Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Factory Milk Powder Reconstitution with capacity for 5.000 liters/day.
CODE - LTC-096-D
Ready project Factory Milk Powder Reconstitution with capacity for 5.000 liters/day.
CODE - LTC-096-D
Project ready with:
Industry with the following sections:
Reception Platform of Milk Powder
Physical and Chemical Laboratory
Microbiological Laboratory
Production Room
Packing Room
Cold Chamber
Expedition
Office
Bathrooms
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory Milk Powder Reconstitution
OPTIONAL SERVICES:
Financial Feasibility Study of Factory Milk Powder Reconstitution with capacity for 5.000 liters/day.
Business plan for Factory Milk Powder Reconstitution with capacity for 5.000 liters/day.
3D project of Factory Milk Powder Reconstitution with capacity for 5.000 liters/day.
Projects with other capacities
Factory Milk Powder Reconstitution
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Powdered Milk How to Reconstitute
|
Milk Reconstitution
|
How to Reconstitute Powdered Milk
|
Milk Reconstitution Flowchart
|
Reconstitution of Powdered Milk
|
How to Reconstitute Powdered Milk
|
Cosmetics Store Company Project
|
What It Takes to Set Up a Car Battery Store
|
Project to set up a stationery store
|
How Much Does It Cost to Open a Supplement Store
|
Project for an electronics store
|
Floor Plan of a Clothing Store
|
Melzinho - Dulce de Leche
|
Floor Plan Layout
|
Paper Recyclability
|
How to Set Up a Tutoring Class
|
Municipal Slaughterhouse Projects
|
Project to Open an Acarajé Business
|
Football Society Project and Budget
|
150 M2 Floor Plan
|
Technical Plan - Sketch - Physiotherapy Office
|
Event Center Ebook
|
Hostel Project
|
Non-Central Hotel
|
Layout for Pizzeria
|
Pasta House Model
|
Car Wash Design
|
Raw Material for School Chalk
|
Cigarette Production Flowchart
|
How to Open a Disposable Clothing Factory
|
Boot Factory Feasibility
|
Plant Capacity Inputs
|
How to Set Up a Plywood Factory
|
How Much Does It Cost to Set Up a Block Factory?
|
Setting Up Computer Factory
|
Diagram of How a Recycling Plant Works
|
Set up a lunchbox factory
|
Utensils for a Dietetic Technique Laboratory
|
Floor Plan of a Small Dairy
|
How to Write a Body Shop Manager Resume
|
How to Set Up a Church
|
Hospital Pharmacy Pop Template
|
Pop Ice Cream Industry
|
Equipment for Goldsmiths
|
How Much Does It Cost to Set Up a Modeling Agency
|
How to Set Up a Construction Company
|
How to Set Up a Silk Workshop
|
Lipa Fossa Project
|
Budget for Mineral Salt Industry
|
Floor Plan Drawing Of An Ice Cream Factory
|
Industrial French Bread Machine
|
Soy Milk Industries
|
Set up a Spice Industry
|
Pamonharia Project With Delivery
|
Plant Sprout Drawing
|
Budget for a Beauty Clinic Project
|
Other projects ready:
How to start Factory to Produce Condensed Soy Milk with capacity for 5.000 liters/day.
Project Factory to Produce Shiitake Dehydrated with capacity for 100 Kg/day.
PDF Clothing Industry to Produce Women's Clothing (Party Clothes) with capacity for 500 garments/day.
Plant and layout Factory to Produce Soymilk Yogurt with capacity for 10.000 liters per day.
Project Clothing Industry to Produce Lingerie with capacity for 300 garments/day.
Project Factory to Produce Cachaça (Liquor), Rapadura and Açúcar Mascavo (Brown Sugar) with capacity for 300 liters of Cachaça per day and 300 Kg of Açúcar Mascavo (Brown Sugar) per day.
FeasibilityFactory to Produce Organic Cachaça (Liquor) with capacity for 100 liters/day.
Business plant Factory to Produce Coconut Water with Ultraviolet Sterilization with capacity for 100 liters/day.
Project Factory to Produce Lipstick with capacity for 500 kg/day.
How to start Factory for Manioc Flour with capacity of 1000 kg/day and 225 m² (269,1 sq.yd.) area.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US