Ready project Gymnasium with capacity for 300 alunos per day.

CODE - HT-061

Ready project Gymnasium with capacity for 300 alunos per day.

CODE - HT-061


Project ready with:

Enterprise with the following sections:
Reception
Swimming Pool
Gym Room
Working Out Area
Dressing Rooms
Assessment Room
Office
Service Area
Parking Lot
Other Rooms

The ready project (eBook) contains:

1) Project ready with:
- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph


Projects with other capacities
Gymnasium

How to start Gymnasium with capacity for 300 alunos per day. Project and Layout

OPTIONAL SERVICES:

Projects with other capacities
Gymnasium

To learn more fill out the form:















 

 

 

 

 

 

 

OTHER OPTIONAL PROJECTS AND SERVICES (See prices):

Gym Equipment Financing 5b | Bndes Gymnastics Academy | Bndes Set Up Academy | Gym Equipment Financed | Gym Equipment Financing | Gym Equipment Manufacturer | Bodybuilding Machine Projects | How to Finance a Weight Training Equipment | Build Bodybuilding Equipment | Gymnastics Academy Bnds | Health Academy Dwg File Model Projects | Gymnastics Academy Which Financing To Acquire At Bndes | Gym Equipment Financing | Gym Cleaning Schedule | Gym Schedule Template | Gym Machine Projects | Building a Bodybuilding Gym | Gym Business Plan | Gymnastics Models | Funded Chain | Academy by Bndes | Bndes for opening a gym | Gym Machine Design | Bodybuilding Bnds | How Much Does It Cost To Set Up A Bodybuilding Gym For 300 Students | Weight Training Equipment Financed by Bndes | Project Template for Opening a Gym | Financed Bodybuilding Equipment | Gym Cleaning Schedule Template | Gymnastics Academy Financing Bndes | Gym Equipment Financed by BNDs | Gym Equipment Projects | Financed Gym Equipment | Bodybuilding Equipment Financed | Design Model for Street Gymnastics Apparatus | Gymnastics Equipment By Bnds | Setting Up an Academy Financing | Gym Equipment Financing | Buy Gym Equipment Financed by BNDES | Bndes Sports Academies | Opening a Gym Funded by BNDES | Bndes Gymnasium Financing | BNDES Credit to Set Up a Bodybuilding Gym | Equipment for Bodybuilding Gyms Bndes | Financing to Set Up a Gym | How Can I Open a Gym? | Bndes Loan for Academy | Bodybuilding Financing Companies | Gym Equipment Model | Gym Business Plan | Brown Sugar Manufacturing Equipment Factory | Example of a Farm Project | Car Shampoo Factory | Screw Factory In Brazil | Cost to Assemble a Complete Oil Change | How to Set Up My Roast Chicken Sales Business | Air Conditioning Sales Store Business Plan | How to Set Up a Women's Clothing Store | Beverage Distribution Technology | List of What to Buy to Set Up a Daycare Center | Ostrich Slaughterhouse and Cold Storage | I Want to See Sausage Factory Plans | Salty Factory | Sterile Material Production Form | Projects Houses 250m2 | Vaccine Project Template | Gym Supplies List | Project for Pay-to-Fire | Marmitex Financial Plan | Bar Project Plans | Cafeteria Project Summary | Physical-Financial Schedule of a Garage Building | Hospital Laboratory Equipment Project | How Much Does It Cost To Set Up A Paint Industry | Lingerie Store and Manufacturing Project | Leather Ball Making Machines | PVC Lining Factory In Poços De Caldas | How to Make Styrofoam Board | How to Set Up a Broom and Squeegee Factory | Mortar Making Equipment Manufacturer | Egg Box Manufacturing Machine Brazil | Flowchart of a Metalworking Shop | Cold Zinc Plating | Solo Lab Cost | Oven for drying grated cheese | Manual of Good Practices in the Cosmetics Industry | Floor Plan Drawing of a Body Shop | Quail Egg Factory Layout Model | Pop Clinical Standard Operating Procedure | Documents Required to Open a Cooking Gas Reseller | Barber Shop Name Ideas | How to Open a Commercial Representation | Accounting Office How to Put Together a Business Plan | Business Plan in the Chandeliers Area | Documents to Set Up a Surveillance Firm | How to Build a Wooden Pig Shed | Pasta Factory Equipment | Garlic Bread Industry | Coffee Production Company | Oat Flakes Factories | Equipment for Powder Soft Drink Manufacturing | Initial Investment Dog Hotel |

 

Other projects ready:

How to start Milk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Butter, Yogurt, Milk Beverages, packed Milk types B and C, with capacity of 8000 liters/day.
Project Clothing Industry to Produce Dyeing Fabric (Hippie Clothes) with capacity for 300 garments/day.
PDF Drink Deliverer with capacity for 15.000 liters/day.
Plant and layout Complete Farm for Swine with one Shed with capacity for 9 Matrix and Built area of 110 m² (with Overlapping Bed).
Project Factory to Produce Concentrated Fruit Pulp with capacity for 500 Kg/day.
Project Factory to Produce Raw Palm Oil with capacity for 2.000 liters per day.
FeasibilityIndustry to Produce Soap Powder Pressed in a Bar with capacity for 1.000 Kg/day.
Business plant Cowshed for Milk Cattles with capacity for 60 Cows, with Automatic Milking and Built area of 700 m² and Milk Packaging (TYPE A MILK).
Project Farm to Produce Country Chicken (Frango Caipira) with capacity for 10.000 Chickens per day.
How to start Slaughterhouse Ostrich Slaughter and Cold Meat Production (Sausages, Ham, Cold Meat and Smoked Products) with capacity to Slaughter 700 animals/day.

Project - how to start Gymnasium with capacity for 300 alunos per day.