Ready project Factory to Produce Mead with capacity for 1.000 liters/day.
CODE - AP-016
Ready project Factory to Produce Mead with capacity for 1.000 liters/day.
CODE - AP-016Project ready with:
Apiary with the following sections:Room to keep Beehive Boxes
Reception of Honey
Uncapping and Centrifugation Room
Fermentation Room
Bottling Room
Storage
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Mead
OPTIONAL SERVICES:
- Financial Feasibility Study of Factory to Produce Mead with capacity for 1.000 liters/day.
- Business plan for Factory to Produce Mead with capacity for 1.000 liters/day.
- 3D project of Factory to Produce Mead with capacity for 1.000 liters/day.
Projects with other capacities
Factory to Produce Mead
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Mead Producers in Brazil | Viability of the Mead Industry | How to Start a Mead Production Business | Mead Factory | Mead Factory | Mead Ebook | Mead Production Projects | Mead Making Equipment | Mead Production Industry | Mead Production | Ready Made Bar Soap Flowchart Drawing | Music Store Project | How to Set Up a Lubricant Company | Sebrae How to Open a Tobacco Shop | How to Set Up a Hot Dog Stand | Designing Online Store | How to Find Clothing Reform Chart | Layouts for Sweet Companies | Set Up a Beverage Depot | How to Start an Eco-Friendly Business | How Much Meat Do I Need to Set Up a Butcher Shop? | Slaughter Table for Cattle2c Pig2c Goat | List of Materials and Equipment for Outpatient Clinics | How to Set Up a Dental X-ray Room | Odontology Clinic Project | Convention Center Floor Plan In DWG | Ready Made CAD Projects Cinema | Camping Support Area Project | How to Set Up a Convenience Store at a Gas Station | Brewery Equipment | External Beauty Center Plan | Build a Toilet Paper Making Machine | Project on How to Set Up a Sewing Shop | Puppet Project Template | Slipper Factory | Manufacturer Tr | Popsicle Stick Factory | Building a Miniature Aircraft | Set up a precast slab factory | Pocos De Caldas Protection Screen | Eco-Friendly Business Names | Treatment of metal surfaces with trivalent zinc | Instructions for Setting Up a Clinical Analysis Laboratory | Butter Factory Layout | Download Hotel Laundry CAD Floor Plan | How to Set Up a Mechanical Workshop Project | Town Halls with 10,000 Inhabitants | Pop Cleaning Physiotherapy Equipment | Vaquejada Truck Project | Ready Project for Sewing School | Confinement Flowchart | Insurance Broker Capacity | What I Need to Set Up a Bicycle Repair Shop | Glass Service Contract Template | Project to Set Up Seed Production | I Want to Open a Cake Factory | Coffee Roasting Feasibility | I Want to Start a Small Seasoning and Condiment Company | Wheat Flour Production Flowchart | Veterinary Clinic Projects |
Other projects ready:
How to start Company of Maintenance of Fire Extinguishers with capacity for 500 Extinguishers per day.
Project Meat Processing Area, with area of 200 m² (239,2 sq.yd.) and capacity for 5.000 kg/day.
PDF Factory to Produce Caffeine (Transform Coffee in Caffeine) with capacity for 300 liters/day.
Plant and layout Factory to Produce Costume Jewelry with capacity for 3.000 jewelries per day.
Project Factory to Produce Fodder from Sisal Fibers with capacity for 500 Kg/day.
Project Telemarketing with capacity for 300 operators.
FeasibilityCold Storage Room to Produce Frozen and Threaded Fishes with Factory for Breaded Fish and Fish Products with capacity for 60.000 Kg/day.
Business plant Factory to Produce Banana Powder (Banana Flour) with capacity for 30.000 Kg/day.
Project Factory to Produce Fresh Dough for Pizza with capacity for 20.000 Kg/day.
How to start Soft Drinks Factory with an area of 800 m² and capacity for 20.000 liters/day.



