Ready project Fiambre Factory with an area of 200 m2.

CODE - FRIG-122

Ready project Fiambre Factory with an area of 200 m2.

CODE - FRIG-122


Project ready with:


Industry with the following sections:

Reception Platform for Carcass
Freezing Chamber for Carcass
Cold Chamber for Carcass
Deboning Room
Production Room
Mass Chamber
Storage for Condiments
Packing Room
Storage for Packages
Cold Chamber for Packed Products
Expedition
Expedition Platform
Room for Bones
Office
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Fiambre Factory

How to start Fiambre Factory with an area of 200 m2. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Fiambre Factory

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

How to Build a Storage Tank with Sif | How to Make Ham | Cream Industry Machine Price | How to Decorate an Esoteric Store | Car Rental How to Set Up | Set Up Beautiful Used Car Shop | Initial Budget for a Natural Products Store | Shoe Store Business Plan Layout | How to Set Up a Tannery | Setting up a Pharmacy | Plants Used in Equestrian Tracks | Rabbit Slaughtering Cold Storage in Brasilia | Salami Factory Floor Plans | Fluxoframa Football Stadiums | Surgical Center Assembly Disassembly | Bndes Clinic Financing | Intensive Care Unit Plant | Organizational Chart of a Steakhouse Company | Floor Plan of a Market | Business Plan for a Rental Block | Bowling Plants | Car Wash Equipment Suppliers | Dance Club Silver | Raw Material For Toothbrush | How to Design an Educational Toy | Production Flowchart of a Lingerie Company | Bag and Accessories Factory Layout | PVC Consulting | How to Set Up a Plastic Wood Factory | Furniture Factory Project | Block Factory Business Plan | What It Takes to Start a Concrete Company | How to Build an Industry with Boxes | Aluminum Cookware Manufacturing Process | Screen Machine Project | Dental Prosthesis Laboratory Business Plan Template | Dairy Project Model | Ice Factory Production Flowchart | How I Opened an Automotive Battery Factory | Operational Procedures Maintenance | Pop Standard Operating Procedure Template | Layout of a Telemarketing Center | Nursery Floor Plan Templates | Wireless Provider Organization Chart | Loan Flyer Template | Refrigeration Workshop Layout | Description of a finished painting project | Ice Cream Shop Floor Plan Template Ice Cream Industry | Ready-made Chilled Cheese Bread Dough | How to Create a Wine Flowchart | Onion Factory | Guarana Syrup Machine Factory | I Want to Set Up a Soybean Oil Factory | How to Open a Cemetery |

 

Other projects ready:

How to start Industry to Produce Soap with capacity for 10.000 Kg/day.
Project Exhibition Park for Cities with until 30.000 inhabitants.
PDF Slaughterhouse for Swine - 150 animals/day - area of 1.200 m² (1435,2 sq.yd).
Plant and layout Slaughterhouse Ostrich Slaughter with capacity for 600 animals/day.
Project Factory to Produce Powder Cheese Bread with capacity for 300 Kg/day.
Project Factory to Produce Mattress with capacity for 500 mattress per day.
FeasibilityFactory to Produce Raisins Cashew Nuts, Cashew Syrup, Crystallized Cashew, Cashew Jelly and Toasted Cashew Nut with capacity for 500 Kg per day.
Business plant Factory to Produce Mate Tea and other Teas, Bottled in Cups with capacity for 1.000 liters per day.
Project Factory to Produce Pasteurized Liquid Egg (1.000 liters/day), Freeze-Dried and Freeze-Dried Powder Egg (300 Kg/day).
How to start Industry to Produce Bleach with capacity for 20.000 liters/day.

Project - how to start Fiambre Factory with an area of 200 m2.