Ready project Frog Meat Processing with capacity for 1.000 frogs per day.

CODE - FRIG-213

Ready project Frog Meat Processing with capacity for 1.000 frogs per day.

CODE - FRIG-213


Project ready with:


Industry with the following sections:

Reception Platform
Cold Chamber
Manipulation Room
Sala de Packages
Storage for Packages
Cold Chamber for Finished Products
Expedition
Office
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Frog Meat Processing

How to start Frog Meat Processing with capacity for 1.000 frogs per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Frog Meat Processing

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Frog Processing | Raising 500 Chickens | How Much Does a Cattle Shed Cost? | Depilatory Wax Factory Equipment | How to Mount Hardware and Building Materials | How to Set Up an Electrical Wire Industry | Perfumery Project | Business Plan for Dietary Supplements | How to Set Up a Craft Supplies Store | Drawing Floor Plan Of A Clothing Store | What Machinery is Needed to Set Up a Cocada Factory? | Pdf Blueprint Of A Compounding Pharmacy | Business Plan for Opening a Recycling Company Model | Setting Up a School Consultancy | Smoking Chamber Diagram | Cost to Assemble Synthetic Football Field | How to Set Up a Dental Radiology Center | Design for a Physiotherapy Room | Restaurant Kitchen Floor Plan Template | Lottery Facade | Residential Project Model In Cad | Dial Pizza How to Assemble | 200m2 House Plan Models | Construction of horse stalls | Business Plan - Minas Gerais Restaurant | Plant Company Maintenance Fire Extinguishers | Object Names In English For Office | With 200 thousand you can set up a bikini company | How to Make a Shoe Company Layout | Disposable Gloves Production | Tips for Setting Up a Timber Business | Sketch of Block Manufacturing Factory | Solar Panel Construction Plan | Cages Manufacturing and Material | How to Set Up a Pathological Anatomy Laboratory | How to Make Dairy Mozzarella Cheese | Body Shop Model | Church Plant Projects | Standard Operating Manual Template | Financial Procedure | Crepe Equipment | Equipment List Travel Agency | How to Set Up a Construction Company | Bnds 2f Crafts | How to Set Up an Electrical Company | Extruded Feed Making Machine | How to Open a Ceramics Industry | Frozen Bread Suppliers | Breakfast Cereal Factory | What Do I Need to Make Garlic Paste? | Setting up a Banana Industry |

 

Other projects ready:

How to start Laundry for Hotels with services for 500 rooms per day.
Project Factory to Produce Fodder for Sharks with capacity for 500 Kg/day.
PDF Factory to Produce Premolded Rock Soil with capacity for 5.000 m2/day.
Plant and layout Milk and Dairy Industry for Packed Milk production types B and C, with capacity of 3000 liters/day.
Project Clothing Industry to Produce Knitwear with Dyeing Sector with capacity for 100 garments/day.
Project Factory to Produce Chocolate Powder with capacity for 1.000 Kg/day.
FeasibilityFlower Shop with an area of 100 m2.
Business plant Factory to Produce Distilled from Honey, with capacity for 100 liters/day.
Project Pastry Shop with an area of 300 m2.
How to start Tannery for Wet Blue until Finishing Plant, with capacity for 50 leathers/day.

Project - how to start Frog Meat Processing with capacity for 1.000 frogs per day.