Ready project Factory to Produce Chocolate Powder with capacity for 3.000 Kg/day.

CODE - LTC-067

Ready project Factory to Produce Chocolate Powder with capacity for 3.000 Kg/day.

CODE - LTC-067


Project ready with:


Industry with the following sections:

Reception Platform of Milk Powder
Physical and Chemical Laboratory
Production and Packing Section
Chamber for Packed Products
Packing
Expedition
Storage for Packages
Storage for Ingredients
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Chocolate Powder

How to start Factory to Produce Chocolate Powder with capacity for 3.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Chocolate Powder

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Production of Chocolate Powder | How to Set Up a Chocolate Powder Factory | Chocolate Powder for Industry | How to Set Up a Chocolate Powder Business | Chocolate Powder Manufacturer | Chocolate Powder Factories | Quality in the Production of a Chocolate Factory | How to Make Chocolate Powder | Chocolate Quality Control | Production of Chocolate Powder in Brazil | Chocolate Powder | How to Make Chocolate Powder | Start a Chocolate Milk Company | Auto Parts Store Plant | Fighting Product Sales Stores | How to Set Up a Bank Branch | Ready-Made Business Plan for Candy Store | Bnde Financing Scrap Metal Company | Orthopedic Products Business Plan | Crispy Sweets Factory | Plant Project 150mc2b2 | Opening a Music School | Breaded Food Flowchart | Equipment Budgets for a Meat Boutique | Construction Dressing Room Dwg | Standard Operating Procedure Purge Room | Physiotherapy Clinic Floor Plan | Step by Step How to Assemble Children's Party Decorations | Bra Beer Factory | How to Set Up a Dance Academy Business | Build Bowling | Dyke Models for Lavajato | Elderly Project Model | Setting Up a Water Analysis Laboratory | How to Set Up a Fireworks Factory | How to Set Up a Knitwear Company | Disposable Clothing Service To Do At Home | Set Up Disposable Cup Factory | Physical Financial Schedule Template for PET Bottle Recycling | Wood Treatment Autoclave How Much Does It Cost? | How to Open a Precast Company | Industrial Gas Heater | Candy Mold Machine Factory | Iron Warehouse How to Assemble | Industrialized Dairy as an Enterprise | Automotive Service Flowchart | Operating Procedure for Supplier Qualification | Clinical Laboratory Ready Pops | How to Set Up a Call Center | Set up a Neighborhood Newspaper Graphics | How to Run a School Driving Company | Fac2b4brica Popsicles Installations Project | Pastry Dough Manufacturing | How to Register Sand Mining | Makete-French Fries | How to Buy Guarana Sticks | Which Factory Produces Soy Condensed Milk | What Documentation Is Required to Open a Cemetery? |

 

Other projects ready:

How to start Salon for Feet Treatment with capacity for 10 people.
Project Factory T-Shirt Screen Printing with capacity for 100 garments/day.
PDF Honey Warehouse with Reception of Honey in Plastic Tanks with capacity to Produce 300 liters/day.
Plant and layout Slaughterhouse Alligator with capacity for 100 animals per day.
Project Slaughterhouse Horses with capacity for 5 animals per day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Sweet Milk, with capacity of 1000 liters/day.
FeasibilitySlaughterhouse Industrialization and Slaughtering of Swines with capacity for 30 animals/day and Cold Meat industrialization (Hams, Sausages, Salami, Meat, Cured-Food, etc) with 520 m² (621 sq.yd) of constructed area.
Business plant Factory to Produce Cotton Yarn Bandage (not Sterilized) with capacity for 100.000 bandages per day.
Project Sterilization Unit (by Ethylene Oxide) with capacity for 15.000 Units per day.
How to start Clothing Industry to Produce Shorts with Laundry Sector (Stone Wash) with capacity for 1.000 garments/day.

Project - how to start Factory to Produce Chocolate Powder with capacity for 3.000 Kg/day.