Ready project Factory to Produce Isotonic Drinks with capacity for 5.000 liters/day.

CODE - REFR-013

Ready project Factory to Produce Isotonic Drinks with capacity for 5.000 liters/day.

CODE - REFR-013


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage of Raw Material
Reception of Packages
Storage for Packages
Production
Bottling
Storage for Finished Products
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Isotonic Drinks

How to start Factory to Produce Isotonic Drinks with capacity for 5.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Isotonic Drinks

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Packaging of isotonic beverages | Isotonic Factory | Economic Viability of Beverages | Isotonic Filling Factory | Mel's House2fmodel | How to Get Financing to Build a Biodigester | Country of Origin and Softener Company Name | How a Minimarket Works | Concrete mixers Bnds | Project to Set Up a Business Selling Dental Products | Products for Setting Up a Cold Cuts and Dairy Store | Physical-financial schedule of the pies | What Business to Set Up With 20,000 Reais | Projects for 400mc2b2 | What You Need to Set Up a Frozen Food Store | Ready-made work for students in the toy library | Sheep Slaughtering Equipment | How to Invest in Quail | Multi-sports court facade | What It Takes to Open a Medical Practice | Physical Structure of a UBS Floor Plan | Material Room and Medication Room in the ICU | Cafeteria Investment Project | Supermarket Floor Plan - Dwg | Experimental Kitchen Layout | Nightclub Business Plan | Car Wash Project.dwg | How to Build a Party Room | Polyelectrolyte Concentrate for Hemodialysis 28cphd29 | Shirt Factory Plant | Set Up Polo Shirt Distributor | Pet Broom Factory Budget | Convertible Car Factory in Brazil | Drumsticks Factory | Finame Code Carpentry | Asphalt Plant Project | Egg Tray Making Machine | Cardboard Factory Layout | How to Buy Machine to Manufacture Exhausts | Eterinary Laboratory Project | Cheese Factory Construction Projects | Mineral Water Industry Layout | How to Manage a Parking Lot | Operating Procedure Templates | Pop In The Lab | Beauty Salon Model In DWG | Vegetable Garden Design Scheme | Opening a Vehicle Tracking Company Its Cost | Consulting Budget Template | How to Open a Refrigeration Auto | Filming Production Project | Popsicle Factory Names | Pasta Industry Flowchart | Equipment for Making Cookies | Fruit Juice Production Equipment | Sachet Factory Business Plan | Dog Stick Factory |

 

Other projects ready:

How to start Factory to Produce Macaroni Rice with capacity for 15.000 Kg/day.
Project Mineral Water Deliverer with capacity to Produce 1.000 liters/day.
PDF Egg Sorters with capacity for 15.000 Eggs/day.
Plant and layout Cachaça (Liquor) Factory, with capacity for 20.000 liters/day. (To be built in a flat land).
Project Industry to Produce Shampoo, Creams and Gel with an area of 600 m² and capacity for 10.000 kg/day.
Project Fish and Pay with capacity for 300 Kg/day.
FeasibilityFactory to Recycle Paper with capacity for 5.000 Kg/day.
Business plant Industrial Kitchen without Restaurant with capacity for 750 meals per day.
Project Factory for Popcorn Processing (Micro-Wbird package) with 500m² (598 sq.yd.) and capacity of 5.000 kg/day).
How to start Tire Recapping with capacity for 300 tires per day.

Project - how to start Factory to Produce Isotonic Drinks with capacity for 5.000 liters/day.