Ready project Factory to Produce Mead with capacity for 3.000 liters/day.

CODE - AP-017

Ready project Factory to Produce Mead with capacity for 3.000 liters/day.

CODE - AP-017


Project ready with:

Apiary with the following sections:
Room to keep Beehive Boxes
Reception of Honey
Uncapping and Centrifugation Room
Fermentation Room
Bottling Room
Storage
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Mead

How to start Factory to Produce Mead with capacity for 3.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Mead

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Brazilian Mead Factory | Perfume Factory How to Set Up | Juma Cell Phone Store Templates | How to Assemble Accumulator House | Equipment for setting up stationery | How to Open a Mattress Store | How to Start a Clothing Business | Machinery for Making Chewy Caramels | Area of 100m2 | Waste Separation Model | Reinforcement Lesson Plan Template | Slaughterhouse Floor Plan | How to Create a Skewers Factory | I Want to Build a Soccer Field | Acupuncture Projects | Physiotherapy Clinic Facades | Hostel Financing BNDES | Holiday Camp - Setting Up a Project | Set up a fishing spot | Cachaça Project | Car Wash Plant | Open Cigarette Factory | Ready Made T-Shirt Factory Project | Project for Installation of Plastic Bag Factory | Officemoves | Set Up Factory and Sell Products | Mattress Production Flowchart | How to Start a Business Making Paper Boxes and Bags | How to Set Up a Marmitex Factory | Parmesan Factories | One Bedroom Popular House Projects | Pharmacy Pop27s Examples | Pop Companies | How to Set Up a Locksmith Workshop | Ecotourism Business Plan Template | Set Up a Home Construction Company | Stage Assembly Material | Frog Farm Business Plan | Ice Cream Factories | Tips on How to Set Up a Bakery | Technical and Financial Data of Plasticulture | Pickle Manufacturing Flowchart | How to Set Up a Pamonha Distributor | How to Open a Beauty Clinic |

 

Other projects ready:

How to start Factory to Produce Medical Oils with capacity for 500 liters/day.
Project Drinks and Soft Drinks Deliverer with volume of 5.000 liters/day.
PDF Factory to Produce Disposable Syringe with capacity for 10.000 Syringes per day.
Plant and layout Projeto de Frigorífico para Abate de Bovinos (Abate pelo Método Kosher) with capacity for 5 animais por day e área de 90 m2.
Project Factory to Produce Vinegar made from Apple with capacity for 5.000 liters/day.
Project Factory to Produce Grain Alcohol (Rice and Corn) with capacity for 100 liters/day.
FeasibilityFactory to Produce Ice Ice Cream made from Fruit Pulp with capacity for 15.000 Kg/day.
Business plant Drink Deliverer with capacity for 1.000 liters/day.
Project Factory to Produce Medical Oils with capacity for 1.000 liters/day.
How to start Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Butter, with capacity of 6000 liters/day.

Project - how to start Factory to Produce Mead with capacity for 3.000 liters/day.