to Set Up a Cyber Café | A Small Restaurant Serves Meals Daily | Collective Meal Business Plan | I would like to set up a nightclub | Business Plan for a Lavajato | Buffet Business Plan | Serpentarium Plant | Tent Making Project | Description for Making Suits | Sewing Industry Project | Business Plan for Manufacturing Tubes | Sofa Flowchart | MDF New Project Factory | Shipping of Gondola Materials | Concrete Post Formwork Industry | How to Set Up a Manufacturing Plant | Aluminum Frame Company Business Plan | Pallet Door Business Plan | Average Cost to Set Up a Dental Prosthesis Laboratory Cost | Where to Buy Ice Cream in Bags | How to Set Up a Mineral Water Industry and Enter the Market | Examples of Parking Projects | Pop Model | Pop Restaurante - Cointrole De Materias Primas | Financing to Set Up a Beauty Salon | Funeral Financing | What Documentation Would Be Required to Open a Van Rental Company in Minas Gerais | Office Work Plan | Vehicle Washing Flowchart Model | Recording Studio Floor Plans | Cost of Setting Up a Pig Farm | How to Set Up a Pasta Business Homemade Pasta | Equipment for Making Acaraje | Mayonnaise Industry Project | What Equipment Do You Need to Open an Acai Shop? | Tomato Pulp Machinery | How to Organize a Pet Shop Layout |

 

Other projects ready:

How to start Industry to Produce Bleach with capacity for 1.000 liters/day.
Project Factory to Produce Physiologic Serum with capacity for 20.000 liters/day.
PDF Factory to Produce Corn Flour, Canjica (corn grits), Corn Flakes with capacity for 10.000 Kg per day
Plant and layout Factory to Produce Capsaicin with capacity for 3.000 Kg/day.
Project Factory to Produce Cotton Yarn Bandage (not Sterilized) with capacity for 50.000 bandages per day.
Project Day Care with capacity for 20 children
FeasibilitySlaughterhouse Ovines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 5 animals/day.
Business plant Farm Breeding and Slaughter of Quails with: Farm to Produce Quail Eggs, Farm for Broiler Quail Breeding, Slaughterhouse for Quails, Factory of Canned Quail Eggs, Egg Incubator and Nursery for Quails, with capacity for 500 Eggs and Birds per day.
Project Cachaça (Liquor) Factory, with capacity for 1.000 liters/day. (To be built in a different level land).
How to start Slaughterhouse Alligator with capacity for 50 animals per day.

Project - how to start Factory Milk Powder Packing with capacity for 5.000 Kg/day.