Ready project Factory to Produce Mead with capacity for 1.000 liters/day.

CODE - AP-016

Ready project Factory to Produce Mead with capacity for 1.000 liters/day.

CODE - AP-016


Project ready with:

Apiary with the following sections:
Room to keep Beehive Boxes
Reception of Honey
Uncapping and Centrifugation Room
Fermentation Room
Bottling Room
Storage
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Mead

How to start Factory to Produce Mead with capacity for 1.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Mead

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Mead Production | Mead Factory | Mead Factory | Viability of the Mead Industry | Mead Making Equipment | Mead Production Industry | Mead Producers in Brazil | Mead Ebook | Mead Production Projects | How to Start a Mead Production Business | Ready Made Bar Soap Flowchart Drawing | Music Store Project | How to Set Up a Lubricant Company | Sebrae How to Open a Tobacco Shop | How to Set Up a Hot Dog Stand | Designing Online Store | How to Find Clothing Reform Chart | Layouts for Sweet Companies | Set Up a Beverage Depot | How to Start an Eco-Friendly Business | How Much Meat Do I Need to Set Up a Butcher Shop? | Slaughter Table for Cattle2c Pig2c Goat | List of Materials and Equipment for Outpatient Clinics | How to Set Up a Dental X-ray Room | Odontology Clinic Project | Convention Center Floor Plan In DWG | Ready Made CAD Projects Cinema | Camping Support Area Project | How to Set Up a Convenience Store at a Gas Station | Brewery Equipment | External Beauty Center Plan | Build a Toilet Paper Making Machine | Project on How to Set Up a Sewing Shop | Puppet Project Template | Slipper Factory | Manufacturer Tr | Popsicle Stick Factory | Building a Miniature Aircraft | Set up a precast slab factory | Pocos De Caldas Protection Screen | Eco-Friendly Business Names | Treatment of metal surfaces with trivalent zinc | Instructions for Setting Up a Clinical Analysis Laboratory | Butter Factory Layout | Download Hotel Laundry CAD Floor Plan | How to Set Up a Mechanical Workshop Project | Town Halls with 10,000 Inhabitants | Pop Cleaning Physiotherapy Equipment | Vaquejada Truck Project | Ready Project for Sewing School | Confinement Flowchart | Insurance Broker Capacity | What I Need to Set Up a Bicycle Repair Shop | Glass Service Contract Template | Project to Set Up Seed Production | I Want to Open a Cake Factory | Coffee Roasting Feasibility | I Want to Start a Small Seasoning and Condiment Company | Wheat Flour Production Flowchart | Veterinary Clinic Projects |

 

Other projects ready:

How to start Clothing Industry to Produce Heavy Fabrics (Canvas) with capacity for 300 garments/day.
Project Slaughterhouse Turkey with capacity for 500 animals per day.
PDF Meat Shop with an area of 300 m2.
Plant and layout Slaughterhouse Bovines and Swines with capacity to Slaughter 300 animals/day.
Project Shed for Bovine Confinement (Milk Cattles) in a Confinement Regime, with capacity for 250 animals and area of 1.000 m² and Mecanic Milking for 12 animals (area with 400 m²) and Milk Packaging (TYPE A MILK).
Project Factory to Produce Leather Scrap Bones (for Dogs) with capacity for 1.000 Kg/day.
FeasibilityMalharia with capacity for Production para 300 pieces por day.
Business plant Factory to Produce Fruit Juice, Frozen and Concentrated Fruit Pulp, Paste and Syrup Fruit Sweets, Fruit Jelly and Ice Ice Cream made from Fruit Pulp with capacity for 20.000 Kg/day.
Project Egg Sorters with capacity for 1.000 Eggs/day.
How to start Clothing Industry to Produce Denim Blouse with capacity for 500 garments/day.

Project - how to start Factory to Produce Mead with capacity for 1.000 liters/day.