Ready project Factory to Produce Caipirinha Drink with capacity for 1.000 liters/day.

CODE - AGR-011

Ready project Factory to Produce Caipirinha Drink with capacity for 1.000 liters/day.

CODE - AGR-011


Project ready with:

Industry with the following sections:

Reception
Cold Chamber for Fruits
Mixture Sector
Storage of Ingredient
Storage of Packing
Bottling
Storage
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Caipirinha Drink

How to start Factory to Produce Caipirinha Drink with capacity for 1.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Caipirinha Drink

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Set Up a Caipirinha Production Company | Business Plan for Setting Up a Liquor Factory | Hair Removal Wax Manufacturer | List of Products for Setting Up a Hardware Store | Perfumery Facade | Gas Station Layout With Two Pumps | Food Supplement Store Is A Good Business | Craftsman Floor Plan | Open Surf Wear | Cocada Legislation | Pharmacy Basic Plan | Tire Recycling Assembly | How to Set Up a Gastronomy School | Standard Plant for Goat and Sheep Slaughterhouse | Setting up a Society Football Field | How to Set Up a Radiology Clinic | Bndes Medical Clinic Support | Floor Plan of an Industrial Factory | Lottery House Plans | How to Build or Set Up a Palase Hotel | Organizational Chart of a Pizzeria | Ready-made projects for houses measuring 200 meters | Budget for Setting Up an Equine Therapy Center | Phytotherapy Plant | Opening a Marble Company | How many kg of fiber does a coconut give? | Open Bikini Factory | Loyalty of a Footwear Company | Flowchart Balloons | Woodworking Projects | Block Factory Layout | With Making Caresses | Wooden Cage Factory | Anatomy Laboratory Floor Plan | Prato Cheese Production Flowchart | Budget to Start a Hospital Laundry | What It Takes to Set Up a Painting Shop | Bmx Track In Cad | Ready Pops Model | Standard Operating Hygiene Procedure | How to Set Up an Optical Laboratory | Inbound Business Plan | Equipment Needed to Set Up a Construction Company | Art Workshop Tips | Electrical Services Provision Project and Budget | How to Set Up a Feed Factory | Layout For Ceramic Tile | I Want to Set Up a Frozen French Bread Presso Bakery | Garlic Processing | Equipment for Production of Paste Seasonings with Price | 09veg-n-019 09 | How to Develop a Biscuit Factory Project |

 

Other projects ready:

How to start Industry Mineral Water Bottling with capacity for 5.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups.
Project Slaughterhouse Caprines with capacity to Slaughter 5 animals/day.
PDF Clothing Industry to Produce Dyeing Fabric (Hippie Clothes) with capacity for 200 garments/day.
Plant and layout Factory to Produce Raisins Cashew Nuts, Cashew Syrup, Crystallized Cashew, Cashew Jelly and Toasted Cashew Nut with capacity for 10.000 Kg per day.
Project Factory for Betterment and Drying of Rice with 1.000m² (1196 sq.yd.) area and capacity of 25.000 kg/day.
Project Clothing Industry to Produce Cloth Strainer with capacity for 200 units/day.
FeasibilityFactory to Produce Tomato Extract and Tomato Pulp with capacity for 40.000 Kg per day.
Business plant Factory to Produce Organic Cheese for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela) with an area of 122 m2 and capacity for 3.000 liters/day.
Project Factory to Produce Lipstick with capacity for 500 kg/day.
How to start Fruit Candy Factory with an area of 150 m² (179,4 sq.yd.) and capacity to produce other types of Candy.

Project - how to start Factory to Produce Caipirinha Drink with capacity for 1.000 liters/day.