Ready project Factory to Produce Natural Cosmetics with capacity for 500 Kg/day.
CODE - CM-151
Ready project Factory to Produce Natural Cosmetics with capacity for 500 Kg/day.
CODE - CM-151Project ready with:
Industry with the following sections:Reception of Raw Material
Storage for Raw Material
Storage for Packages
Production of Natural Cosmetics
Storage for Finished Products
Storage for Products in Observation
Offices
Canteens
Dressing Room
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Natural Cosmetics
OPTIONAL SERVICES:
- Financial Feasibility Study of Factory to Produce Natural Cosmetics with capacity for 500 Kg/day.
- Business plan for Factory to Produce Natural Cosmetics with capacity for 500 Kg/day.
- 3D project of Factory to Produce Natural Cosmetics with capacity for 500 Kg/day.
Projects with other capacities
Factory to Produce Natural Cosmetics
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Production of Natural Cosmetics | Legislation on the Manufacture of Natural Cosmetics | Natural Cosmetics Factory Floor Plan | How to Make Natural Cosmetics | Cosmetics Financing | Natural Cosmetics Storage | Cosmetics Company Project Template | Feasibility Project for Cosmetics Industry | Viability of Natural Cosmetics | How to Make Natural Cosmetics | How to Create a Natural Cosmetics Business Plan | Feasibility Project to Implement a Cosmetics Company | How to Make Natural Cosmetics | Cosmetics Business Plan | Legislation on Natural Cosmetics | Cosmetics Factory Layout | How to Set Up a Sachet Factory | Project Template for Setting Up a Motorcycle Parts Sales Business | Business Plan for Motorcycle Parts Store | Names for a Roast Chicken Company | How Much Does It Cost to Open a Fish Shop? | How to Set Up a Shutter Factory | Clothing Store Projects 20m2 | How to Set Up a Food Basket Sales Business | Budget for Setting Up a Senior Citizens Community Center | About Figorifico Flowchart | Snack Factory Drawing How to Make a Floor Plan | Pig Slaughter Flowchart | How to Set Up a Nursing Consultancy | How to Make a PSF Project | Ambulance Service Provider | Gymnasium Plant | 10 Bedroom Inn Floor Plan | School Kitchen Inventory Template | Nightclub Floor Plan | How to Start a Snack Bar | Building Project In Dwg | Tablet Making Equipment | We manufacture Resoling Matrix | What You Need to Set Up a Lingerie Factory | Carpet Industry Flowchart | How to Set Up a Plastic Bag Production Factory | Planks and Styrofoam and Factory and Santa Catarina | Carpentry Flowchart | Phosphorus Manufacturing | Mortar Making Machine | Graphics as Ontar | Anodizing Factory Layout | Cost of Setting Up a Machining Workshop | Dental Prosthesis Laboratory Layout | Examples of Projects for Opening a Powdered Milk Industry | Organizational Flow Chart of Related Company | Materials for Opening a Tire Shop | Pickled Smoked Quail Eggs Recipe | Standard Operating Program in Hospital | With 50 m2 you can set up a photography studio | How to Set Up a Manicure Shop | How to Open a Car Dealership | Accounting Office Templates Blueprints | Fire Extinguisher Recharging Workshop Sale | Budget for the sale of 200 hot dogs | Pig Farm Floor Plans | How Cereal Bars Are Made | How to Ship Natural Sandwiches | Pepper Factory | Finame Code Metal Silo | Making Dog Bones |
Other projects ready:
How to start Industry to Produce Creams, Hair Conditioner, Hand and Body Cream, Suntan Lotion with capacity for 5.000 Kg/day.
Project Factory Aluminum Casting with capacity for 10.000 Kg/day.
PDF Slaughterhouse to Sluaghter Bovine with capacity for 200 animals/day and Built area of 900 m² (1076,4 sq.yd), being able to reach the double of the regular capacity. Reception area for bones and blood. Area for Leather salting.
Plant and layout Marble and Granite Factories to Produce Cutted and Polished Stones and Marble and Granite Pieces (Sink, Counter and by Placing an Order) with capacity for 5 Blocks per Week.
Project Factory to Produce Mattress with capacity for 300 mattress per day.
Project Laboratory for Concrete Analysis with capacity for 300 tests per day.
FeasibilityFactory to Produce Cold Meat (with Deboned Meat Reception) with capacity for 5.000 Kg/day.
Business plant Pharmaceutical Industry with an area of 2.600 m².
Project Factory to Produce Cachaça of Honey with capacity for 5.000 liters/day.
How to start Factory to Produce Toilet Paper with capacity for 1.000 Kg/day.



