Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Factory to Produce Isotonic Drinks with capacity for 5.000 liters/day.
CODE - REFR-013
Ready project Factory to Produce Isotonic Drinks with capacity for 5.000 liters/day.
CODE - REFR-013
Project ready with:
Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Reception of Packages
Storage for Packages
Production
Bottling
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Isotonic Drinks
OPTIONAL SERVICES:
Financial Feasibility Study of Factory to Produce Isotonic Drinks with capacity for 5.000 liters/day.
Business plan for Factory to Produce Isotonic Drinks with capacity for 5.000 liters/day.
3D project of Factory to Produce Isotonic Drinks with capacity for 5.000 liters/day.
Projects with other capacities
Factory to Produce Isotonic Drinks
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Isotonic Factory
|
Isotonic Filling Factory
|
Packaging of isotonic beverages
|
Economic Viability of Beverages
|
Mel's House2fmodel
|
How to Get Financing to Build a Biodigester
|
Country of Origin and Softener Company Name
|
How a Minimarket Works
|
Concrete mixers Bnds
|
Project to Set Up a Business Selling Dental Products
|
Products for Setting Up a Cold Cuts and Dairy Store
|
Physical-financial schedule of the pies
|
What Business to Set Up With 20,000 Reais
|
Projects for 400mc2b2
|
What You Need to Set Up a Frozen Food Store
|
Ready-made work for students in the toy library
|
Sheep Slaughtering Equipment
|
How to Invest in Quail
|
Multi-sports court facade
|
What It Takes to Open a Medical Practice
|
Physical Structure of a UBS Floor Plan
|
Material Room and Medication Room in the ICU
|
Cafeteria Investment Project
|
Supermarket Floor Plan - Dwg
|
Experimental Kitchen Layout
|
Nightclub Business Plan
|
Car Wash Project.dwg
|
How to Build a Party Room
|
Polyelectrolyte Concentrate for Hemodialysis 28cphd29
|
Shirt Factory Plant
|
Set Up Polo Shirt Distributor
|
Pet Broom Factory Budget
|
Convertible Car Factory in Brazil
|
Drumsticks Factory
|
Finame Code Carpentry
|
Asphalt Plant Project
|
Egg Tray Making Machine
|
Cardboard Factory Layout
|
How to Buy Machine to Manufacture Exhausts
|
Eterinary Laboratory Project
|
Cheese Factory Construction Projects
|
Mineral Water Industry Layout
|
How to Manage a Parking Lot
|
Operating Procedure Templates
|
Pop In The Lab
|
Beauty Salon Model In DWG
|
Vegetable Garden Design Scheme
|
Opening a Vehicle Tracking Company Its Cost
|
Consulting Budget Template
|
How to Open a Refrigeration Auto
|
Filming Production Project
|
Popsicle Factory Names
|
Pasta Industry Flowchart
|
Equipment for Making Cookies
|
Fruit Juice Production Equipment
|
Sachet Factory Business Plan
|
Dog Stick Factory
|
Other projects ready:
How to start Tannery for Wet Blue until Finishing Plant, with capacity for 100 leathers/day.
Project Sterilized Material Central with a built area of 400 m².
PDF Factory to Produce Powder Hair Dye with capacity for 300 Kg/day.
Plant and layout Drinks, Non-Perishable Food, Milk Products, Meats, Cold Meat and Colds Deliverer with capacity for 20.000 Kg/day.
Project Clothing Industry to Produce Knitwear with Printing Sector with capacity for 200 garments/day.
Project Clothing Industry to Produce Jeans Pants with Laundry Sector (Stone Wash) with capacity for 50 garments/day.
FeasibilitySlaughterhouse Swines, Caprines, Ovines with capacity for 700 animals per day.
Business plant Slaughterhouse Bovines, Swines and Ostrich with capacity for 10 animals per day.
Project Laboratory to Produce Parental Controls with capacity for 3.000 Kg/day.
How to start Factory to Produce Ice Cream Syrup with capacity for 5.000 Kg/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US