Ready project Fiambre Factory with an area of 200 m2.

CODE - FRIG-122

Ready project Fiambre Factory with an area of 200 m2.

CODE - FRIG-122


Project ready with:


Industry with the following sections:

Reception Platform for Carcass
Freezing Chamber for Carcass
Cold Chamber for Carcass
Deboning Room
Production Room
Mass Chamber
Storage for Condiments
Packing Room
Storage for Packages
Cold Chamber for Packed Products
Expedition
Expedition Platform
Room for Bones
Office
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Fiambre Factory

How to start Fiambre Factory with an area of 200 m2. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Fiambre Factory

To learn more contact us by whatsapp:

WhatsApp +5531996091982

 

 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Build a Storage Tank with Sif | How to Make Ham | Cream Industry Machine Price | How to Decorate an Esoteric Store | Car Rental How to Set Up | Set Up Beautiful Used Car Shop | Initial Budget for a Natural Products Store | Shoe Store Business Plan Layout | How to Set Up a Tannery | Setting up a Pharmacy | Plants Used in Equestrian Tracks | Rabbit Slaughtering Cold Storage in Brasilia | Salami Factory Floor Plans | Fluxoframa Football Stadiums | Surgical Center Assembly Disassembly | Bndes Clinic Financing | Intensive Care Unit Plant | Organizational Chart of a Steakhouse Company | Floor Plan of a Market | Business Plan for a Rental Block | Bowling Plants | Car Wash Equipment Suppliers | Dance Club Silver | Raw Material For Toothbrush | How to Design an Educational Toy | Production Flowchart of a Lingerie Company | Bag and Accessories Factory Layout | PVC Consulting | How to Set Up a Plastic Wood Factory | Furniture Factory Project | Block Factory Business Plan | What It Takes to Start a Concrete Company | How to Build an Industry with Boxes | Aluminum Cookware Manufacturing Process | Screen Machine Project | Dental Prosthesis Laboratory Business Plan Template | Dairy Project Model | Ice Factory Production Flowchart | How I Opened an Automotive Battery Factory | Operational Procedures Maintenance | Pop Standard Operating Procedure Template | Layout of a Telemarketing Center | Nursery Floor Plan Templates | Wireless Provider Organization Chart | Loan Flyer Template | Refrigeration Workshop Layout | Description of a finished painting project | Ice Cream Shop Floor Plan Template Ice Cream Industry | Ready-made Chilled Cheese Bread Dough | How to Create a Wine Flowchart | Onion Factory | Guarana Syrup Machine Factory | I Want to Set Up a Soybean Oil Factory | How to Open a Cemetery |

 

Other projects ready:

How to start Slaughterhouse Ovines Slaughter, Cold Meat Production (Sausages, Hams, Cold Meat, Smoked Products) and Charque Processing with capacity to Slaughter 5 animals/day.
Project Factory to Produce Paprika (grounded red) with capacity for 300 Kg/day.
PDF Radiology Clinic and Dental Radiology with an area of 150 m2.
Plant and layout Factory to Produce Teas with capacity for 1.000 liters/day, Packed on Plastic Cup and PET Bottles.
Project Industry to Produce Mass Base for Soap with capacity for 10.000 Kg/day.
Project Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Sweet Milk, with capacity of 1000 liters/day.
FeasibilityProjeto de Frigorífico para Abate de Bovinos (Abate pelo Método Kosher) with capacity for 1.800 animais por day.
Business plant Factory to Produce Ice Lolly Stick, Ice Cream Spade, Toothpick, Barbecue Spit and Clothes Peg with capacity for 5.000 Kg/day.
Project Smoker with capacity to produce 500 Kg/day.
How to start Milk and Dairy Industry to Produce Milk Powder and UHT Milk with capacity for Reception of 15.000 liters/day.

Project - how to start Fiambre Factory with an area of 200 m2.