Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Factory to Produce Sparkling Wine, with capacity for 80.000 liters/year.
CODE - UV-021
Ready project Factory to Produce Sparkling Wine, with capacity for 80.000 liters/year.
CODE - UV-021
Project ready with:
Industry with the following sections:
Grape Reception
Fermentation
Maturation
Bottling
Stocking
Storage
Expedition
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Sparkling Wine
OPTIONAL SERVICES:
Financial Feasibility Study of Factory to Produce Sparkling Wine, with capacity for 80.000 liters/year.
Business plan for Factory to Produce Sparkling Wine, with capacity for 80.000 liters/year.
3D project of Factory to Produce Sparkling Wine, with capacity for 80.000 liters/year.
Projects with other capacities
Factory to Produce Sparkling Wine
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Wine Production Layout
|
What Are The Main Features For Soap Production?
|
How to Set Up a Religious Products Store
|
How to Set Up a Castrol Oil Change Shop
|
How to Make a Warehouse Layout Model
|
Flowchart of a Model Snack Bar
|
Virtual Rental Company How to Set One Up
|
Clothing Alteration Price Chart
|
Foot of the Foot Jelly Industries
|
What It Takes to Set Up a Beverage Distributorship
|
Model Rubber Plant
|
What You Need to Set Up a Technical School
|
Ugue Steel Floor Plan
|
How to Build a Swine and Beef Cold Storage Facility
|
Nursing Clinic Material
|
Make Radiology Office Plans
|
New Dental Clinic Projects
|
Project to Build a Hotel
|
How Much Does It Cost to Set Up a 3D Cinema
|
Beach Camping Layout Model
|
Financing Credit for Construction of Gas Station
|
Motar Choperia
|
Plan for Construction of Beauty Room
|
Pillow Production
|
The Raw Material of Toilet Paper
|
Raw Material for Making Dolls
|
How to Set Up a Small Linen Factory
|
Sandal Making Machines
|
Sole Injection
|
Popsicle Stick Plant
|
Set up a model airplane factory
|
Pre Slab Project
|
Complete Paper on Business Plan-Window Protection Network
|
Project to Manufacture Ecological Bricks
|
Ready-made Business Plan for a Signage Company
|
Clinical Analysis Laboratory Assembly Project
|
Yogurt Production Process Layout
|
Rules for Setting Up a Hotel Laundry
|
Jsp Auto Mechanics Project Template
|
Cities in Brazil with Less Than 5,000 Inhabitants
|
Pop, Collection Program Template
|
Ready Project for Vaquejada Track
|
Sewing Workshop Floor Plan
|
How to Open a Detoxification Company
|
Insurance Broker Plant
|
How to Assemble a Bicycle Projects
|
Cleaning Company Name Idea
|
Limestone Industry Model
|
Concrete Tile Manufacturing Companies
|
How to Set Up a Shell Factory
|
What is each ingredient used for in the production of concentrated juice?
|
How to Make Shitaki
|
Yeast Factories Brazil
|
Veterinary Office Floor Plan
|
Other projects ready:
How to start Factory to Produce Mayonnaise with capacity for 10.000 Kg per day.
Project Pen for Separation and Fattening of Beef Cattles in a Confinement Regime for 50 animals and area of 750 m².
PDF Factory to Produce Cold Meat, Charque Dried Salted Meat and Jerked Beef (with Carcass Reception) with capacity for 3.000 Kg/day.
Plant and layout Chinese Kitchen with capacity for 300 meals per day.
Project Cold Storage Room to Produce Frozen and Threaded Fishes and Fish Products with capacity for 1.000 Kg/day.
Project Factory to Produce Physiologic Serum with capacity for 1.000 liters/day.
FeasibilityFactory to Produce Mattress with capacity for 1.000 mattress per day.
Business plant Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Packed Milk types B and C, with capacity of 3000 liters/day.
Project Industry Mineral Water Bottling with capacity for 3.000 liters/hour, in flagons of 10 and 20 liters, bottles of 1 and 2 liters, plastic cups and sparkling water.
How to start Factory to Produce Banana Raisin with capacity for 20.000 Kg/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US