Ready project Hostel with capacity for 10 Alojamentos.
CODE - HT-065
Ready project Hostel with capacity for 10 Alojamentos.
CODE - HT-065Project ready with:
Enterprise with the following sections:Reception
Rooms
Restaurant
Kitchen
Bathrooms
Laundry
Parking Lot
Administration
Office
Dressing Room
Canteen
The ready project (eBook) contains:
1) Project ready with:- Construction plants
- Layout of the equipment
- Cuts
- Facade
- Situation plant of the construction site
- Plants of the offices, changing rooms, dining rooms and other annexes of the company
2) 3D design
3) Basic construction memorial
4) List of equipment
5) List of Equipment Suppliers
6) List of construction and budget materials
7) Physical-Financial Construction Schedule
8) Production Flowgraph
Projects with other capacities
Hostel
OPTIONAL SERVICES:
- Financial Feasibility Study of Hostel with capacity for 10 Alojamentos.
- Business plan for Hostel with capacity for 10 Alojamentos.
- 3D project of Hostel with capacity for 10 Alojamentos.
Projects with other capacities
Hostel
To learn more contact us by whatsapp:
WhatsApp +5531996091982
OTHER OPTIONAL PROJECTS AND SERVICES (See prices):
Tips for Setting Up a Hostel | Hostel Setting Up Tips | Financing for Hostels | Detergent Manufacturing Equipment | Fc3b4rmas Templates for Soap | Screw Shop Layout | want to set up a lubricant store. | Stores with products for diabetics, celiacs and hypertensive patients | Bakery Financing | Pharmacy Projects With 20m2 | Cawtry Store Templates | Chocolate Business Plan Template | How to Set Up a Meat Processing Company | How Much Does It Cost to Set Up a Nursery? | Sewage Treatment Plant Floor Plan | Equipment for the Pork Rind Industry | Manufacture of Equipment for Construction of Fish Refrigerators | Service Plan Template in the Pedagogical Area | Incinerator Business Plan | Incenerator Price | Motel Building Plans | Pastry Shop Layout | What Do I Need to Set Up a Kitchen to Make Marmitex? | Budget for a Commercial Sauna | Floor Plans for Snack Bar | Online Video Rental Business Plan Template | What Material to Assemble Sterilization | Glass Deposit | Finishing Sector in the Clothing Industry | How Much Does It Cost to Set Up a Plaster Factory | Glass Factory Project | How to MakeIsopor | Cost to assemble a briquette machine | What It Takes to Set Up a Pallet Manufacturing Business | Plaster Factory Name | Notebook Factory | Financing a Metalworking Shop | Cylinder Manufacturing Process | Laboratory Facade | Academic Work on Cosmetics Industry | Good Manufacturing Practices Manual for Food Distributors | Liquid Egg Machines | Hospital Pops Label Template | Set Up My Gas Resale Project Models | Shed Plan | Popcorn Kiosk Budget | Financing to Open a Law Firm | How to Start an Upholstery Repair Shop | What is needed to set up a notary's office? | How to Design a Cake Factory | Bakery Floor Plan Template | Industrialization of Pupunha Palm Heart | Caffeine Factory Investment Chart | Cajuina Factories | How to Set Up a Dog Daycare |
Other projects ready:
How to start Factory to Produce Soy Cheese (Tofu) with capacity for 3.000 Kg per day.
Project Factory to Produce Lollipops, Caramels, Hard Candies, Creams and Fondant, Ice Cream Syrup, Gums and Jell-O, Chewable Candies and Candy Bars with capacity for 5.000 Kg/day.
PDF Graphical with an area of 100 m2.
Plant and layout Factory to Produce Caipirinha Drink with capacity for 5.000 liters/day.
Project Factory to Produce Charque Dried Salted Meat (with Carcass Reception) with capacity for 1.000 Kg/day.
Project Footwear Industry to Produce Boots with capacity for 300 pairs/day.
FeasibilityMilk and Dairy Industry for Fresh Cheese production (Minas Frescal, Ricota, Muzzarela), Matured Cheese (Prato, Minas Standard, Cobocó), Cured Cheese (Provolon and Cured Ricota), Packed Milk types B and C, with capacity of 3000 liters/day.
Business plant Factory to Produce Organic Cachaça (Liquor) with capacity for 5.000 liters/day.
Project Arabic Kitchen with capacity for 500 meals per day.
How to start Marble and Granite Factories to Produce Cutted and Polished Stones and to Cut Marble and Granite Floors with capacity for 10 Blocks per Week.



