Ready project Factory to Produce Chocolate Powder with capacity for 3.000 Kg/day.

CODE - LTC-067

Ready project Factory to Produce Chocolate Powder with capacity for 3.000 Kg/day.

CODE - LTC-067


Project ready with:


Industry with the following sections:

Reception Platform of Milk Powder
Physical and Chemical Laboratory
Production and Packing Section
Chamber for Packed Products
Packing
Expedition
Storage for Packages
Storage for Ingredients
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Chocolate Powder

How to start Factory to Produce Chocolate Powder with capacity for 3.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Chocolate Powder

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Set Up a Chocolate Powder Factory | Chocolate Powder for Industry | Production of Chocolate Powder | Quality in the Production of a Chocolate Factory | Chocolate Powder Factories | Start a Chocolate Milk Company | How to Make Chocolate Powder | Chocolate Quality Control | Chocolate Powder Manufacturer | How to Make Chocolate Powder | Production of Chocolate Powder in Brazil | Chocolate Powder | How to Set Up a Chocolate Powder Business | Auto Parts Store Plant | Fighting Product Sales Stores | How to Set Up a Bank Branch | Ready-Made Business Plan for Candy Store | Bnde Financing Scrap Metal Company | Orthopedic Products Business Plan | Crispy Sweets Factory | Plant Project 150mc2b2 | Opening a Music School | Breaded Food Flowchart | Equipment Budgets for a Meat Boutique | Construction Dressing Room Dwg | Standard Operating Procedure Purge Room | Physiotherapy Clinic Floor Plan | Step by Step How to Assemble Children's Party Decorations | Bra Beer Factory | How to Set Up a Dance Academy Business | Build Bowling | Dyke Models for Lavajato | Elderly Project Model | Setting Up a Water Analysis Laboratory | How to Set Up a Fireworks Factory | How to Set Up a Knitwear Company | Disposable Clothing Service To Do At Home | Set Up Disposable Cup Factory | Physical Financial Schedule Template for PET Bottle Recycling | Wood Treatment Autoclave How Much Does It Cost? | How to Open a Precast Company | Industrial Gas Heater | Candy Mold Machine Factory | Iron Warehouse How to Assemble | Industrialized Dairy as an Enterprise | Automotive Service Flowchart | Operating Procedure for Supplier Qualification | Clinical Laboratory Ready Pops | How to Set Up a Call Center | Set up a Neighborhood Newspaper Graphics | How to Run a School Driving Company | Fac2b4brica Popsicles Installations Project | Pastry Dough Manufacturing | How to Register Sand Mining | Makete-French Fries | How to Buy Guarana Sticks | Which Factory Produces Soy Condensed Milk | What Documentation Is Required to Open a Cemetery? |

 

Other projects ready:

How to start Factory to Produce Cashew Jelly with capacity for 3.000 Kg per day.
Project Factory to Produce Fodder for Birds with an area of 133 m² and capacity for 5.000 kg/day.
PDF Acupuncture Clinic with capacity for 30 Patients.
Plant and layout Factory for Matutinal Cereal production with 250m² (299 sq.yd.) area and capacity of 1.500 kg/day.
Project Slaughterhouse Ovines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 700 animals/day.
Project Factory to Produce Charque Dried Salted Meat (with Deboned Meat Reception) with capacity for 3.000 Kg/day.
FeasibilityFactory to Produce Soymilk Yogurt with capacity for 10.000 liters per day.
Business plant Factory to Produce Dry Coconut Grated with capacity for 5.000 Kg per day.
Project Industry to Produce Shampoo, Hair Conditioner, Hand and Body Creams, Suntan Lotion, Body Soap with capacity for 5.000 Kg/day.
How to start Factory to Produce Pepper Powder Packed in Capsules with capacity for 150 Kg/day.

Project - how to start Factory to Produce Chocolate Powder with capacity for 3.000 Kg/day.