Ready project Factory to Produce Soft Drink with capacity for 20.000 liters/day.
CODE - REFR-004
Ready project Factory to Produce Soft Drink with capacity for 20.000 liters/day.
CODE - REFR-004Project ready with:
Industry with the following sections:Flagons Reception, type PET 2 liters and Small
Flagons Cleaning
Syrup Production
Storage in different Flavors
Cooling
Mixture
Carbonation
Remove the ar
Bottling
Stocking
Expedition
Production of Cold
Office
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Soft Drink
OPTIONAL SERVICES:
- Financial Feasibility Study of Factory to Produce Soft Drink with capacity for 20.000 liters/day.
- Business plan for Factory to Produce Soft Drink with capacity for 20.000 liters/day.
- 3D project of Factory to Produce Soft Drink with capacity for 20.000 liters/day.
Projects with other capacities
Factory to Produce Soft Drink
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Soft Drink Production Annex Template | Apacam Honey and Wax Warehouse Model Floor Plan | Beef Cattle Confinement English | Ind Lipsticks | Auto Parts Store Facade | Open Fishing Supplies Store | Open a Bank Agency | How to Set Up a Retail Candy Store | How to Set Up a Menswear Store | Peanut Paçoca Industry | Ready Work How to Open a Drugstore Business Model | Floor Plan of a Music School Project | How Much Does Chicken Industry Cost | Meat House Projects | How to Manage a Soccer Court | How to Open a Surgery Center | Physiotherapy Project | Gym Equipment Bndes5d | Beer Industry Project | Draw Gym Floor Plan | Bowling Alley Assembly Prices | Car Wash Floor Plan | Hotel Projects for the Elderly | What Materials Are Used to Set Up a Laboratory for Mineral Water Analysis? | .fireworks factory project | How to Set Up a Knitting Shop | Clothing Factory Floor Plan | Selling Machine for Producing Disposable Cups | Recycling Industry Floor Plan | Wood Treatment Autoclave Manufacturers | How to Set Up a Factory to Produce Concrete Blocks and Perforated Bricks | Solar Heater Project In Dwg | Paper Cup Industry in Brazil | How to Set Up an Iron Shop | Microbiology Layout | Dairy Building Plant | Motar Buggy Factory | Popular House with 1 Bedroom and 1 Suite | Standard Operating Program Form | Standard Operating Procedure for Glassware Washing | Cost To Open A Bus Company | Organizational Chart of a Company with 100 Employees | Menu Making | Set Up a School Bus | Layout or Physical Arrangement of Ice Cream Industry | Ready Pastry Supplier | Sand Extraction Project | How to Make Frozen Potatoes | Sunflower Oil Producers in Brazil | Pet Cemetery Project |
Other projects ready:
How to start Installations for Mushroom Cultivation (Champignon) with capacity for 5.000 Kg per day.
Project Factory to Produce Artificial Candles with capacity for 100 Kg/day.
PDF Industry to Produce Soap Powder Pressed in a Bar with capacity for 1.000 Kg/day.
Plant and layout Slaughterhouse Caprines with capacity to Slaughter 700 animals/day.
Project Milk and Dairy Industry to be built in 2 phases: 1st Phase: Organic Cheese Factory to Produce Fresh Cheese (Ricota, Muzzarela, Minas Frescal), Matured Cheese (Prato, Minas Standard, Cobocó) and Parmesan Cheese, with an area of 178 m2 and capacity for 4.000 liters/day. 2nd Phase: Amplification to Produce Yoghurt and Milky Beverages, with total area of 216 m2 and capacity for 6.000 liters/day.
Project Confectionery with capacity for 3.000 Kg/day.
FeasibilityMarble and Granite Factories to Produce Cutted and Polished Stones and to Cut Marble and Granite Floors with capacity for 8 Blocks per Week.
Business plant Factory to put Cachaça (Liquor) in bottles, with capacity for 2.000 liters/day.
Project Factory to Produce Powder Soup with capacity for 1.000 Kg/day.
How to start Industrial Kitchen with Restaurant with capacity for 300 meals per day.



