Ready project Factory to Produce Hard Candies with capacity for 3.000 Kg/day.

CODE - DC-016

Ready project Factory to Produce Hard Candies with capacity for 3.000 Kg/day.

CODE - DC-016


Project ready with:

Industry with the following sections:
Reception Platform for Raw Material and Ingredients
Storage for Raw Material
Storage for Ingredients
Manufacture Room
Packaging Room
Storage for Finished Products
Storage for Cleaning Material
Expedition
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Hard Candies

How to start Factory to Produce Hard Candies with capacity for 3.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Hard Candies

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Bullet Production | Open Minimarket | Renting Tools Is A Good Business | Health Surveillance Aracaju | Cold Storage Business Plan | Pie Factory With Capacity For 500 Kg Per Day. | Commercial Ready Business Plans | Hospital Supplies Distributor Business Plan#q=Hospital Supplies Distributor Business Plan | Frozen Food Industry Layout | Work Plan for Toy Library | Specialized in Gut Room Equipment | Quail Slaughterhouse | Multi-Sports Court Floor Plan Drawing | What is Necessary to Set Up a Physical Plan for a Medical Clinic Within a Hospital | Description of Equipment for Health Units | How Much Does It Cost to Set Up an Intensive Care Unit? | How to Set Up Small Coffee Shops | Supermarket Financing Project Templates | E280a2How to Set Up an Experimental Kitchen | Nightclub Business Plan | Car Wash Project | Events Enterprise Organization Chart | Hemodialysis Solution Concentrate | Industry Project C | Put Together a Polo Shirt | Project Model for Making Brooms Using PET Bottles | Pickup Hood Manufacturers | Making Drums | Setting Up a Carpentry Shop | Asphalt Project | Egg Tray Factories | Aluminum Foil Manufacturer | Packaging Factory Project | Blueprint for Setting Up a Clinical Analysis Laboratory | Cheese Factory Project | Water Filling Organization Chart | How to Open a Parking Lot | Pop Models for the Meat Industry | Pop Templates for Clinical Analysis Laboratories | Hairdresser Project Template | How to Finance an Organic Garden with a Greenhouse | Open Company Tracking | HR Consulting Flowchart | Open a Refrigeration Company | What Do I Need to Set Up a Studio for Filming? | Set Up a Popsicle Company | How to Set Up a Pasta Factory | Is it worth opening a factory to produce tapioca starch cookies? | How to Set Up a Fruit Pulp Distributor | Set up Ketchup Factory | How to Make Dog Sticks |

 

Other projects ready:

How to start Bakery to Produce Dog Products (Panetoni, Cookie, Cracker, etc) with an area of 500 m2.
Project Brewery with Bar, Restaurant and Brewery and Chopp Factory with capacity for 500 liters/day.
PDF Industry Mineral Water Bottling with capacity for 5.000 liters/hour, in flagons of 10 and 20 liters and bottles of 1 and 2 liters.
Plant and layout Flower Shop with an area of 100 m2.
Project Factory to Produce Canned Vegetables (Canned Corn, Canned Pea, Canned Potato, Canned Carrot, Selection of Canned Vegetables) with capacity for 20.000 Kg per day.
Project Factory to Produce Water Rakes with capacity for 5.000 units per day.
FeasibilityFactory for Yam Flour with capacity for 1.000 kg / day and area of 225 m².
Business plant Factory to Produce Ceramic Floors with capacity for 30.000 m2/day.
Project Factory to Produce Mayonnaise with capacity for 20.000 Kg per day.
How to start Factory to Produce Macaroni for Fresh and Dry Pasta with capacity for 500 kg/day.

Project - how to start Factory to Produce Hard Candies with capacity for 3.000 Kg/day.