Ready project Factory to Produce Energy Drinks with capacity for 500 liters/day.

CODE - REFR-019

Ready project Factory to Produce Energy Drinks with capacity for 500 liters/day.

CODE - REFR-019


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Reception of Packages
Storage for Packages
Production
Bottling
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Energy Drinks

How to start Factory to Produce Energy Drinks with capacity for 500 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Energy Drinks

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Set Up an Energy Products Company | How to Set Up an Energy Factory | Chicken Farm Plant With 30,000 Birds | Lipstick Organization Chart | Goat Shed Floor Plan | Projects for Photo Developing Shops | Flowchart In Tire Shop | Rotisserie Plant | Opening a Plaster Company | I Want to Open a Fabric Store | Kero Kero Distributor Floor Plan | How to Set Up a Food Basket Business | Driving School Financing | Small Refrigerator Plant | Price per m2 of work for refrigerator | Gym Floor Plan | Pop Template for Doctors Office | Project Model for PSF Equipment | Ready-made Schema Templates | List of materials and utensils for setting up a buffet | Building Models for Inns | Industrial Kitchen Physical Area | Lava Jato layout | Children's Party House Models Projects | Equipment Production Flowchart | Mattress Factory Plant | Manufacturing Organization Chart | Uniform Manufacturing Process Flowchart | How to Set Up a TNT Factory | Expandable Polystyrene Tray Manufacturers | Raw Material for School Desks | Machine for Making Wooden Frames | Procedure for Manufacturing Masonry Posts | Materials for Making Kites | Machines for assembling an aluminum frame | Fire Galvanizing Equipment Manufacturers | Setting up Dental Prosthetics Laboratory | Ace Yogurt Popsicle Factory | GMP for Pest Control | Alliance Workshop Project | Standard Operating Procedure Dairy Model | Pop Models In Restaurants | Lay Out Craft Paper Workshop | I Want to Set Up a Service Provision Company | I Want to Open a Car Rental Company | How to Set Up a Sales Representative Office | Ready-made Business Plan for Cleaning Service Provider | Pig Farm Planning | Confectionery Projects | Ready-made Biscuit Company Business Plan | Chestnut Extraction Project | Fruit Processing Plant Projects | Pepper Sauce Factories | Pet Shop 50 M2 |

 

Other projects ready:

How to start Factory to Produce Clothes Peg with capacity for 1.000 Kg/day.
Project Gymnasium (with swimming pool, gymnastics room, body building area and other rooms) with capacity for 30 people.
PDF Marble and Granite Factories to Produce Cutted and Polished Stones and to Cut Marble and Granite Floors with capacity for 4 Blocks per Week.
Plant and layout Family Health Program with an area of 300 m2.
Project Factory to Produce Ceramic Floors with capacity for 1.000 m2/day.
Project Factory to Produce Expanded Clay with capacity for 5.000 Kg/day.
FeasibilityMilk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Yogurt, Milky Beverages, with capacity of 6000 liters/day.
Business plant Clothing Industry to Produce Suit, Jacket and Suit Pants with capacity for 200 garments/day.
Project Rendering with capacity for 5 tons/day.
How to start Factory Improvement and Packing of Cereals, Flours and Grains with capacity for 3.000 kg/day.

Project - how to start Factory to Produce Energy Drinks with capacity for 500 liters/day.