Ready project Factory to Produce Perfume with capacity for 3.000 liters/day.

CODE - CM-127

Ready project Factory to Produce Perfume with capacity for 3.000 liters/day.

CODE - CM-127


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking of Raw Material
Stocking of Packages
Producing Room
Packing Room
Stocking of Finished Products
Stocking of Products in Observation
Offices
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Perfume

How to start Factory to Produce Perfume with capacity for 3.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Perfume

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Set Up a Perfume Factory | I Wanted to Set Up a Perfume Factory | A Perfume Company and Its Flowchart | Cosmetics Company Ornogram | Make a Shed for Raising Animals | Everything You Need to Set Up a Photo Developing Session | Set Up a Tire Sales Company | I Want to Open a Rotisserie | How to Run a Plastering Company | Children's Thrift Store Names | How to Open a Basic Food Basket Company | Floor Plan of the Training Center | Small Slaughterhouse Floor Plan Design | Fishmeal Manufacturing Schedule | Sports Court Dwg Projects | Floor Plan for Doctor's Office | Psf models | Physical Plan of an Emergency Room | Party Room Plans With Capacity For 400 People | Inns Building Models | Light Food Business Plan | How to Assemble Ma Boietete | Layout Lavatory | Children's Home Business Plan | Bandage Factory | Mattress Loyalty | Organizational Chart of a Clothing Company | Gronogram Templates for Uniform Production | Manufacturing Non-Woven Bags | Styrofoam Industry P2f Food | School Chair Production | Set up a frame factory | How to Make Fence Posts | Cardboard Box Industry | Aluminum Metalworking Organization Chart | I Want to Set Up a Galvanizing Plant | What Is Dental Care And Building Materials | Yogurt Ice Cream Factory | Good Practices Manual for Disinfestation | Car Workshop Layout Vehicles DWG | Dairy Industry Recall | Pop Up Restaurant Template | How to Create a Beauty Salon Organization Chart | How to Set Up a Domestic Employment Agency | How to Open a Van Rental Store | I Want to Open a Commercial Representation | Cleaning Service Contract Templates | How to Create a Recording Studio Business Plan | Overlapping Plants | Utensils for Setting Up a Bakery | Cream Cracker Biscuit Making Flowchart | Construction of a factory for eucalyptus oil | Setting Up An Acai Factory | Chili Sauce Production Line | Pet Shop Project |

 

Other projects ready:

How to start Factory to Produce Barbecue Sauce with capacity for 500 liters/day.
Project Factory for Matutinal Cereal production with 250m² (299 sq.yd.) area and capacity of 1.500 kg/day.
PDF Clothing Industry to Produce Denim Blouse with capacity for 200 garments/day.
Plant and layout Factory to Produce Cocada (coconut candy) with capacity for 3.000 Kg/day.
Project Slaughterhouse for Frozen Fish and Fish Products with an area of 150 m2, and capacity for 1.000 kg/day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cheese with White Mould (Camembert, Brie), with capacity of 2000 liters/day.
FeasibilityLeather Tannery (just until Wet Blue) with capacity to Produce 1.000 leathers/day.
Business plant Factory to Recycle Plastic with capacity for 1.000 Kg/day.
Project Arabic Kitchen with capacity for 300 meals per day.
How to start Silkworm Shed to Produce Silkworm with an area of 120 m².

Project - how to start Factory to Produce Perfume with capacity for 3.000 liters/day.