Ready project Factory to Recycle Plastic with capacity for 5.000 Kg/day.

CODE - EFL-018

Ready project Factory to Recycle Plastic with capacity for 5.000 Kg/day.

CODE - EFL-018


Project ready with:

Project with the following sections:
Plastic Reception
Selection
Separation
Storage
Office
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Recycle Plastic

How to start Factory to Recycle Plastic with capacity for 5.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Recycle Plastic

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Bndes Project Form | Ready-Made Financial Plan for Paper Recycling | How to Set Up a Plastic Recycling Company | Bndes Recycling Project Form | Plastic Recycling Industry Investment | Bndes Plastic Recycling | Recycling Scheme With Names | I Need a Name for a Plastics Company | Quails - How to Breed | Homemade Chocolate Model | Soap Industry Auto Layout | *Musical Instrument Store Projects* | How to Set Up an Oil Exchange | Cost to Open a Tobacco Shop | Starting a Pie Business | Projects for Setting Up a Household Goods Store | Bride Rental Store Project | Gelatin Manufacturing Flowchart | Distribution Depot Models | Process Tires for Use on Asphalt | Start Technical School | Butcher Shop Floor Plan Template | Cattle Slaughter Flowchart Template | Equipment Needed to Set Up an Outpatient Clinic in a Company | How to Make an X-ray Clinic Plan | Budget for Setting Up a Dental Polyclinic Dental | Hotel Financial Plan Template or Example | Movie Theater Plate | Legislation for Setting Up a Campsite | Gasoline Pump In Dwg | Managing a Brewery | Assemble Male Aesthetics | Gauze Factory | Consultancy for Setting Up a Toilet Paper Factory | Clothing Production Layout | Name for underwear factory | Raw Material for Assembling Flip Flops | CD and DVD Case Factory | Popsicle Stick Industry | Model Aircraft Production | Lage Factory Machinery | Clocks to assemble under 2.00 | Ecological Brick Factories Layout | Metal Galvanization | Financing for Clinical Analysis Laboratory | Dairy Industry Business Plan | Industrial Laundry Equipment Listing | Motorcycle Workshop Projects | Industrial Cleaning Pop | Animal Exhibition Park Plan | Studio Floor Plan | Models About Reforestation | How to Set Up a Real Estate Office Layout | Bicycle Shop Workshop Template | Was Installation Work Plan | Feed Factory Facade | Roof of a Cosmetics Factory | Set Up Cake Industry | Mini Cafeteria Floor Plan | Condiment and Seasoning Factory | Pre-cooked cassava in the interior of SP | Veterinary Clinic Project |

 

Other projects ready:

How to start Rice Mill to Produce Rice Starch with capacity for 13.000 Kg/day.
Project Factory to Produce Ready Frozen Raw Savory Pastries (Salgadinhos) (Coxinha, Pasty, Esfiha, Kibe, Hamburger) with capacity for 3.000 Kg/day.
PDF Industrial Kitchen with Restaurant with capacity for 400 meals per day.
Plant and layout Cachaça (Liquor) and Brandy Bi-Distillary, with capacity of production for 15.000 liters/day.
Project Factory for Fresh Cheese production (Muzzarela, Ricota, Minas Fresca) and Matured Cheese (Prato, Minas Standard, Cobocó), with capacity of 3000 liters per day.
Project Factory to Produce Barbecue Spit with capacity for 300 Kg/day.
FeasibilityClothing Industry to Produce Cloth Dolls with capacity for 50 units/day.
Business plant Milk and Dairy Industry to Produce Milk Powder and UHT Milk with capacity for Reception of 10.000 liters/day.
Project Salon for Feet Treatment with capacity for 50 people.
How to start Factory to Produce Powder Egg with capacity for 500 Kg/day.

Project - how to start Factory to Recycle Plastic with capacity for 5.000 Kg/day.