Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Factory to Produce Soft Drink with capacity for 100.000 liters/day.
CODE - REFR-009
Ready project Factory to Produce Soft Drink with capacity for 100.000 liters/day.
CODE - REFR-009
Project ready with:
Industry with the following sections:
Flagons Reception, type PET 2 liters and Small
Flagons Cleaning
Syrup Production
Storage in different Flavors
Cooling
Mixture
Carbonation
Remove the ar
Bottling
Stocking
Expedition
Production of Cold
Office
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Soft Drink
OPTIONAL SERVICES:
Financial Feasibility Study of Factory to Produce Soft Drink with capacity for 100.000 liters/day.
Business plan for Factory to Produce Soft Drink with capacity for 100.000 liters/day.
3D project of Factory to Produce Soft Drink with capacity for 100.000 liters/day.
Projects with other capacities
Factory to Produce Soft Drink
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Project for financing of 100000
|
Soft Drink Factory Viability
|
Factory Project for the Production of Soft Drinks with a Production Capacity of 100,000 Liters Per Day.
|
Reception of 2-liter and small PET bottles
|
How Farm Chicken Is Made
|
Raising Rabbits in Concrete Cages
|
Industrial Soap Manufacturing Flowchart
|
List of Materials for Setting Up an Electrical Store
|
What is needed to open an oil change shop for vehicles?
|
How to Open an Agricultural Business
|
What You Need to Open a Fruit Business
|
Gas Reseller Store Model
|
How Much Does It Cost to Set Up a Jewelry Store?
|
Candy Factories Process
|
Non-Perishable Food Deposit
|
How to Open a Daycare What is the Price Per Child?
|
Project on How to Set Up a Computer School
|
Setting up a sausage factory
|
Refrigerator C3b4nica Plan
|
Initial Value for Opening a Radiology Clinic
|
Hospital Plans Dwg
|
Construction25c325a725c325a3o Of Motel
|
Swimming in Schools Project
|
How to Set Up a Kentinhas Supply Center
|
Gas Station Convenience Store Project
|
Snack Bar Business Plans
|
Suggestions for Building a Beauty Clinic
|
Feasibility for Diaper Production
|
Insecticide Manufacturers Address
|
Sock Factory
|
Plastic Injection Company Organization Chart
|
Work From Home Assembling Parts For Factories
|
Clothespin Factories to Assemble at Home
|
How Can I Set Up a Skateboard Factory?
|
Post Shape Molds
|
Paper Strainer Manufacturers
|
Electroplating Factory
|
Gas Tank Capacity 50 Cylinders
|
Floor Planslaboratory
|
Dairy Factory How to Set Up
|
Laundry for Pesticide Epi
|
Layout for Mechanical Workshop
|
How to Develop a Procedure for Your Company
|
Budget for Beauty Center
|
Facade of optical stores
|
How to Set Up a Condominium Management Company
|
Setting Up A Business
|
How to Maintain a Maintenance Workshop for the Pharmaceutical Industry
|
Towing Service Providers
|
Main Equipment in a Soft Drink Factory
|
Projects for setting up a pottery factory 2m tiles per day
|
Noodle Process Flowchart
|
Banana Factory Equipment Price
|
What Equipment is Necessary to Set Up a Natural Juice Factory
|
Other projects ready:
How to start Clothing Industry to Produce Embroidery with capacity for 200 garments/day.
Project Marble and Granite Factories to Produce Cutted and Polished Stones, Marble and Granite Pieces (Sink, Counter and by Placing an Order) and to Cut Marble and Granite Floors with capacity for 3 Blocks per Week.
PDF Rendering with capacity for 150 tons/day.
Plant and layout Milk and Dairy Industry to be built in 2 phases: 1st Phase: Milk Packing, with an area of 95 m2 and capacity for 4.000 liters/day. 2nd Phase: Milk Packing and Organic Cheese Factory to Produce Fresh Cheese, Yoghurt and Milky Beverages, with an area of 200 m2 and capacity for 8.000 liters/day.
Project Factory to Produce Fresh Dough for Pizza, setting up for Pizza (Filled and Frozen) and Dough for Pastry with capacity for 20.000 Kg/day.
Project Slaughterhouse to Sluaghter Bovines and Swines and Cold Meat Production (Sausages, Hams, Cold Meat and Cured Food) and Charque - 1.000 animals/day.
FeasibilityFactory to Produce Cotton Yarn Bandage (not Sterilized) with capacity for 100.000 bandages per day.
Business plant Tanning Fish Skin with capacity to Produce 10.000 skins per day.
Project Factory to Produce Cold Meat (with Deboned Meat Reception) with capacity for 5.000 Kg/day.
How to start Slaughterhouse Ovines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 125 animals/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US