Ready project Factory to Produce Rum with capacity for 3.000 liters/day.

CODE - AGR-094

Ready project Factory to Produce Rum with capacity for 3.000 liters/day.

CODE - AGR-094


Project ready with:

Industry with the following sections:

Reception
Fermentation
Distillation
Bottling
Aging Process
Storage
Expedition
Office
Dressing Room
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Rum

How to start Factory to Produce Rum with capacity for 3.000 liters/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Rum

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Rum Manufacturing Flowchart | Which Plant Is Used To Make Rum? | Rum Production Flowchart | Rum Production Flowchart | Plant That Makes Rum | Plant Used In The Manufacture Of Run | Rum Production Flowcharts | What Plant Is Used In The Manufacture Of Rum? | Rum Manufacturing Plant | Rum Production Plant | Rum Production Flowchart | Rum Manufacturing Flowchart | Rum Plant | Rum Production Flowchart | Rum Manufacturing | What Plant Is Used In The Manufacture Of Rum? | Plant Used to Make Rum | Rum Production | Rum Production Plant | What is the plant used to make rum? | Rum Processing Flowchart | Rum Production Flowchart | Which Plant Makes Rum? | Rum Production | Rum Factory | What is the plant used to make rum? | What Plant Is Used To Make Rum? | Exotic Bird Breeding Models | Lipstick Packaging Production | Sheep Shed Project | Photo Developer Factory | How Much Does It Cost To Open A Tire Shop | What is the basic material for a 50m2 building? | Rotisserie Cost | What Do I Need to Open a Plaster Industry? | Thrift Store Name Ideas | How to Manage a Medication Distributor | I want to open a basic food basket company. I want to know how much it costs to open it. | Driving School Flowchart | Cold Room Scheme | Swine Slaughterhouse Equipment | Sports Gym Floor Plan | Facade Projects of Medical Clinics | Ready-made Flowchart Templates | ICU Room Equipment | Buffet Price for 500 People | Flowchart of a Self Service | Kitchen Layout Dwg | Car Wash Project Template | Children's Biffe Project | How to Set Up a Serpentarium Project | Mattress Industry Plant | Reception of raw materials with women's clothing | Uniforms for Production | Garbage Bag Factory | Styrofoam Tray Making Machine | Coal Bagging Machines | Factory of Gc3b4ndolas2c Counters and Shelves with Capacity for 100 Units Per Day. | Buy Ways to Make Wire Fence Posts | Cosmetic Box Layout Templates | How to Assemble Aluminum Doors | How Much Does It Cost to Open Zimcage? | Pop for Prosthetics Laboratory | Yogurt Factory Equipment Quote | Good Practices Refrigerant | Bicycle Shop Business Model | How to Set Up an Operating Procedure | Pop Commercial Restaurant Model | Beauty Salon Operational Flowchart | How to Set Up a Funeral Home | How to Start a Van Rental Business | Virtual Office Floor Plan | Dry Car Wash Cart Manufacturers | Music Studio Business Plan | How to Set Up a Pig Farm | Example of Production Capacity of a Confectionery Store | How to make cookies | Coffee Production Flowchart | Açaí Industry Feasibility Study | Pepper Sauce Production | Pet Shop Construction Layout |

 

Other projects ready:

How to start Laundry for Hotels with services for 50 rooms per day.
Project Installations for Mushroom Cultivation (Champignon) with capacity for 1.000 Kg per day.
PDF Factory of Vegetables in Conserve (Corn in conserve, Peas in conserve, Potato in Conserve , Carrot in Conserve, Selected Legumes in Conserve) with 180m² (215,28 sq.yd.) and capacity of 2.000 kg/day.
Plant and layout Factory to Produce Manioc Flour, Sweet Starch (polvilho) and Sour Starch (produced with Manioc) with capacity for 25.000 Kg per day.
Project Factory to Produce in natura Potato with capacity for 10.000 Kg per day (Potato Washer).
Project Factory to Produce Cashew-nut Candy in Syrup, Durina Candy in Syrup and Mangaba Candy in Syrup, with an area of 180 m² (215,28 sq.yd.) and capacity for 2.000 kg/day.
FeasibilityFactory to Produce Paper Coffee Strainer with capacity for 100 boxes/day.
Business plant Industry Mineral Water Bottling with capacity for 16.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water.
Project Artisan Paper Workshop with an area of 500 m2.
How to start Laundry for Jeans (Stone Wash) with capacity to wash 5.000 Kg/day.

Project - how to start Factory to Produce Rum with capacity for 3.000 liters/day.