Ready project Factory to Produce Chocolate with capacity for 1.000 Kg/day.

CODE - CHC-004

Ready project Factory to Produce Chocolate with capacity for 1.000 Kg/day.

CODE - CHC-004


Project ready with:

Industry with the following sections:
Reception Platform for Raw Material
Storage for Raw Material
Manufacture Room I
Manufacture Room II
Packaging
Expedition
Storage for Finished Products
Packaging Storage
Office
Room for the Inspector
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Chocolate

How to start Factory to Produce Chocolate with capacity for 1.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Chocolate

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Chocolate How to Make Factory | What is the profitability of a chocolate industry? | Cupuaçu Price List Schedule | Cotton Swab Machine Industry In Italy | Electrical Store Assemble | What You Need to Open an Antenna Store | Construction Plans for Snack Bars | Ready-made Business Plan Template for a Dishwasher Rental Company | Set up a bed, table and bath store | Wholesale Paçoca | Beverage Distributor Business | Ecological Asphalt Plant | How to Set Up a School Layout | Cold Room Plant | Sheep Farming Project for Financing | I want to set up an outpatient clinic. What documents do I need? | Radiology Example Plant | How to Make a Hospital Model | Montar Motel | Business Plan for Cinema | Marmitex Delivery Layout | Set Up a Convenience Store | Fast food Plant | Clinic Floor Plan Lyaut | Disposable Diapers Business Plan | Calabrian Liquid Smoke Manufacturing | T-Shirt Manufacturing Layout | Baby Bag Manufacturers | What Machinery Is Used To Produce Slippers? | Hair Clip Factory | Clamp Assembly Machine | How to Assemble a Pool Table | Prefabricated Slab Model Project | Ready-Made Antenna Projects | Aluminum Casting and Laws | Wheelchair Production | Setting Up a Clinical Analysis Laboratory | Dairy Organization Chart Template | Car Wash Names In English | Workshop Equipment Financing | Food Traceability Pop Template | Cost of Building Rodeo Grandstands | Opening a Rubble Company | Equipment for Setting Up a Pest Control Company | How Do I Set Up My Dispatcher? | Investment to Open Cell Phone Repair Shop | Bnds Project to Finance a Well Drilling Machine | How to Draw Ecological Brick Dwg | Financial Plan for Snacks | Setting Up a Tapioca Biscuit Factory | Mushroom Compost Pasteurization Tunnel | Veterinary Clinical Plants |

 

Other projects ready:

How to start Factory to Produce Fruit Sweets and Fruit Pulp with capacity for 30.000 Kg/day.
Project Slaughterhouse for Bovines and Swines - 150 animals/day - area of 1.200 m² (1.435,2 sq.yd).
PDF Factory to Produce Paint with capacity for 5.000 liters/day.
Plant and layout Fishing Vessels to Produce and Process Fishes with capacity for 5.000 Kg/day.
Project Natural Kitchen with capacity for 100 meals per day.
Project Pharmaceutical Industries for Veterinary Medicine with an area of 1.600 m².
FeasibilitySlaughterhouse Bovines, Swines and Equines with capacity for 1.000 animals per day.
Business plant Cold Storage Room for Fresh Fish and Fish products, with area of 260 m² (310,96 sq.yd) and capacity for 3.000 kg/day.
Project Soft Drinks Factory with an area of 1.380 m² and capacity for 40.000 liters/day.
How to start Factory for Fruit Polp and Tomato processing (Acerola, Pineapple, Cashew-nut, Mango, Papaya, Passion Fruit, Strawberry, Guava, Tomato), with 220 m2 (263,12 sq.yd.) area and capacity of 5.000 kg/day.

Project - how to start Factory to Produce Chocolate with capacity for 1.000 Kg/day.