Ready project Factory to Produce Soap Powder with capacity for 5.000 Kg/day.

CODE - CM-061

Ready project Factory to Produce Soap Powder with capacity for 5.000 Kg/day.

CODE - CM-061


Project ready with:

Industry with the following sections:
Reception of Raw Material
Stocking of Raw Material
Stocking of Packages
Room to Mixture the Ingredients
Drying Room
Packing Room
Stocking of Finished Products
Stocking of Products in Observation
Office
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Produce Soap Powder

How to start Factory to Produce Soap Powder with capacity for 5.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Produce Soap Powder

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Layout Equipment Company Washing Powder | I Want to Set Up a Small Fabric Softener Industry | How to Set Up a Motorcycle Parts Sales and Service Store | Lubricant Distributor Business Plan | Roast Chicken - Sales | Setting Up a Different Fish Market | Air Conditioning Open Company | Clothing Store Layout Plan | How to Set Up a Water Tanker Business | Nursery Work Plan | Beef Slaughterhouse Ppra Model | How to Open a Chicken Distributorship | Kani Kani Flowchart | Cme Floor Plan | Step by Step to Set Up a PSF | Legislation for Ambulance Companies | Gyms | How to Set Up a Countryside Inn | Industrial Kitchen for School Lunch Equipment List | How to Set Up a Nightclub | Snack Bar Projects | Building Construction Schedule Template | Concrete Laboratory How to Assemble | Paint Industry Project Model | How to Set Up a Clothing Factory | I Need to Set Up a Textile Factory | How to Start Manufacturing with Pet | Styrofoam Block Manufacturing | Model of a Squeegee Factory | Matchstick Production Price5d | Small Mortar Factory Project | Cardboard Packaging Factory Project | Projects for Financing a Metalworking Shop | Vacuum Projects Minas Gerais | Wine Laboratory Equipment | How Much Does It Cost To Open A Grated Cheese Factory | E-books Good Pharmacy Practices | Open Borraxarria | Quail Egg Production Flowchart | Standard Operating Procedure for Internal Communication in Hospitals | Gas Tanks Projects | Setting Up a Barber Shop | Set up a Commercial Office | Accounting Office Plan for Two Accountants | Equipment Needed to Set Up a Fire Extinguisher Recharging Workshop | Managing a Road Freight Transportation Company | Investing in Pig Farm is Good | Pasta and Pizza Industry | Garlic Bread Supply | What Plant Did Rice Come From - Name Of The Plant | How to Assemble a Windmill | Juice Factory Layout | Pet Hotel Floor Plan |

 

Other projects ready:

How to start Clothing Industry to Produce Denim Blouse with capacity for 300 garments/day.
Project Wood Chips and Sawdust with capacity for 25 tons/day.
PDF Industrial Bakery to Produce Frozen French Bread with capacity for 300 Kg/day.
Plant and layout Factory for Soil Oil, with production capacity of 2.000 liters/day and 1200m² (1435,2 sq.yd.) area.
Project Factory Glass Recycling with capacity for 5.000 Kg/day.
Project Industry Mineral Water Bottling with capacity for 30.000 liters/hour, in flagons of 20 liters.
FeasibilityFactory to Produce Corn Flour with capacity for 8.000 Kg per day.
Business plant Factory to Produce Canned Vegetables (Canned Corn, Canned Pea, Canned Potato, Canned Carrot, Selection of Canned Vegetables) with capacity for 20.000 Kg per day.
Project Farm to Produce and Slaughter Broiler Chickens with: Farm and Slaughterhouse and capacity for 10.000 Chickens per day.
How to start Factory to Produce Synthetic Marble with Plastic Resin with capacity for 1.000 pieces per day.

Project - how to start Factory to Produce Soap Powder with capacity for 5.000 Kg/day.