Ready project Factory to Produce Caipirinha Drink with capacity for 1.000 liters/day.

CODE - AGR-011

Ready project Factory to Produce Caipirinha Drink with capacity for 1.000 liters/day.

CODE - AGR-011


Project ready with:

Industry with the following sections:

Reception
Cold Chamber for Fruits
Mixture Sector
Storage of Ingredient
Storage of Packing
Bottling
Storage
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Caipirinha Drink

How to start Factory to Produce Caipirinha Drink with capacity for 1.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Caipirinha Drink

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Business Plan for Setting Up a Liquor Factory | How to Set Up a Caipirinha Production Company | Hair Removal Wax Manufacturer | List of Products for Setting Up a Hardware Store | Perfumery Facade | Gas Station Layout With Two Pumps | Food Supplement Store Is A Good Business | Craftsman Floor Plan | Open Surf Wear | Cocada Legislation | Pharmacy Basic Plan | Tire Recycling Assembly | How to Set Up a Gastronomy School | Standard Plant for Goat and Sheep Slaughterhouse | Setting up a Society Football Field | How to Set Up a Radiology Clinic | Bndes Medical Clinic Support | Floor Plan of an Industrial Factory | Lottery House Plans | How to Build or Set Up a Palase Hotel | Organizational Chart of a Pizzeria | Ready-made projects for houses measuring 200 meters | Budget for Setting Up an Equine Therapy Center | Phytotherapy Plant | Opening a Marble Company | How many kg of fiber does a coconut give? | Open Bikini Factory | Loyalty of a Footwear Company | Flowchart Balloons | Woodworking Projects | Block Factory Layout | With Making Caresses | Wooden Cage Factory | Anatomy Laboratory Floor Plan | Prato Cheese Production Flowchart | Budget to Start a Hospital Laundry | What It Takes to Set Up a Painting Shop | Bmx Track In Cad | Ready Pops Model | Standard Operating Hygiene Procedure | How to Set Up an Optical Laboratory | Inbound Business Plan | Equipment Needed to Set Up a Construction Company | Art Workshop Tips | Electrical Services Provision Project and Budget | How to Set Up a Feed Factory | Layout For Ceramic Tile | I Want to Set Up a Frozen French Bread Presso Bakery | Garlic Processing | Equipment for Production of Paste Seasonings with Price | 09veg-n-019 09 | How to Develop a Biscuit Factory Project |

 

Other projects ready:

How to start Factory to Produce Fresh Dough for Pizza and setting up for Pizza (Filled and Frozen) with capacity for 20.000 Kg/day.
Project Factory to Produce Synthetic Marble with Plastic Resin with capacity for 300 pieces per day.
PDF Factory to Produce Fruit Juice, Frozen and Concentrated Fruit Pulp, Paste and Syrup Fruit Sweets, Fruit Jelly and Ice Ice Cream made from Fruit Pulp with capacity for 500 Kg/day.
Plant and layout Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Packed Milk types B and C, with capacity of 3000 liters/day.
Project Factory to Produce Crackling (Torresmo), Crisps Baked Pork Meat (Pururuca), Skin Ready to Fry and Pig Lard with capacity to produce 5.000 Kg/day.
Project Factory to Produce Sparkling Wine, with capacity for 50.000 liters/year.
FeasibilityFactory to Produce Vinegar made from Cane Bagasse with capacity for 1.000 liters/day.
Business plant Factory to Produce Acerola Pulp (Barbados cherry) with capacity for 1.000 Kg per day.
Project Factory to Produce Pupunha Palm with capacity for 20.000 Kg per day.
How to start Factory to Produce Alvejante with capacity for 10.000 liters/day.

Project - how to start Factory to Produce Caipirinha Drink with capacity for 1.000 liters/day.