Ready project Factory to Produce Rum with capacity for 5.000 liters/day.
CODE - AGR-095
Ready project Factory to Produce Rum with capacity for 5.000 liters/day.
CODE - AGR-095Project ready with:
Industry with the following sections:Reception
Fermentation
Distillation
Bottling
Aging Process
Storage
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Rum
OPTIONAL SERVICES:
- Financial Feasibility Study of Factory to Produce Rum with capacity for 5.000 liters/day.
- Business plan for Factory to Produce Rum with capacity for 5.000 liters/day.
- 3D project of Factory to Produce Rum with capacity for 5.000 liters/day.
Projects with other capacities
Factory to Produce Rum
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Rum Flowchart | Rum Production Flowchart | Rum Flowchart | Rum Flowchart | Rum Flowchart | Rum Production Flowchart | F Rum Production Flowchart | Rum Flowchart | Plant That Makes Rum | Chicken Coop Construction Project | Open Candy Store | Cosmetic Industry Flowchart | Projects to Open a Computer Company | Oil Change 10 | Gas Station Accessibility Project DWG | Juice House Plants | Cleaning Supplies and Disposables Store How to Set Up | Models Shops Trimmings | Material for making Jelly5c | How to assemble a beverage storage tank | Financing for Rubble Recycling Plant | School Floor Plan Dwg | Butcher Shop | Construction Material Immediate Online Quote | Work Sets Up a Radiology Clinic | Dental Clinic Floor Plan with 2 Offices | How to Set Up an Industrial Kitchen for 1000 Meals a Day | Materials to Set Up a Movie Theater | Urban Spa Financial Project | Organizational Chart of a Gas Station Company | Nursing Home Project for the Elderly | What Do I Need to Set Up a Massage Clinic? | How to Open a Dental Office | What Basic Equipment Is Needed to Set Up a Marble Shop? | Example of a Printing Shop Business Plan | Underwear Factory How to Assemble | .soles for making flip-flops | Helmet Making Machine | Coconut Fiber Production | Floor Plan of Shopping Carioca | Pre-project Ready | Barbecue Block DWG | Drawing of the plan of a kiln used in pottery | Continuous Casting Flow Chart | How to Get a Loan to Open a Clinical Analysis Laboratory | Yogurt Lab | Laundry Layout | Motorcycle Workshop Equipment Quote | Skate Track Project Cad | Standard Operating Procedures - Pops in Pharmacies and Drugstores Model | Exhibition Park Dwg | How to Decorate a Sewing Studio | Loan for Fish Farming | Set up a transport logistics company | Micro lathes | What You Need to Set Up a Taxi Company | How to Build a Fertilizer Factory | Documents Required to Open a Soil Cement Factory | Cereal Bar Business Plan | Rice Processing Company | Capsaicin Production5d | Corn Flour Flowchart | How to Define an Organizational Chart for a Veterinary Clinic |
Other projects ready:
How to start Factory to Produce Baked and Frozen Cheese Bread, with an area of 260 m² and capacity for 3.000 kg/day.
Project Milk and Dairy Industry to be built in 2 phases: 1st phase: Fresh Cheese production (Ricota, Muzzarela, Minas Frescal), Matured Cheese (Prato, Minas Standard, Cobocó) and Parmesan, with 178 m2 (212,98 sq.yd.) area and capacity for 4000 liters/day. 2nd phase: Amplification to Produce Yoghurt and Milky Beverages, with 216 m2 (258,33 sq.yd.) of total area and capacity for 6000 liters/day.
PDF Industry Mineral Water Bottling with capacity for 3.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water with a machine to make PET Bottles.
Plant and layout Industrial Bakery to Produce French Bread with capacity for 100 Kg/day.
Project Factory for Condensed Milk production with capacity of 15.000 liters of milk per day.
Project Clothing Industry to Produce Knitwear and Sweatshirts with capacity for 300 garments/day.
FeasibilityFactory Improvement and Production of Mamona Oil with capacity for 5.000 liters/day.
Business plant Factory to Produce Manioc Flour, Sweet Starch (polvilho) and Sour Starch (produced with Manioc) with capacity for 8.000 Kg per day.
Project Factory to Produce Seasoning and Condiments with capacity for 10.000 Kg/day.
How to start Radiology Clinic and Dental Radiology with an area of 500 m2.



