Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Factory to Produce Caipirinha Drink with capacity for 3.000 liters/day.
CODE - AGR-012
Ready project Factory to Produce Caipirinha Drink with capacity for 3.000 liters/day.
CODE - AGR-012
Project ready with:
Industry with the following sections:
Reception
Cold Chamber for Fruits
Mixture Sector
Storage of Ingredient
Storage of Packing
Bottling
Storage
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Caipirinha Drink
OPTIONAL SERVICES:
Financial Feasibility Study of Factory to Produce Caipirinha Drink with capacity for 3.000 liters/day.
Business plan for Factory to Produce Caipirinha Drink with capacity for 3.000 liters/day.
3D project of Factory to Produce Caipirinha Drink with capacity for 3.000 liters/day.
Projects with other capacities
Factory to Produce Caipirinha Drink
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Caipirinha Process Flowchart
|
Caipirinha Assembly Flowchart
|
What Do I Need to Set Up a Mini Market?
|
Set up a concrete mixer rental company.
|
Legislation for Dental Product Stores
|
Viability of a Cold Store
|
Baby Shop Business Plan Template
|
Set Up Shop Rental Costume
|
Equipment for setting up a pharmacy
|
Assemble Food Packaging
|
How to Open a Culinary School
|
How to Set Up a Refrigerator Layout
|
Crematory Investment
|
Cad Quadra Project
|
Medical Clinics Plate
|
Basic Health Unit DWG Plans
|
Medical Prescription Template for UTI
|
Coffee Shop Template
|
P Supermarket Facades
|
Personal Trainer Plan Example
|
Floor Plan Of A Nightclub Project
|
Car Wash Effluent Project
|
Organizational Chart of Entertainment Venue
|
Polyelectrolytic Cleaning Products
|
Mattress Factory Business Plan
|
Faction Work Plan
|
Materials for Assembling Brooms
|
Building a Cement Cattle Drinker
|
Documents for Coal Factory
|
Wood Treatment Consulting
|
Where to Do Asphalt Projects
|
Paper Tube Factory Layout
|
Aluminum Cookware Machine
|
Exhaust Machine
|
Example of a Clinical Analysis Laboratory Floor Plan
|
Organic Milk Business Plan Template
|
How to Open a Water and Gas Company
|
Documents Required to Set Up a Parking Lot
|
Pop 28Standard Operating Procedure29Food
|
How to Assemble the Transport Pop
|
Organizational Chart of a Hair Salon
|
Greenhouse and Garden Costs
|
How to Set Up a Motorcycle Tracking Company
|
How to Start a Surveying Company
|
How to Set Up a Studio for Filming
|
What ingredient to make popsicles?
|
Set Up Small Pasta Factory
|
How to Design a Cookie Factory
|
Tapioca starch reception platform
|
Pop Model At The Fruit Pulp Factory25c325a725c325a3o
|
Machines for dried tomatoes
|
Cosmetics Industry Flowchart Template
|
Other projects ready:
How to start Factory to Produce Sour Starch (produced with Manioc Starch) with capacity for 500 Kg per day.
Project Factory to Produce Pasteurized Orange Juice with capacity for 5.000 liters per day.
PDF Cold Meat Production and Meat Deliverer with capacity for 3.000 Kg/day.
Plant and layout Industry to Produce Creams, Hair Conditioner, Hand and Body Cream, Suntan Lotion with capacity for 20.000 Kg/day.
Project Comercial Laundry with capacity for 1.000 kg of Clothes per day.
Project Marble and Granite Factories to Produce Cutted Stones with capacity for 3 Blocks per Week.
FeasibilitySlaughterhouse Swines, Caprines, Ovines with capacity for 700 animals per day.
Business plant Clothing Industry to Produce Knitwear with Dyeing Sector with capacity for 100 garments/day.
Project Factory to Produce Organic Cachaça (Liquor) with capacity for 3.000 liters/day.
How to start Factory to Produce Banana Sweet with capacity for 50.000 Kg/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US