Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Factory to Produce Unwoven Chicken with capacity for 5.000 Kg/day.
CODE - FRIG-153
Ready project Factory to Produce Unwoven Chicken with capacity for 5.000 Kg/day.
CODE - FRIG-153
Project ready with:
Industry with the following sections:
Reception Platform for Carcass
Freezing Chamber for Carcass
Cold Chamber for Carcass
Deboning Room
Production Room
Mass Chamber
Storage for Condiments
Packing Room
Storage for Packages
Cold Chamber for Packed Products
Expedition
Expedition Platform
Room for Bones
Office
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Factory to Produce Unwoven Chicken
OPTIONAL SERVICES:
Financial Feasibility Study of Factory to Produce Unwoven Chicken with capacity for 5.000 Kg/day.
Business plan for Factory to Produce Unwoven Chicken with capacity for 5.000 Kg/day.
3D project of Factory to Produce Unwoven Chicken with capacity for 5.000 Kg/day.
Projects with other capacities
Factory to Produce Unwoven Chicken
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Shredded Chicken Production
|
Shredded Chicken Company
|
Shredded Chicken Production
|
Milking Parlor Shed Plans
|
I want to install a photo development shop
|
I would like to open a store to sell tires
|
Plant P Rotisserie
|
Starting a Business with Plaster
|
I Want to Open a Fabric Store
|
400m2b2 Floor Plan
|
How to Set Up a Food Basket Business
|
Flowchart of a Driving School
|
Location Plan Ready Project Dwg
|
Tilapia Refrigeration Equipment
|
Gym Floor Plan In Dwg
|
Health Clinic Layout Design Template
|
Healthcare Company Setup Template
|
Emergency Room Project Templates
|
Design Buffet
|
Inn Floor Plan Models
|
Industrial Kitchen Food Flow
|
How to Make a Night House Spreadsheet
|
Layout Basics for Lava-rapidos Sga
|
Children's Buffet Facade Models
|
How to Set Up a Hearing Aid Factory
|
What Equipment Do You Need to Set Up a Mattress Factory?
|
Uniform Manufacturing Layout
|
How to Set Up a Nonwoven Bag Business
|
Make Styrofoam Tray
|
Raw Material for School Chair
|
Used Wood Framing Machinery
|
Alanbrado Construction Project
|
Material for Making Kites
|
Aluminum Squarry Model
|
Zinc Plating Factory How to Assemble
|
Setting Up a Prosthetics Laboratory
|
Yogurt Packaging Factory
|
How to Prepare a Good Practices Manual for Pest Control
|
How to Set Up an Armoring Company
|
Standard Operating Procedure for Dairy
|
Basic Template for Pop in Restaurant
|
Handmade Paper Business
|
Services for the Elderly Entertainment
|
I Want to Set Up a Fundraising Company
|
How to Set Up a Representation
|
Cleaning Company Consulting
|
Business Plan for Alignment and Balancing
|
Pig Farming Plant Constructions
|
What Machines Are Needed to Open a Sweets and Pies Shop?
|
In Which Countries Is Cream Cracker Sold?
|
How to Open a Brazil Nut
|
Fruit Processing Unit
|
Pepper Factory
|
Pet Shop Empreendend
|
Other projects ready:
How to start Factory to Produce Mayonnaise with capacity for 500 Kg per day.
Project Factory to Produce Injected Plastic with capacity for 15.000 Kg/day.
PDF Factory to Produce Pasteurized Orange Juice with capacity for 10.000 liters per day.
Plant and layout Factory to Produce Wine and Sparkling Wine, with capacity for 500.000 liters/year.
Project Factory for Fresh Cheese production (Muzzarela, Ricota, Minas Frescal), with capacity of 3000 liters per day.
Project Marble and Granite Factories to Produce Cutted and Polished Stones and Marble and Granite Pieces (Sink, Counter and by Placing an Order) with capacity for 8 Blocks per Week.
FeasibilityClothing Industry to Produce Shorts with Laundry Sector (Stone Wash) with capacity for 300 garments/day.
Business plant Factory to Produce Toasted Cashew Nut with capacity for 3.000 Kg per day.
Project Apiary with 30 BeeBeehive (Disposal and Assemblies of BeeBeehive Boxes).
How to start Clothing Industry to Produce Cloth Dolls with capacity for 300 units/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US