Ready project Factory to Produce Hard Candies with capacity for 1.000 Kg/day.

CODE - DC-015

Ready project Factory to Produce Hard Candies with capacity for 1.000 Kg/day.

CODE - DC-015


Project ready with:

Industry with the following sections:
Reception Platform for Raw Material and Ingredients
Storage for Raw Material
Storage for Ingredients
Manufacture Room
Packaging Room
Storage for Finished Products
Storage for Cleaning Material
Expedition
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Hard Candies

How to start Factory to Produce Hard Candies with capacity for 1.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Hard Candies

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Project Production Capacity | Production Capacity of Candy Industry | How to Set Up a Candy Company | Citronella Essence In Pocos De Caldas | Musical Instrument Store Business Plan | How to Set Up an Oil Change Shop | Tobacco Shop - How to Set One Up | Consulting in the Snack Bar Area | Utility Store Project Template | Costume Rental Store Facade | Candy Deposit | Beverage Distributor Project Template | Ecological Asphalt Project | How to Set Up a Technical School Examples | Layout Butchers | How to Open a Refrigerator | How to Mota an Ambulatory | Radiological Clinic Floor Plan | Dental Clinic Financing | How to Set Up a Micro Motel Project | Budgets for Setting Up a Movie Theater | How to Set Up a Campsite | What You Need to Set Up a Convenience Store at a Gas Station | 100m2 House Model | Beauty Clinic Suppliers | How to Set Up a Gauze Compress Factory | Candle Factory Flowchart | Example of a Work Plan for Industry | What I Need to Make Panties | Putting on Sandals | Door Manufacturing Flowchart | Manual Capacity With Popsicle Stick | Set Up an Aeromodelling Company | Lajes2fequipamentos factory | Who Manufactures Wall Clocks in Brazil | Ecological Bricks Manufacturing Project | Electroplating Business Plan | Clinical Analysis Laboratory Equipment | Floor Plan Milk B | How to Open a Laundromat | Of-029 Motorcycle Workshop With Capacity For 200 Motorcycles2fday. | Organizational Chart for Golf Clubs | Ready Pop Model Equipment and Utensils | Roatan Park Plant | What Do I Need to Set Up a Sewing Business? | Reforestation Project Model | Theodolites by Bnds | Study on How to Open a Bicycle Shop | Pocos De Caldas Asphalt Blanket | Foliar Fertilizer Industry Project | Model of a Flowchart of a Concrete Tile Production Process | Cake Factory Equipment | Roasted and Ground Coffee Microcompany | Set Up a Seasoning Condiment Company | Pre-cooked cassava | Veterinary Clinic Financial Plan |

 

Other projects ready:

How to start Industry Mineral Water Bottling with capacity for 3.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters and plastic cups with a machine to make PET Bottles.
Project Clothing Industry to Produce Female Tencel Jeans Pants with capacity for 100 garments/day.
PDF Clothing Industry to Produce Leather Clothes with capacity for 200 garments/day.
Plant and layout Factory to Produce Crystallized Cashew with capacity for 1.000 Kg per day.
Project Factory to Produce Fruit Polp Cocktails with Alcoholic Drinks (Caipirinha, Lime Liqueur, Lime Cream, Aromatic Mix with Lime, Strawberry, Cupuaçú, Melon, Açaí, Mango and Guaraná) and Teas, with capacity for 3.000 liters/day.
Project Industrial Laundry with capacity for 3.000 kg of Clothes per day.
FeasibilityMilk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Whey Cheese, Butter, Yogurt, Milky Beverages, Packed Milk types B and C, Sweet Milk, Milk in Bulk, Parmesan, Ementhal Cheese, Gruyere Cheese, Cheese with Blue Mould (Roquefort, Gorgonzola), Cheese with White Mould (Camembert, Brie), with capacity of 5000 liters/day. (Complete Factory)
Business plant Factory to Produce Scented Pillows with capacity for 500 pillows per day.
Project Factory to Produce Ceramics (French Tiles and Bricks) with capacity for 15.000 Kg/day.
How to start Clinic (Polyclinic) for Cities with until 50.000 inhabitants.

Project - how to start Factory to Produce Hard Candies with capacity for 1.000 Kg/day.