Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Factory to Produce Aerosol with capacity for 3.000 bottles per day.
CODE - CM-130
Ready project Factory to Produce Aerosol with capacity for 3.000 bottles per day.
CODE - CM-130
Project ready with:
Industry with the following sections:
Reception of Raw Material
Storage for Raw Material
Storage for Packages
Aerosol Production
Storage for Finished Products
Storage for Products in Observation
Offices
Canteens
Dressing Room
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Aerosol
OPTIONAL SERVICES:
Financial Feasibility Study of Factory to Produce Aerosol with capacity for 3.000 bottles per day.
Business plan for Factory to Produce Aerosol with capacity for 3.000 bottles per day.
3D project of Factory to Produce Aerosol with capacity for 3.000 bottles per day.
Projects with other capacities
Factory to Produce Aerosol
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Aerosols
|
I need a name for a candy store
|
Sponge Production Equipment
|
Design of an Info Store
|
Exhaust Machines
|
Fuel Pump Plant
|
Juice Bar Business Plan
|
Planning a Disposable Products Company
|
How Much Can I Start a Haberdashery Store With?
|
Equipment for Industrial Production of Jams
|
How to Set Up a Beverage and Candy Store
|
Machines and Equipment for Recycling Rubble
|
Lesson Plans for Seniors Computer Science
|
Poultry Refrigeration Equipment Approved by Sif
|
Business Viability of a Soccer Field Society
|
How Much Does It Cost to Set Up a Dental Radiology Clinic?
|
Dental Plant Design
|
Restaurant Layout and Equipment List
|
Monta Cinemas Company
|
Urban Spa2c Projects
|
Facades of Gas Stations
|
Physical Plan of Elderly Home
|
Equipment for Opening a Massage Room
|
Pharmaceutical Laboratory That Manufactures Parenteral Solutions
|
How to Set Up a Granite Industry
|
Ready-made Business Plan for a Printing Company
|
.curtains
|
Raw material Insoles
|
Cost of Setting Up a Sign Business
|
Project With A Barbecue Stick
|
Shopping Mall Flowchart Template
|
How Much Does It Cost to Set Up a Concrete Block Factory
|
Pharmacy Cad Block
|
What is the investment to set up a brick factory?
|
Manufacturing of Aluminum Parts
|
Clinical Analysis Laboratory Project
|
Yogurt Factory
|
How to Mark Clothes in a Commercial Laundry
|
Motorcycle Workshop Templates
|
Wooden Skate Park Project
|
Pharmacy Standard Operating Procedure Drugstore Template
|
What Are the Hygiene Procedures for a Laboratory?
|
Fashion Atelier Business Plan Template
|
Trade Fair Project
|
Escort Budget Template
|
I Want to Open an Auto Conditioning Company
|
How Do I Set Up a Radio Taxi?
|
Fertilizer Making Machines
|
Milk Carton Tile Manufacturing Process
|
Ready-to-use Layout for Bakery
|
Orange Juice Industry Floor Plan Lay Out Production Area
|
Trade Shitake Mushrooms
|
How to Set Up a Cornmeal Factory
|
Injectable Production
|
Other projects ready:
How to start Industry to Produce Shampoo, Hair Conditioner, Hand and Body Creams, Suntan Lotion, Body Soap with capacity for 500 Kg/day.
Project Factory to Produce English Sauce and Shoyu Sauce with capacity for 500 liters per day.
PDF Factory to Produce Ceramics (French Tiles and Bricks) with capacity for 35.000 Kg/day.
Plant and layout Factory to Produce Broom Handle with capacity for 5.000 units per day.
Project Clothing Industry to Produce Jeans Pants with Laundry Sector (Stone Wash) with capacity for 100 garments/day.
Project Factory T-Shirt Screen Printing with capacity for 200 garments/day.
FeasibilityBonded Warehouse for Poultry Meat with capacity for 3.000 Kg/day.
Business plant Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Packed Milk types B and C, Cheese with Blue Mould (Roquefort, Gorgonzola), Cheese with White Mould (Camembert, Brie), with capacity of 2000 liters/day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Whey Cheese, with capacity of 6000 liters/day.
How to start Cachaça (Liquor) Factory, with capacity for 20.000 liters/day. (To be built in a flat land).
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US