Ready project Factory to Produce Alcohol Gel with capacity for 5.000 liters/day.

CODE - IND-074

Ready project Factory to Produce Alcohol Gel with capacity for 5.000 liters/day.

CODE - IND-074


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Milling
Fermentation
Distillation
Packages
Storage for Finished Products
Expedition
Office
Dressing Rooms
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Alcohol Gel

How to start Factory to Produce Alcohol Gel with capacity for 5.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Alcohol Gel

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Alcohol Gel Flowchart | Floor Plan of Alcohol Factory | Machines and Equipment Used in the Manufacture of Alcohol Gel | Alcohol Gel Capacity | Legislation Production of Alcohol Gel | Cosmetics Factory Organization Chart | Goat Breeding Sheds | Images of 3rd Floor Plans of a Pharmaceutical Industry | Sports Wheel Shops To Assemble | Rotisseries Projects | How to Open a Plastering Services Company | Tennis Sale Store | Sip Meat Distributor Floor Plan | How to Regularize a Basic Food Basket Company | Model Driving School Track | Refrigerator Floor Plans | Fish Company Layout | Dwg Sport Project | Medical Clinic Budget | Psf Plant | Emergency Room Plant | Example of a Party Room Layout for 400 People | Inn Floor Plan Dwg | Flowchart of an Industrial Kitchen | How to Set Up a Nightclub Area | Layout of a Car Wash Company | Planning to Set Up Children's Buffet | Paw Packaging Factory | Mattress Factory I Want to Know What the Manufacturing Process Is Like | Business Uniform Layout | Nonwoven Bag Factory | Bnds Financing For Eps Manufacturing Company | School Desk Production Machines | Machines for manufacturing wooden frames | Sale of Concrete Posts in Poços De Caldas | Kite Productions Development | Set up an office for an aluminum metalwork shop | What You Need to Open a Zinc Plating Shop | Setting Up a Dental Prosthesis Laboratory | Yogurt Ice Cream Factory | Good Pest Control Practices Manual | How Do I Set Up an Armoring Company? | Standard Operating Procedures for Dairy | Restaurant Design Template | Physical Arrangement of a Beauty Salon Inside a Hospital | Equipment for the Elderly Dwg | Van Factory | Representation Company Floor Plan Templates | How to Set Up a Cleaning Service | Pig Farm Model | How Much Does It Take to Set Up a Bakery? | Cream Cracker Biscuit Making Equipment | How to Start a Eucalyptus Treatment Company | Acerola Pulp Flowchart In Industry | Hot Sauce Industry | Produce Pet Shop At Home |

 

Other projects ready:

How to start Projeto de Frigorífico para Abate de Bovinos (Abate pelo Método Kosher) with capacity for 500 animais por day.
Project Farm to Produce and Slaughter Country Chicken (Frango Caipira) with: Farm and Slaughterhouse, and capacity for 3.000 Chickens per day.
PDF Factory to Produce Mate Tea and other Teas, Bottled in Plastic Bottles PET and Plastic Cups with capacity for 5000 liters per day.
Plant and layout Factory to Produce Perfume with capacity for 500 liters/day.
Project Marble and Granite Factories to Produce Cutted and Polished Stones and Marble and Granite Pieces (Sink, Counter and by Placing an Order) with capacity for 10 Blocks per Week.
Project Factory to Produce Wax with capacity for 5.000 Kg/day.
FeasibilityFactory to Produce Corn Flour, Corn Flakes and Corn for Canjica with capacity for 8.000 Kg per day.
Business plant Factory to Produce Açúcar Mascavo (Brown Sugar), Rapadura and Melado, with capacity for 2.000 kg/day.
Project Smoker with capacity to produce 50 Kg/day.
How to start Shed to Cut Glass with capacity to Produce 500 m2/day.

Project - how to start Factory to Produce Alcohol Gel with capacity for 5.000 liters/day.