Ready project Factory to Produce Pies with capacity for 300 Kg/day.

CODE - TRG-111

Ready project Factory to Produce Pies with capacity for 300 Kg/day.

CODE - TRG-111


Project ready with:

Industry with the following sections:
Reception of Raw Material
Storage for Raw Material
Production
Packages
Cold Chamber
Expedition
Offices
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Pies

How to start Factory to Produce Pies with capacity for 300 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Pies

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Cake Factory Projects | Soap Mass Suppliers | Minimarket Names | I Want A Project For Store Rental | Dental Supplies Store Project | How Much Does It Cost to Set Up a Dairy? | Baby Store Project | Equipment Needed to Set Up a Costume Rental Store | Layout of a compounding pharmacy | Condiments Industry Project | Electronic Models of Children's School | Sheep Slaughterhouse Model | Crematorium Oven for Cattle Slaughterhouse Refrigeration | Multi-Sports Court Project In Dwg | Project to Open a Clinic | Ubs Rooms Project | Uti Structure | Physical Plant Cafeteria | Supermarket Engegos Plan | Gym Equipment Financing | Dance Club Plans With Capacity For 500 | Car Wash Project Ready | I Want to Set Up a Dance Club | How to Make a Toothbrush Out of Cardboard | How to Treat Ox Bones for Crafts | How to Set Up an Industrial Ironing Shop | Polo Shirt Design Template | Teaching How to Make a Common Broom with Pet | How to Make a Dog Drinking Fountain | How to Manage a Concrete Plant | Plastic Tubes for Paper Industry | Bras Aluminum Pan | Motorcycle Exhaust Production | Analysis Laboratory Layout. Dwg | Milk Powder Mixer | Water Filler2c Cup | Vehicle Parking Schedule | Pop Hygiene and Staff Health | Pop Example for Mineral Water | Floor Plan of a Beauty Salon | Organic Greenhouses Budget | Cost For Tracking Company | How to Open a Surveying Company | Refrigeration Store Model | Filming Studio Assembly | Popsicle Packaging Template | Noodle Industry Plant | How to Set Up a Canned Vegetable Factory | Tomato Factory Floor Plan | Cosmetics Company Project |

 

Other projects ready:

How to start Factory to Produce Fish Flour and Fish Oil with capacity for 5.000 Kg/day.
Project Municipal Market with capacity for 50 box.
PDF Marble and Granite Factories to Produce Cutted and Polished Stones and Marble and Granite Pieces (Sink, Counter and by Placing an Order) with capacity for 4 Blocks per Week.
Plant and layout Cold Storage Room for Frozen Fish and Fish Products with area of 260 m² (310,96 sq.yd) and capacity for 3.000 kg/day.
Project Factory to Produce Tomato Extract, Tomato Pulp, Dry Tomato and Ketchup with capacity for 10.000 Kg per day.
Project Slaughterhouse for Bovines and Swines - 75 animals/day - srea of 800 m² (956,8 sq.yd).
FeasibilitySlaughterhouse Caprines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 75 animals/day.
Business plant Factory to Produce Injectable Medicine with capacity for 100.000 ampoules per day.
Project Factory Improvement and Production of Mamona Oil with capacity for 3.000 liters/day.
How to start Slaughterhouse Caprines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 200 animals/day.

Project - how to start Factory to Produce Pies with capacity for 300 Kg/day.