Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Factory to Produce Energy Drinks with capacity for 300 liters/day.
CODE - REFR-018
Ready project Factory to Produce Energy Drinks with capacity for 300 liters/day.
CODE - REFR-018
Project ready with:
Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Reception of Packages
Storage for Packages
Production
Bottling
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Energy Drinks
OPTIONAL SERVICES:
Financial Feasibility Study of Factory to Produce Energy Drinks with capacity for 300 liters/day.
Business plan for Factory to Produce Energy Drinks with capacity for 300 liters/day.
3D project of Factory to Produce Energy Drinks with capacity for 300 liters/day.
Projects with other capacities
Factory to Produce Energy Drinks
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
How to Make an Energy Factory
|
Cattle Confinement Plants
|
Nail Polish Filling Machine
|
How to Invest in a Fishing Shop
|
Ready Projects Bank Branches
|
Candy Store Models
|
How to Set Up a General Party Supplies Store
|
Clothing Store Floor Plan
|
Companies Specialized in Dulce de Leche Production Equipment
|
Sketch of a Floor Plan for a Homeopathic Pharmacy
|
Sanitary Landfill Project.dwg Plan
|
School Support Business
|
Mini Swine Slaughterhouse Standards
|
Pie Machine
|
Assemble a 7-a-side football pitch
|
DWG Surgical Center Plan
|
How to Design a Physiotherapy Clinic for 20 People
|
Bodybuilding Chain Layout
|
Draft Beer Bar Design
|
Gym Equipment Factory Project
|
Open a Bowling Business
|
Truck Wash Project
|
What is needed to set up a water analysis laboratory?
|
How to Set Up a Security Seal Company
|
Project for Embroidery Company
|
Articles on Textile Processing
|
Starting a Plastic Bag Business
|
Clothes Peg Manufacturer
|
Eucalyptus Autoclave Treatment Undertaking Project
|
Ind Vibrating Table for Slab
|
Guitar and Bass Manufacturing Flowchart
|
.party sweets
|
Construction Stage of Dairy Facilities
|
Chantilly Cream Making
|
Motorhome Manufacturing Cost
|
3 Bedroom House Floor Plan
|
Operational Process Ready
|
Pop5 Pest Control
|
How Much Does It Cost To Set Up A Bus Company
|
Rapid Delivery Company List
|
Concert Clothing Price List
|
Home Maintenance Checklist
|
Setting Up An Earthmoving Company What Machinery Do You Need?
|
Ready-Made Business Plan for a Fruit Pulp Factory
|
Frozen Pasta Factory Layout
|
How to Set Up a Shrimp Farm
|
Cassava Industry Equipment Stick
|
Ice Company Project
|
Pequi Cream Process Flowchart
|
Animal Cremation Machine
|
Other projects ready:
How to start Factory to Produce Candles with capacity for 1.000 Kg/day.
Project Factory to Produce Mushroom Shiitake with capacity for 3.000 Kg per day.
PDF Industry to Produce Body Soap with an area of 400 m² and capacity for 10.000 kg/day.
Plant and layout Soft Drinks Factory with an area of 800 m² and capacity for 20.000 liters/day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Butter, with capacity for 1000 liters/day.
Project Factory Extraction of Chestnut Shell Liquid (LCC) with capacity for 500 liters/day.
FeasibilityFactory to Produce Barbecue Spit with capacity for 1.000 Kg/day.
Business plant Clothing Industry to Produce Cloth Strainer with capacity for 200 units/day.
Project Factory to Produce Banana Flour (Banana in Powder) with capacity for 3.000 Kg per day.
How to start Microbrewery with an area of 300 m² and capacity for 3.000 liters/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US