Ready project Factory to Produce Energy Drinks with capacity for 15.000 liters/day.

CODE - REFR-024

Ready project Factory to Produce Energy Drinks with capacity for 15.000 liters/day.

CODE - REFR-024


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Reception of Packages
Storage for Packages
Production
Bottling
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Energy Drinks

How to start Factory to Produce Energy Drinks with capacity for 15.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Energy Drinks

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Energy Factory | Energy Manufacturing | Energy Manufacturing | Energy Drink Manufacturing | How Much Does It Cost To Build A Poultry Shed? | What Do I Need to Assemble a Boboniere? | Roll On Manufacturer | Computer Store Counter Design | Adventure Equipment for Sale | Floor Plan of a Gas Station | Juice House Business | Set up Disposables Distributor | Rubberizing Machine | Fruit Jam Production | How to Set Up a Beverage and Sweets Distributor | Construction Debris Recycling Flowchart | View Computer Project Plan | I Want to Set Up a Chicken Slaughterhouse | Society Football Court Projects | What are the Processes for Setting Up a Radiology Company? | Office Plans and Projects | What You Need to Set Up an Industrial Kitchen for 300 Meals | Movie Theater Assembly Cost | Spa Projects | Car Wash Physical Arrangement | Floor Plan of a Nursing Home | Factory Project for the Production of Saline Solution with a Production Capacity of 20,000 Liters Per Day. | Land for setting up a marble factory | Ready-made templates for business plan projects in the T-shirt printing industry | Curtain Floor Plan | Slipper Strap Supplier | Factory Tracks | Barbecue Skewers Supplier | Example of a Shopping Mall Floor Plan | Organizational Chart of Precast Company | Wood Stove Projects | Assemble a Brick Ceramic | Construction Sieves | Macroscopy Room | Yogurt Factory Equipment | Commercial Laundry Organization Chart | Machines for Setting Up a Motorcycle Workshop | Design a Wooden and Metal Skate Park | Standard Operating Procedure for Carriers | Ppho Template | Alelie Business Plan Template | Financing Projects for Visual Communication Companies | Setting Up a Postal Service Company | How to Set Up a Vehicle Air Conditioning Workshop | How to Set Up a Taxi Station | How to Set Up an Organic Bread Factory | Equipment for Making Tiles with Milk Packaging | Ready-made Jobs How to Set Up a Company | Pasteurized Orange Juice Machine | Greenhouse Design for Mushroom Cultivation | Granola Making Machine | Machine for producing ointments |

 

Other projects ready:

How to start Factory to Produce Water Rakes with capacity for 10.000 units per day.
Project Factory to Produce Cachaça (Liquor), Açúcar Mascavo (Brown Sugar), Rapadura and Melado, with capacity for 5.000 liters/day. (To be built in a flat land).
PDF Factory to Produce Ready Seasoning with capacity for 3.000 Kg per day.
Plant and layout Tannery Frog Skin with capacity to Produce 5.000 skins/day.
Project Industry Mineral Water Bottling with capacity for 16.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups.
Project Clothing Industry to Produce Upholstery with capacity for 1.000 garments/day.
FeasibilityFactory to Produce Vinegar made from Wine with capacity for 1.000 liters/day.
Business plant Milk and Dairy Industry to be built in 2 phases: 1st phase: Milk Packaging, with 95 m2 (113,62 sq.yd.) area and capacity for 4000 liters/day. 2nd phase: Milk Packaging, Fresh Cheeses production, Yogurt and Milky Beverage, with 200 m2 (239,2 sq.yd.) area and capacity for 8000 liters/day.
Project Factory to Produce Wine, with capacity for 400.000 liters/year.
How to start Factory to Produce Bala de Coco (Coconut Candy) with capacity for 3.000 Kg/day.

Project - how to start Factory to Produce Energy Drinks with capacity for 15.000 liters/day.