Ready project Factory to Recycle Plastic with capacity for 7.000 Kg/day.

CODE - EFL-019

Ready project Factory to Recycle Plastic with capacity for 7.000 Kg/day.

CODE - EFL-019


Project ready with:

Project with the following sections:
Plastic Reception
Selection
Separation
Storage
Office
Canteen
Dressing Room

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Factory to Recycle Plastic

How to start Factory to Recycle Plastic with capacity for 7.000 Kg/day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Factory to Recycle Plastic

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Recycling Business Plan | Set up a Plastic Recycling Factory | Plastic Recycling Business Plan | Plastic Recycling Industry Business Plan | Business Plan for Opening a Recycling Company Model | Plastic Recycling Company Business Plan | Plastic Business Plan Example | Business Plan for Setting Up a Plastic Recycling Industry | Plastic Factory Business Plan | Plastic Recycling Business Plan | Plastic Recycling Company Business Plan | Plastics Business Plan | Mini Market Floor Plan In 3D | China Aero Models Store | What Do I Need to Open a Medical Supplies Store? | Setting Up A Dairy Store In SP | Self Service Equipment to Assemble | Examples of Flowcharts for a Glass Shop | .machines for making lingerie | How to Set Up a Surgical Supplies Distributor | Set up frozen food factory | How Much Do I Need to Start a 100m2 Project? | Sheep Slaughter Flowchart | 500m2 House Plan | Multi-Sports Court Construction Project Model | List of Necessary Materials for Medical Clinic | Ubs Mg | Nursing Clinic Assembly Project | How to Build a Cafeteria Facade | Minimarket Plant | Seafood Restaurant Business Plan | Organize Small Nightclub | Car Wash Project | Event Center Design for 500 People | Beekeeping Partnership Bnds | Blueprint Stamp Templates for DWG | Economic Viability Plan for a Mineral Water Industry | How to Set Up a Polo Shirt Factory | Broom Factory Layout | How to Build a Sofa | Antique Furniture Pocos De Caldas | Vegetable cards | Flowchart of an Asphalt Plant | Tray Making Machine | How to Set Up a Hardware Manufacturing Business | Aluminum Hot Factory | Set up a Materials Engineering Laboratory | Cheese Factory Budget | How Long Does It Take To Set Up A Water Factory? | Business Plan Parking5b | Pop Model - Standard Operating Procedure | Standardized Operating Process for Business | Hair Salon Layout | Organic Gardens in Greenhouses | Vehicle Tracking Business Plan | How to Create an Organizational Chart for a Consulting Company | Layout of a Maintenance Company | How to Plan a Film Studio | Popsicle Factory Legislation | Ingredients for Industrial Pasta | Hot Dog Company Project | How to Set Up a Cashew Processing Plant | Frozen Pulp Packaging | Ketchup Production | A Pet Shop Plant |

 

Other projects ready:

How to start Industry of Ice Production in bars and grated with capacity for 2.000 Kg/day.
Project Factory to Produce Pastry Dough with capacity for 15.000 kg/day.
PDF Slaughterhouse Cold Meat and Crackling (Torresmo) Production, with an area of 150 m2, and capacity for 2000 kg/day (with Carcass Reception).
Plant and layout Shed to Cut Glass with capacity to Produce 300 m2/day.
Project Factory to Produce Ketchup with capacity for 20.000 Kg per day.
Project Slaughterhouse Ostrich Slaughter and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) with capacity to Slaughter 200 animals/day.
FeasibilityFactory to Produce Cupuaçu Pulp with capacity for 1.000 Kg per day.
Business plant Clothing Industry to Produce Women's Clothing (Party Clothes) with capacity for 1.000 garments/day.
Project Factory to put Cachaça (Liquor) in bottles, with capacity for 15.000 liters/day.
How to start Footwear Industry to Produce Sneakers with capacity for 500 pairs/day.

Project - how to start Factory to Recycle Plastic with capacity for 7.000 Kg/day.