Ready project Factory to Produce Caipirinha Drink with capacity for 3.000 liters/day.
CODE - AGR-012
Ready project Factory to Produce Caipirinha Drink with capacity for 3.000 liters/day.
CODE - AGR-012Project ready with:
Industry with the following sections:Reception
Cold Chamber for Fruits
Mixture Sector
Storage of Ingredient
Storage of Packing
Bottling
Storage
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Caipirinha Drink
OPTIONAL SERVICES:
- Financial Feasibility Study of Factory to Produce Caipirinha Drink with capacity for 3.000 liters/day.
- Business plan for Factory to Produce Caipirinha Drink with capacity for 3.000 liters/day.
- 3D project of Factory to Produce Caipirinha Drink with capacity for 3.000 liters/day.
Projects with other capacities
Factory to Produce Caipirinha Drink
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Caipirinha Process Flowchart | Caipirinha Assembly Flowchart | What Do I Need to Set Up a Mini Market? | Set up a concrete mixer rental company. | Legislation for Dental Product Stores | Viability of a Cold Store | Baby Shop Business Plan Template | Set Up Shop Rental Costume | Equipment for setting up a pharmacy | Assemble Food Packaging | How to Open a Culinary School | How to Set Up a Refrigerator Layout | Crematory Investment | Cad Quadra Project | Medical Clinics Plate | Basic Health Unit DWG Plans | Medical Prescription Template for UTI | Coffee Shop Template | P Supermarket Facades | Personal Trainer Plan Example | Floor Plan Of A Nightclub Project | Car Wash Effluent Project | Organizational Chart of Entertainment Venue | Polyelectrolytic Cleaning Products | Mattress Factory Business Plan | Faction Work Plan | Materials for Assembling Brooms | Building a Cement Cattle Drinker | Documents for Coal Factory | Wood Treatment Consulting | Where to Do Asphalt Projects | Paper Tube Factory Layout | Aluminum Cookware Machine | Exhaust Machine | Example of a Clinical Analysis Laboratory Floor Plan | Organic Milk Business Plan Template | How to Open a Water and Gas Company | Documents Required to Set Up a Parking Lot | Pop 28Standard Operating Procedure29Food | How to Assemble the Transport Pop | Organizational Chart of a Hair Salon | Greenhouse and Garden Costs | How to Set Up a Motorcycle Tracking Company | How to Start a Surveying Company | How to Set Up a Studio for Filming | What ingredient to make popsicles? | Set Up Small Pasta Factory | How to Design a Cookie Factory | Tapioca starch reception platform | Pop Model At The Fruit Pulp Factory25c325a725c325a3o | Machines for dried tomatoes | Cosmetics Industry Flowchart Template |
Other projects ready:
How to start Pharmaceutical Industry with an area of 1.600 m².
Project Cachaça (Liquor) and Brandy Bi-Distillary, with capacity of production for 1.000 liters/day.
PDF Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Butter, with capacity for 1000 liters/day.
Plant and layout Milk and Dairy Industry to Produce Organic Cheese and Goat Milk Cheese with an area of 130 m2 and capacity for 1.500 liters/day.
Project Factory to Produce Cachaça (Liquor) made from Manioc with capacity for 500 liters/day.
Project Factory to Produce Fruit Juice, Frozen and Concentrated Fruit Pulp, Paste and Syrup Fruit Sweets, Fruit Jelly and Ice Ice Cream made from Fruit Pulp with capacity for 1.000 Kg/day.
FeasibilityDay Care with capacity for 20 children
Business plant Industry to Produce Shampoo, Hair Conditioner, Hand and Body Creams, Suntan Lotion with capacity for 20.000 Kg/day.
Project Factory Aluminum Casting with capacity for 3.000 Kg/day.
How to start Factory to Produce Dragee and Pão of Honey (Honey Bread) with capacity for 3.000 Kg/day.



