Ready project Factory to Produce Popsicles with capacity for 2.000 Kg/day.

CODE - SRV-007

Ready project Factory to Produce Popsicles with capacity for 2.000 Kg/day.

CODE - SRV-007


Project ready with:

Industry with the following sections:
Milk Reception Platform
Physical and Chemical Laboratory
Ingredients Reception Platform
Storage of Ingredients (ambient temperature)
Storage of Ingredients (under refrigeration)
Manufacture Room of Popsicles
Packaging
Storage of Packages
Freezing Chamber
Expedition
Office
Bathrooms
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Popsicles

How to start Factory to Produce Popsicles with capacity for 2.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Popsicles

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Set Up Your Business Factory | Popsicle Factory Project | Caipirinha Factory | Chicken Shed Construction | Lipstick Packaging Manufacturers | Capril Construction Model | I Want to Start a Dog Food Business | Setting Up a Tire Dealership | How to Assemble a Rotisserie | Acrylic Box Assembly Manual | Decorating Fabric Store or Assemble | Budget for Setting Up a Hospital Distributor | Basic Food Basket Distribution Company Projects | Construction Plans for Nursery School | Pop Model Of A Bovine Refrigerator Laundry | Hamburger Meat Factory | Economic Feasibility Study of Pig Farming Projects | Normal Delivery Room Assembly | Step by Step Guide to Setting Up a Family Health Unit | Emergency Room Standard Operating Procedures | Ready-made Buffet Business Plan | Dwg Projects For Hostels | Setting Up a Mexican Restaurant | Nightclub Business Plan | Car Wash Flowchart | Buffet Opening | Investment in Saline Solution Factory | Assemble a Jackhammer | Production Flow Clothing Manufacturing | I want to set up a scraper glove factory. Everything you need | Plastic Adhesive Factory | Plastic Rulers | Wooden Toy Model | Wooden bodies of Bnds | How to Build Concrete Mortars | Pipe Factory | 5c Aluminum Frames Project | Suggestion for Machining Company Names. | Financing for Dental Prosthetics Laboratory | Chocolate Plant | Hygiene in a Clinical Analysis Laboratory | List of Hot Dog Cart Manufacturers | Recall Procedure Model | How to Make a Pop for Restaurants | Floriculture Projects | How to Set Up a Senior Citizens Company | Ready-made Software Development Project Templates | Accounting Office Project | Fire Plant Model | I Want to Buy Equipment to Set Up a Pig Farm | Equipment for Setting Up a Bakery | Cream Cracker Additives | Annatto Plant Project | Fruit Jam Factory Schedule | How to Make Hot Sauce | 3D Bakery Projects |

 

Other projects ready:

How to start Tanning Fish Skin with capacity to Produce 5.000 skins per day.
Project Slaughterhouse Ovines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 5 animals/day.
PDF Clothing Industry to Produce T-Shirts with capacity for 300 garments/day.
Plant and layout Wine Factory with capacity for 400.000 liters/year and area of 1000 m².
Project Milk and Dairy Industry for Sweet Milk production, with capacity for 3.000 liters/day.
Project Slaughterhouse to Produce Cold Meat and Cured Food, with area of 150 m² (179,4 sq.yd) and capacity for 2000 kg/day (with reception for Boneless Meat).
FeasibilitySlaughterhouse Bovines, Swines and Caprines with capacity for 500 animals per day.
Business plant Marble and Granite Factories to Produce Cutted and Polished Stones, Marble and Granite Pieces (Sink, Counter and by Placing an Order) and to Cut Marble and Granite Floors with capacity for 3 Blocks per Week.
Project Factory to Produce Tomato Extract, Tomato Pulp, Dry Tomato and Ketchup with capacity for 10.000 Kg per day.
How to start Café with capacity for 70 people.

Project - how to start Factory to Produce Popsicles with capacity for 2.000 Kg/day.