Ready project Frog Meat Processing with capacity for 500 frogs per day.

CODE - FRIG-212

Ready project Frog Meat Processing with capacity for 500 frogs per day.

CODE - FRIG-212


Project ready with:


Industry with the following sections:

Reception Platform
Cold Chamber
Manipulation Room
Sala de Packages
Storage for Packages
Cold Chamber for Finished Products
Expedition
Office
Canteen

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Frog Meat Processing

How to start Frog Meat Processing with capacity for 500 frogs per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Frog Meat Processing

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Frog Meat Processing | Frog Processing | How to Make a Physical Plan Template | How to Set Up a Beef Cattle Fattening Facility | Shampoo Factory Project Template | How to Set Up a Sporting Goods Store | Car Rental Business Plan | Used Car Resale Project | How to Start Selling Chocolate | Jewelry Store Layout | Chicken Foot Tannery Plant | Plant Drugstore | How to Make a Music School | Turkey slaughter | Economic Viability of Meat Boutique | Dwg Grandstand | What Equipment is Needed to Set Up a Surgical Center? | How to Set Up a Project for a Physiotherapy Clinic | Project to Open a UTI | Motel Drawing Dwg Format | Supremecado Project | I Want to Open a Squash Court | Investment2c .cost Of Bowling Business | Sample Projects for Car Washes | I want to open a hot meal distribution company | Dental Pen Projects | Vegetable Bushing Factory | Women's Clothing Faction | Souvenirs for newborns | Companies That Manufacture Suction Cups | Wooden Assembly Models | Manufacturing with MDF | Investment to Open a Block Factory | Concrete Plant Layout | Setting Up a Cardboard Box Business | Cookware Factory Plants | Balcony Covers2c Jardins | Floor Plan for Dental Prosthetics Laboratory | P2f FinancingMilk Production | What is needed to set up a bar ice factory? | Machinery for Automotive Battery Manufacturing | Cosmetic Pop Examples | Clinical Analysis Laboratory Pop | Project to Set Up a Software Consulting Company | Project for Construction of a Forest Nursery | How to Set Up a Container Rental Company | Express Graphics Project Feasibility | Mount a Tachograph | Ice Cream Shop Floor Plans | How to Finance a Bndes Pizzeria | Wine Making Equipment | DWG Stretcher Design | Tofu Production | What You Need to Open a Cemetery |

 

Other projects ready:

How to start Milk and Dairy Industry for Packed Milk production types B and C, with capacity of 1000 liters/day.
Project Slaughterhouse for bovines slaughter and Charque - 125 animals/day - area of 1.300 m² (1554,8 sq.yd).
PDF Slaughterhouse Quail with capacity for 10.000 animals per day.
Plant and layout Clothing Industry to Produce Female Tencel Jeans Pants with capacity for 500 garments/day.
Project Factory to Produce Ice Lolly Stick with capacity for 100 Kg/day.
Project Industry to Produce Shampoo, Hair Conditioner, Hand and Body Creams, Suntan Lotion with capacity for 10.000 Kg/day.
FeasibilityFactory to Process Grated Coconut, Coconut Water and Coconut Milk (Dwarf Coconut), with capacity for 3.000 kg per day and area of 375 m².
Business plant Leather Tannery (just until Wet Blue) with capacity to Produce 500 leathers/day.
Project Industrial Laundry with capacity for 3.000 kg of Clothes per day.
How to start Factory to Produce Soy Milk with capacity for 10.000 liters per day.

Project - how to start Frog Meat Processing with capacity for 500 frogs per day.