Ready project Factory to Produce Perfume with capacity for 3.000 liters/day.

CODE - CM-127

Ready project Factory to Produce Perfume with capacity for 3.000 liters/day.

CODE - CM-127


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking of Raw Material
Stocking of Packages
Producing Room
Packing Room
Stocking of Finished Products
Stocking of Products in Observation
Offices
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Perfume

How to start Factory to Produce Perfume with capacity for 3.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Perfume

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

A Perfume Company and Its Flowchart | How to Set Up a Perfume Factory | I Wanted to Set Up a Perfume Factory | Cosmetics Company Ornogram | Make a Shed for Raising Animals | Everything You Need to Set Up a Photo Developing Session | Set Up a Tire Sales Company | I Want to Open a Rotisserie | How to Run a Plastering Company | Children's Thrift Store Names | How to Open a Basic Food Basket Company | Floor Plan of the Training Center | Small Slaughterhouse Floor Plan Design | Fishmeal Manufacturing Schedule | Sports Court Dwg Projects | Floor Plan for Doctor's Office | Psf models | Physical Plan of an Emergency Room | Party Room Plans With Capacity For 400 People | Inns Building Models | Light Food Business Plan | How to Assemble Ma Boietete | Layout Lavatory | Children's Home Business Plan | Bandage Factory | Mattress Loyalty | Organizational Chart of a Clothing Company | Gronogram Templates for Uniform Production | Manufacturing Non-Woven Bags | Styrofoam Industry P2f Food | School Chair Production | Set up a frame factory | How to Make Fence Posts | Cardboard Box Industry | Aluminum Metalworking Organization Chart | I Want to Set Up a Galvanizing Plant | What Is Dental Care And Building Materials | Yogurt Ice Cream Factory | Good Practices Manual for Disinfestation | Car Workshop Layout Vehicles DWG | Dairy Industry Recall | Pop Up Restaurant Template | How to Create a Beauty Salon Organization Chart | How to Set Up a Domestic Employment Agency | How to Open a Van Rental Store | I Want to Open a Commercial Representation | Cleaning Service Contract Templates | How to Create a Recording Studio Business Plan | Overlapping Plants | Utensils for Setting Up a Bakery | Cream Cracker Biscuit Making Flowchart | Construction of a factory for eucalyptus oil | Setting Up An Acai Factory | Chili Sauce Production Line | Pet Shop Project |

 

Other projects ready:

How to start Factory to Produce Garapa (Sugar Cane Juice), with capacity for 5.000 liters/day.
Project Factory to Produce Fresh Dough for Pizza with capacity for 20.000 Kg/day.
PDF Factory to Produce Passion Fruit Juice with capacity for 500 liters per day.
Plant and layout Slaughterhouse Caprines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 10 animals/day.
Project Microbrewery, with capacity for 5.000 liters/day.
Project Tanning Ostrich Skin with capacity to Produce 750 Skins per day.
FeasibilityMilk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Whey Cheese, Butter, Yogurt, Milky Beverages, Packed Milk types B and C, Sweet Milk, with capacity of 10.000 liters/day.
Business plant Factory to Produce Vinegar made from Apple with capacity for 300 liters/day.
Project Clothing Industry to Produce Jeans Pants with Laundry Sector (Stone Wash) with capacity for 200 garments/day.
How to start Factory to Produce Cachaça dos Alemães (elaborated from melado of cane), with capacity for 3.000 liters/day.

Project - how to start Factory to Produce Perfume with capacity for 3.000 liters/day.