Ready project Factory to Produce Caipirinha Drink with capacity for 20.000 liters/day.
CODE - AGR-015
Ready project Factory to Produce Caipirinha Drink with capacity for 20.000 liters/day.
CODE - AGR-015Project ready with:
Industry with the following sections:Reception
Cold Chamber for Fruits
Mixture Sector
Storage of Ingredient
Storage of Packing
Bottling
Storage
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Caipirinha Drink
OPTIONAL SERVICES:
- Financial Feasibility Study of Factory to Produce Caipirinha Drink with capacity for 20.000 liters/day.
- Business plan for Factory to Produce Caipirinha Drink with capacity for 20.000 liters/day.
- 3D project of Factory to Produce Caipirinha Drink with capacity for 20.000 liters/day.
Projects with other capacities
Factory to Produce Caipirinha Drink
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Caipirinha Factory | Caipirinha Making Project | Decaipirinha Industry | Caipirinha Production | Farm Slaughtering Machines | Cosmetics Factory | Motorcycle Parts Store Layout Design | Motorcycle parts Bndes | Necessary To Sell Chicken | Fishmonger Projects5d | Selling Air Conditioning Companies | Organizational Chart of a Children's Clothing Store Ready | How to Set Up Basket Distribution | Senior Center Project Template | Flowchart of the cattle slaughterhouse | Ready-made savory filling | Frs001 Pigs | I want to assemble the CME for sanitation. What materials are needed? | PSF Equipment List | Project Template for Acquiring Financing | Gym Floor Plan Templates and Drawings | 10 Bedroom Inn Floor Plan | Nightclub House Organization Chart | View Cafeteria Floor Plans | Paper Buildings to Assemble | Pill Factory | Retreading Project | Set up Langeri Factory | String Production | Open a Mini Bag Factory | Where to Buy Styrofoam Blocks in SC | Broom and Squeegee | How to Set Up a Phosphorus Factory | Mortar Industry How to Assemble | How to Assemble Bingo Cards | Anodizing Equipment | Ready Project About Employees | Form for Prosthetics Laboratory | How to Produce Powdered Milk | HR Company Good Practices Manual Template | Tools Needed to Set Up a Tire Shop | Quail Egg Production | Pop Standard Operating Procedures for Hospitals | I want to set up a gas and mineral water distributor. What do I need? | How a Manicure Can Open a Business | Open Vehicle Agency | Accounting Office Flowchart Template | Set up Fire Extinguisher Refilling Factory | Hot Dog Stand Name Guide | Pig Farming Model Floor Plan | Cereal Bar Production Capacity Per Day | What Machines Do I Need to Set Up a Garlic Bread Factory? | Homemade Pepper Factory | Metal Silos Storage | Dog Bone Factory |
Other projects ready:
How to start Factory to Produce Bala de Coco (Coconut Candy) with capacity for 5.000 Kg/day.
Project Factory to Produce Concrete Lamppost with capacity for 300 units/day.
PDF Industry to Produce Hydrated Alcohol to be used in Hospitals with capacity for 3.000 liters/day.
Plant and layout Factory to Produce Soap Powder with capacity for 3.000 Kg/day.
Project Factory to Produce Banana Purée with capacity for 5.000 Kg per day.
Project Shed to Cut Glass with capacity to Produce 100 m2/day.
FeasibilityTanning Ovine Skin with capacity to Produce 100 skins per day.
Business plant Comercial Laundry with capacity for 50 kg of Clothes per day.
Project Factory to Produce Premolded Rock Soil with capacity for 300 m2/day.
How to start Slaughterhouse Swines with capacity for 400 animals/day.



