Ready project Factory to Produce Soap Powder with capacity for 5.000 Kg/day.

CODE - CM-061

Ready project Factory to Produce Soap Powder with capacity for 5.000 Kg/day.

CODE - CM-061


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking of Raw Material
Stocking of Packages
Room to Mixture the Ingredients
Drying Room
Packing Room
Stocking of Finished Products
Stocking of Products in Observation
Office
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Soap Powder

How to start Factory to Produce Soap Powder with capacity for 5.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Soap Powder

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Layout Equipment Company Washing Powder | I Want to Set Up a Small Fabric Softener Industry | How to Set Up a Motorcycle Parts Sales and Service Store | Lubricant Distributor Business Plan | Roast Chicken - Sales | Setting Up a Different Fish Market | Air Conditioning Open Company | Clothing Store Layout Plan | How to Set Up a Water Tanker Business | Nursery Work Plan | Beef Slaughterhouse Ppra Model | How to Open a Chicken Distributorship | Kani Kani Flowchart | Cme Floor Plan | Step by Step to Set Up a PSF | Legislation for Ambulance Companies | Gyms | How to Set Up a Countryside Inn | Industrial Kitchen for School Lunch Equipment List | How to Set Up a Nightclub | Snack Bar Projects | Building Construction Schedule Template | Concrete Laboratory How to Assemble | Paint Industry Project Model | How to Set Up a Clothing Factory | I Need to Set Up a Textile Factory | How to Start Manufacturing with Pet | Styrofoam Block Manufacturing | Model of a Squeegee Factory | Matchstick Production Price5d | Small Mortar Factory Project | Cardboard Packaging Factory Project | Projects for Financing a Metalworking Shop | Vacuum Projects Minas Gerais | Wine Laboratory Equipment | How Much Does It Cost To Open A Grated Cheese Factory | E-books Good Pharmacy Practices | Open Borraxarria | Quail Egg Production Flowchart | Standard Operating Procedure for Internal Communication in Hospitals | Gas Tanks Projects | Setting Up a Barber Shop | Set up a Commercial Office | Accounting Office Plan for Two Accountants | Equipment Needed to Set Up a Fire Extinguisher Recharging Workshop | Managing a Road Freight Transportation Company | Investing in Pig Farm is Good | Pasta and Pizza Industry | Garlic Bread Supply | What Plant Did Rice Come From - Name Of The Plant | How to Assemble a Windmill | Juice Factory Layout | Pet Hotel Floor Plan |

 

Other projects ready:

How to start Cold Storage Room Shrimp Processing with an area of 300 m² (358,8 sq.yd) and capacity for 3.000 kg/day. Reception area for Living Shrimps.
Project Industry to Produce Liquid Soap, Liquid Body Soap, Liquid Detergent, Desinfectant, Carpet-Cleaner and Glass-Cleaner with capacity for 500 liters/day.
PDF Milk and Dairy Industry to Produce Ultrafiltration Brie Cheese with capacity for 100.000 liters of Milk per day.
Plant and layout Slaughterhouse Caprines with capacity to Slaughter 300 animals/day.
Project Factory to Produce Pepper Paste with capacity for 300 Kg/day.
Project Factory of Honey and Bee Wax Production with an area of 100 m² and capacity for 500 liters/day and others by-products (honey, propolis and bee wax).
FeasibilityFactory Improvement and Production of Mamona Oil with capacity for 10.000 liters/day.
Business plant Sterilization Unit (by Hydrogen Peroxide Plasma) with capacity for 200.000 Units per day.
Project Factory to Produce Pasteurized Liquid Egg (500 liters/day), Freeze-Dried and Freeze-Dried Powder Egg (100 Kg/day).
How to start Industry Mineral Water Bottling with capacity for 30.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water.

Project - how to start Factory to Produce Soap Powder with capacity for 5.000 Kg/day.