Ready project Factory to Produce Caipirinha Drink with capacity for 10.000 liters/day.

CODE - AGR-014

Ready project Factory to Produce Caipirinha Drink with capacity for 10.000 liters/day.

CODE - AGR-014


Project ready with:

Industry with the following sections:

Reception
Cold Chamber for Fruits
Mixture Sector
Storage of Ingredient
Storage of Packing
Bottling
Storage
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Caipirinha Drink

How to start Factory to Produce Caipirinha Drink with capacity for 10.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Caipirinha Drink

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Production for Caipirinha | Caipirinha Flowchart | Flowchart for Making Caipirinha | Caipirinha Manufacturing Flowchart | How to Make a Caipirinha Flowchart | Flowchart How to Make Caipirinha | How to Make Honey Drops | Project for Semi-confinement Cattle Banks | Economic Viability of the Cosmetics Industry | Materials For Momtar Cell Phone Store | How to Open a Car Battery Store | Newspaper Stand .dwg | Flowchart of an Organic Products Company | How to Set Up a Party Store | Exterior Plan of a Women's Clothing Store | Candy Company Name Template | Drugstore Reception Floor Plan | What is a Waste Treatment Plant? | Floor Plan of Swine Cold Storage | Pie Factory Equipment | Quadra Society Business Plan | Video How to Set Up a Surgical Center | Holistic Therapy Clinic Design Template | Gym Room Model | Choperia Restaurant Model | Gym Flowchart Template | How to Set Up a Bowling Bar | Car Wash Ramps Project | I Want to Set Up a Water Analysis Laboratory | Sandpaper Making Machine | T-Shirt Production Factory Equipment | How to Set Up a Plastic Bag Manufacturing Plant | Bndes Clothing Factory Project Model | Autoclave Manufacturers For Wood | Layout of a concrete block | Example of Gates for Plants | How to Set Up a Paper Bag Factory | Trophy Factories | Milk Cooling Station | Motorhome Manufacturers Brazil | House Plan with 1 Bedroom and One with Suite | Pop-006 | Pest Control Model | Bus Budget Template | Restaurant Management Model | Assistance Plan Organizational Chart and Flowchart | Price List for Clothing Alteration | Provision of Residential Maintenance Services | Scratch Card Manufacturing | How to Make a Floor Plan for a Pasta Food Industry | Shrimp Farming Project In Excel | Cassava Production Flowchart | Corn Juice Manufacturer Sorocaba | How to Make Avocado Oil | Animal Crematorium Price |

 

Other projects ready:

How to start Factory to Produce Leather Scrap Bones (for Dogs) with capacity for 500 Kg/day.
Project Factory Extration and Drying of Brazil Nut (Castanha-do-Pará) with capacity to produce 500 Kg per day.
PDF Living Center for Elderlies with capacity for 100 beds.
Plant and layout Pathology and Cytopathology Laboratory.
Project Rendering with capacity for 300 tons/day.
Project Factory to Produce T-Shirts with capacity for 300 units por day.
FeasibilityIndustry to Produce Body Soap with an area of 350 m² and capacity for 5.000 kg/day.
Business plant Industry Mineral Water Bottling with capacity for 5.000 liters/hour, in flagons of 10 and 20 liters and plastic cups.
Project Maternity Hospital for 10 beds.
How to start Factory to Produce Crystallized Cashew with capacity for 1.000 Kg per day.

Project - how to start Factory to Produce Caipirinha Drink with capacity for 10.000 liters/day.