Plan Nimis
Telephone 31996091982 | Whatsapp +55.31996091982 | Talk to us |
Home
Ready project Frog Meat Processing with capacity for 500 frogs per day.
CODE - FRIG-212
Ready project Frog Meat Processing with capacity for 500 frogs per day.
CODE - FRIG-212
Project ready with:
Industry with the following sections:
Reception Platform
Cold Chamber
Manipulation Room
Sala de Packages
Storage for Packages
Cold Chamber for Finished Products
Expedition
Office
Canteen
The ready project (eBook) contains:
1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Frog Meat Processing
OPTIONAL SERVICES:
Financial Feasibility Study of Frog Meat Processing with capacity for 500 frogs per day.
Business plan for Frog Meat Processing with capacity for 500 frogs per day.
3D project of Frog Meat Processing with capacity for 500 frogs per day.
Projects with other capacities
Frog Meat Processing
To learn more fill out the form:
Name:
WhatsApp:
Telephone:
City:
Address:
Postal Codel:
Country:
Email:
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Frog Processing
|
Frog Meat Processing
|
How to Make a Physical Plan Template
|
How to Set Up a Beef Cattle Fattening Facility
|
Shampoo Factory Project Template
|
How to Set Up a Sporting Goods Store
|
Car Rental Business Plan
|
Used Car Resale Project
|
How to Start Selling Chocolate
|
Jewelry Store Layout
|
Chicken Foot Tannery Plant
|
Plant Drugstore
|
How to Make a Music School
|
Turkey slaughter
|
Economic Viability of Meat Boutique
|
Dwg Grandstand
|
What Equipment is Needed to Set Up a Surgical Center?
|
How to Set Up a Project for a Physiotherapy Clinic
|
Project to Open a UTI
|
Motel Drawing Dwg Format
|
Supremecado Project
|
I Want to Open a Squash Court
|
Investment2c .cost Of Bowling Business
|
Sample Projects for Car Washes
|
I want to open a hot meal distribution company
|
Dental Pen Projects
|
Vegetable Bushing Factory
|
Women's Clothing Faction
|
Souvenirs for newborns
|
Companies That Manufacture Suction Cups
|
Wooden Assembly Models
|
Manufacturing with MDF
|
Investment to Open a Block Factory
|
Concrete Plant Layout
|
Setting Up a Cardboard Box Business
|
Cookware Factory Plants
|
Balcony Covers2c Jardins
|
Floor Plan for Dental Prosthetics Laboratory
|
P2f FinancingMilk Production
|
What is needed to set up a bar ice factory?
|
Machinery for Automotive Battery Manufacturing
|
Cosmetic Pop Examples
|
Clinical Analysis Laboratory Pop
|
Project to Set Up a Software Consulting Company
|
Project for Construction of a Forest Nursery
|
How to Set Up a Container Rental Company
|
Express Graphics Project Feasibility
|
Mount a Tachograph
|
Ice Cream Shop Floor Plans
|
How to Finance a Bndes Pizzeria
|
Wine Making Equipment
|
DWG Stretcher Design
|
Tofu Production
|
What You Need to Open a Cemetery
|
Other projects ready:
How to start Factory to Produce Truffles (Stuffed with Chocolate) with capacity for 500 Kg/day.
Project Factory to Produce Granola with capacity for 5.000 Kg per day.
PDF Factory of Honey and Bee Wax Production with an area of 500 m² and capacity for 5.000 liters/day and others by-products (honey, propolis, bee wax, royal jelly and honey composites).
Plant and layout Factory to Produce Banana Flour (Banana in Powder) with capacity for 10.000 Kg per day.
Project Factory to Produce Cold Meat, Charque Dried Salted Meat and Jerked Beef (with Carcass Reception) with capacity for 5.000 Kg/day.
Project Clothing Industry to Produce Caps with capacity for 200 garments/day.
FeasibilityCold Storage Room to Produce Fresh Fish and Fish Products with capacity for 60.000 Kg/day.
Business plant Clothing Industry to Produce Knitting (Rectilinear Knitting Machines) with capacity for 300 garments/day.
Project Industry to Produce Shampoo with capacity for 1.000 liters/day.
How to start Clothing Industry to Produce Jeans Pants with Laundry Sector (Stone Wash) with capacity for 200 garments/day.
Slaughterhouses
Dairy products
Vegetable products
Wine, beer
Cachaça
Mineral Water, Ice
Soft Drink
Breads and Pastas
Candy factories
Ice cream
Honey
Egg processing
Food distributors
Cosmetics, soaps
Shampoo
Cleaning products
Laboratories
Health Units
Hospitals
Drugstores and pharmacies
Pharmaceutical industries
Laundry
Distributors of medicines
Veterinary products
Hotels, Restaurants
Entertainment
Shops and shops
Clothing industry
Plastic
Glass
Wood
Concrete and foundation
Paper
Ceramics
Electronics
Marble and granite
Diversery
Public Works
Services
Rural Constructions
Animal's food factory
Tannery
Industrial effluents
Occupation aren
TALK TO US